← Back
BuildNYC
Walk-up cooperative
221 WEST 20TH STREET
MANHATTAN · BIN 1014029
💬 Discuss this project
1901Year Built
5Stories
C6Building Class
R8BZoning
8,020 sfGross Floor Area
10Units
Rent Stabilized2 Active Violations ▸
Walk-up cooperative · Owner of record: 221 W 20th Owners · 1,975 sf lot · 4.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofStucco repairs and maintenanceUnder Construction3p · 1 filing · 5 docs
Floor 5Stucco repairs and maintenanceUnder Construction3p · 1 filing · 5 docs
Floor 4Unit 4EUnder Construction6p · 2 filings · 8 docs
Floor 3Stucco repairs and maintenanceUnder Construction3p · 1 filing · 5 docs
Floor 2Stucco repairs and maintenanceUnder Construction3p · 1 filing · 5 docs
Floor 1Stucco repairs and maintenanceUnder Construction3p · 1 filing · 5 docs
Site & exteriorProposed Heavy Duty Sidewalk Shed (live Load - 300 Psf)Under Construction9p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
221 W 20th Owners103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services103/14/2026
SW Engineering Company101/28/2026
Serdar Ceylan Architect108/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Boyd Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Phoenix Sutton STRScaffold409/02/2026
Jepol ConstructionGeneral Contractor104/09/2026
New York Park Plumbing & Heating CoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SWL Engineering Inspectio6912101/28/2026
Building Lifecycle
All (27)Filed (3)Permit Issued (6)Signed Off (1)Violation (11)Inspection (3)Special Inspection (3)
09/01/2026
Permit issued — Sidewalk Shed
M01370240-I1-SH
07/15/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/15/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/09/2026
Permit issued — Supported Scaffold
M01370240-I1-SH
04/03/2026
Permit issued — General Construction
M01347796-I1-GC
03/16/2026
Permit issued — Sidewalk Shed
M01370240-I1-SH
03/16/2026
Permit issued — Supported Scaffold
M01370240-I1-SF
03/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01370240-I1
01/28/2026
Filed — Alteration
Work includes sounding the entire street facing facade, remove and replace defective stone with new pre-cast stones, repainting the cornice, repair unsound stucco, and recoating the masonry with a protective sealant. No change to use, egress, or occupancy
M01347796-I1
01/16/2026
Special inspection requirement — Post-installed Anchors
JOSHUA LUCKRITZ
01/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
JOSHUA LUCKRITZ
01/16/2026
Special inspection requirement — Final
Yakov Weinstein
06/04/2025
Violation issued (HPD, closed)
A
05/14/2024
Signed off — Alteration
PLUMBING WORK IN APARTMENT #4E ON THE FOURTH FLOOR AS PER PLANS SUBMITTED.
M00922452-I1
05/10/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/10/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/01/2024
Violation issued (HPD, closed)
A
02/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/08/2024
Permit issued — Plumbing
M00922452-I1-PL
11/15/2023
Violation issued (HPD, closed)
I
08/21/2023
Filed — Alteration
PLUMBING WORK IN APARTMENT #4E ON THE FOURTH FLOOR AS PER PLANS SUBMITTED.
M00922452-I1
03/15/2023
Violation issued (HPD, closed)
A
03/26/2002
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/16/1999
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
09/16/1997
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
02/10/1997
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/18/1993
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPhoenix Sutton STR09/01/2026
DOB NOWSupported ScaffoldPermit IssuedPhoenix Sutton STR06/09/2026
DOB NOWGeneral ConstructionPermit IssuedHudson Meridian Construction GP04/03/2026
DOB NOWSidewalk ShedPermit IssuedPhoenix Sutton STR03/16/2026
DOB NOWSupported ScaffoldPermit IssuedPhoenix Sutton STR03/16/2026
DOB NOWPlumbingSigned-offNew York Park Plumbing & Heating Co01/08/2024
BISEQISSUEDS S Bridging & Scaffoldin04/03/2013
2 projects · most recent 03/13/2026
FiledStatusContractorScope
03/13/2026Permit IssuedRichard Neu—
01/30/2024CompleteRedline Electric—
1 project · most recent 01/28/2026
FiledStatusContractorScope
01/28/2026Permit IssuedJepol Construction1 scope_items
1 project · most recent 03/14/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/14/2026Permit IssuedPhoenix Sutton STRScaffold, Sidewalk Shed
1 project · most recent 01/28/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
01/28/2026Permit IssuedJepol ConstructionTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/10/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
01/16/2026Post-installed AnchorsJOSHUA LUCKRITZspecial
01/16/2026Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
01/16/2026FinalYakov Weinsteinprogress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026M00922452-I1Request digital key ↗
08/19/2026M01347796-I1Request digital key ↗
08/18/2026M01370240-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
04/08/2013121578042Open ↗
▸BISWORK PERMIT APPLICATION1
04/08/2013121578042Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026M00922452-I1Open ↗
08/19/2026M01347796-I1Open ↗
08/18/2026M01370240-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/08/2013121578042Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/08/2013121578042Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/08/2013121578042Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026M01347796-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026M01347796-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/29/2026M00922452-I1Open ↗
08/19/2026M01347796-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
04/08/2013121578042Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/08/2013121578042Open ↗