← Back
BuildNYC
Two family frame
2210 NEWKIRK AVENUE
BROOKLYN · BIN 3120656
💬 Discuss this project
1899Year Built
2.5Stories
B2Building Class
R5BZoning
3,547 sfGross Floor Area
2Units
12 Active Violations 8 unresolved · 4 paperwork only ▸FDNY Report ↗
Two family frame · 7,250 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11 filing
Cellar1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MK Associates110/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/12/2024$1.2M—Private party → Private party$338/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MK Associates110/21/2026
Ashraf209/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Netdt403/21/2026
Building Lifecycle
10/21/2026
Filed — Alteration
Remove existing shed & roof assembly and construct a new modified roof to accommodate the proposed attic layout Work includes roof framing, sheathing, roofing, insulation, flashing, drainage, new interior, fixtures and finishes.
B01452373-I1
10/21/2026
Special inspection requirement — Final
09/29/2025
Filed — Alteration
1. REMOVE PARTITION WALL IN THE CELLAR.2. REMOVE EXIST. BATHROOM IN THE CELLAR.ADDRESS ECB VIOLATION 34881230J AND 34881357R
B01293588-S1
09/29/2025
Filed — Alteration
1. REMOVE PARTITION WALL IN THE CELLAR.2. REMOVE EXIST. BATHROOM IN THE CELLAR.ADDRESS ECB VIOLATION 34881230J AND 34881357R
B01293588-I1
07/24/2025
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
48 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 09/29/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/29/2025——Gas, Water/Sanitary
1 project · most recent 03/20/2025
General Wiring
FiledStatusContractorScope
03/20/2025Permit IssuedClairmont Electrical ContractingGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
10/21/2026Final—progress
10 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account