← Back
BuildNYC
Two family frame
221 WEIRFIELD STREET
BROOKLYN · BIN 3078314
💬 Discuss this project
1910Year Built
3Stories
B2Building Class
R6Zoning
2,700 sfGross Floor Area
2Units
Two family frame · 2,000 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTwo dwelling unit construction2p · 1 filing · 7 docs
Floor 2Two dwelling unit construction2p · 2 filings · 15 docs
Floor 1Two dwelling unit construction2p · 2 filings · 15 docs
CellarTwo dwelling unit construction3p · 2 filings · 15 docs
Sub-BasementTwo dwelling unit construction2p · 2 filings · 15 docs
Site & exteriorTwo dwelling unit construction1p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/17/2025$2.1M—2WSM HOLDINGS LLC → Private party$778/sf building
02/22/2024$13K—Private party → 2WSM HOLDINGS LLC$5/sf building
02/22/2024$13K—Private party → 2WSM HOLDINGS LLC$5/sf building
02/22/2024$13K—Private party → 2WSM HOLDINGS LLC$5/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL Engineering106/07/2024
CQ&J203/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM Arch603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HP Building ManagementGeneral Contractor303/21/2026
H Building ManagementGeneral Contractor107/08/2026
All Pro Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781103/08/2024
Building Lifecycle
03/07/2025
Signed off — Alteration
B01010674-I1
03/07/2025
Signed off — Alteration
EXISTING 2 FAMILY BRICK HOUSE WITH PLUMBING WORK AT CELLAR, BASEMENT, 1ST & 2ND FLOOR IN CONJUNCTION WITH ALT2 JOB # B01010674-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B01010717-I1
02/19/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
37 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offH Building Management11/27/2024
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating04/03/2024
DOB NOWStructuralSigned-offAngeline Pena-Levi03/18/2024
1 project · most recent 10/27/2025
General Wiring
FiledStatusContractorScope
10/27/2025CompletePSB ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/19/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/10/2024Fail-Final General Construction Non-Directive 14FailView ↗
06/14/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/14/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
06/11/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
06/11/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
06/11/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
06/11/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
06/11/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
03/05/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
03/05/2024Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
03/05/2024Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
03/05/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
03/05/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
03/05/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
03/05/2024MeteringCHRISTIAN LOZADAenergy_progress
03/05/2024Fenestration air leakageCHRISTIAN LOZADAenergy_progress
03/05/2024Fenestration areasCHRISTIAN LOZADAenergy_progress
03/05/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
03/05/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
03/05/2024Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
03/05/2024Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
03/05/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
03/05/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
03/05/2024Structural Wood FrameCHRISTIAN LOZADAprogress
02/26/2024FinalCALVIN TRANprogress
15 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account