← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
HAP Ten
2211 3RD AVENUE · BIN 1089662
💬 Discuss this project
2015Year Built
11Stories
RMBuilding Class
C4-6Zoning
127,946 sfGross Floor Area
112Units
LL97 CoveredRent Stabilized25 Active Violations 24 unresolved · 1 paperwork only 2 likely answered 4 old, status unconfirmed ▸FISP: UNSAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 2211 Third Avenue Mazal · 17,661 sf lot · 7.24 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFoodtownUnder Construction3p · 3 filings · 20 docs
Floor 2Foodtown2p · 1 filing · 3 docs
Floor 1Foodtown15p · 4 filings · 20 docs
CellarFoodtown12p · 1 filing · 11 docs
Site & exteriorFoodtownUnder Construction24p · 4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2211 3rd Ave Mazal Manager2403/21/2026
Third Rail Group2003/21/2026
Hap Investments507/08/2026
Paperclip International403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kma Designs105/08/2026
Andres Diaz Architect212/30/2025
Ashraf212/11/2025
S Associates111/13/2025
Walter P Moore110/30/2025
JT Engineering407/17/2023
HC Engineering203/26/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PS Engineers403/21/2026
Kma Designs203/21/2026
JP Expedite403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rennon ConstructionScaffold507/08/2026
Kings Group NYScaffold307/25/2026
PM Mechanical Groupspecialty_contractor303/21/2026
Samuel & Sons P & HPlumbing207/08/2026
Signs CadSign hanger207/08/2026
Tribute Restorationspecialty_contractor104/09/2026
High Quality Electric ofElectrical103/21/2026
BK Construction ServicesScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Francisco D. Perez PE3306212/30/2025
Jian Engineering7397110/30/2025
WPM NY Engineers8597110/30/2025
JT Engineering7840407/17/2023
Building Lifecycle
All (118)Filed (13)Permit Issued (15)Signed Off (3)Facade (FISP) (6)Violation (60)Inspection (5)Objection (6)Special Inspection (10)
09/30/2026
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
09/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/28/2026
Violation issued (ECB, closed)
Elevators
07/24/2026
Permit issued — Sidewalk Shed
M01309981-S1-SH
07/21/2026
Signed off — Alteration
INSTALLATION OF 330 NEW SIDEWALKSHED AT 2211 3rd AVE. AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M08039077-I1
06/05/2026
Violation issued (HPD, open)
B
05/29/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/29/2026
Violation issued (HPD, closed)
B
05/29/2026
Violation issued (HPD, open)
B
05/29/2026
Violation issued (HPD, closed)
B
05/29/2026
Violation issued (HPD, open)
C
05/22/2026
Permit issued — Plumbing
M00716534-I1-PL
05/20/2026
Violation issued (ECB, open)
Construction
05/08/2026
Filed — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
M01309981-S1
05/08/2026
Permit issued — Sidewalk Shed
M01309981-S1-SH
04/29/2026
Permit issued — Sidewalk Shed
M08039077-I1-SH
04/20/2026
Violation issued (ECB, open)
Local Law
12/30/2025
Filed — Alteration
M01308297-P1
12/30/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FRANCISCO PEREZ
12/30/2025
Special inspection requirement — Post-installed Anchors
FRANCISCO PEREZ
12/11/2025
Filed — Alteration
INSTALLATION OF 330 NEW SIDEWALKSHED AT 2211 3rd AVE. AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M08039077-P1
12/02/2025
Cycle 9 facade report submitted
12/02/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FRANCISCO PEREZ
12/02/2025
Special inspection requirement — Post-installed Anchors
FRANCISCO PEREZ
12/01/2025
Cycle 9 facade report signed — UNSAFE
11/18/2025
Cycle 9 facade inspection completed
11/14/2025
Permit issued — Supported Scaffold
M01318655-I1-SF
11/13/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC
M01318655-I1
11/13/2025
Permit issued — General Construction
M01309981-I1-GC
11/05/2025
Permit issued — Suspended Scaffold
M01308297-I1-SC
11/03/2025
Filed — Alteration
M01308297-I1
10/30/2025
Filed — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
M01309981-I1
10/28/2025
Special inspection requirement — Masonry
Christopher Pinto
10/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
JIAN DENG
10/28/2025
Special inspection requirement — Final
Matthew Cronin
07/30/2025
Violation issued (HPD, open)
B
07/30/2025
Violation issued (HPD, open)
B
04/30/2025
Permit issued — Sidewalk Shed
M08039077-I1-SH
04/10/2025
Violation issued (HPD, open)
B
04/10/2025
Violation issued (HPD, open)
A
02/18/2025
Permit issued — Sidewalk Shed
M08039077-I1-SH
11/22/2024
Violation issued (HPD, closed)
I
10/16/2024
Violation issued (ECB, open)
Construction
10/16/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/16/2024
Violation issued (ECB, open)
Construction
03/12/2024
Violation issued (HPD, closed)
B
03/12/2024
Violation issued (HPD, closed)
A
02/22/2024
Permit issued — Sidewalk Shed
M08039077-I1-SH
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/21/2024
Violation issued (HPD, closed)
B
02/21/2024
Violation issued (HPD, closed)
C
02/21/2024
Violation issued (HPD, closed)
A
02/21/2024
Violation issued (HPD, closed)
B
02/21/2024
Violation issued (HPD, closed)
C
02/15/2024
Violation issued (ECB, open)
Local Law
01/02/2024
Violation issued (HPD, closed)
B
01/02/2024
Violation issued (HPD, closed)
A
01/02/2024
Violation issued (HPD, closed)
B
01/02/2024
Violation issued (HPD, closed)
B
01/02/2024
Violation issued (HPD, closed)
B
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedKings Group NY07/24/2026
DOB NOWPlumbingPermit IssuedSamuel & Sons P & H05/22/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY05/08/2026
DOB NOWSidewalk ShedSigned-offRennon Construction04/29/2026
DOB NOWSupported ScaffoldPermit IssuedKings Group NY11/14/2025
DOB NOWGeneral ConstructionPermit IssuedTribute Restoration11/13/2025
DOB NOWSuspended ScaffoldPermit IssuedTribute Restoration11/05/2025
DOB NOWSidewalk ShedSigned-offBK Construction Services04/30/2025
DOB NOWSidewalk ShedSigned-offRennon Construction02/18/2025
DOB NOWSidewalk ShedSigned-offRennon Construction02/22/2024
DOB NOWMechanical SystemsPermit IssuedPM Mechanical Group01/18/2023
DOB NOWSidewalk ShedSigned-offRennon Construction11/16/2022
DOB NOWPlumbingPermit IssuedSamuel & Sons P & H09/09/2022
DOB NOWSignSigned-offSigns Cad03/29/2018
DOB NOWSignSigned-offSigns Cad03/27/2018
BISPLISSUEDPremier Pipe Solutions01/10/2020
BISMHISSUEDPeterkin Construction11/28/2018
BISPLISSUEDPrecision Plumbing Services02/27/2018
BISOTISSUEDConsulting Remodling02/26/2018
BIS—RE-ISSUEDAnthony T. Rinaldi12/06/2017
BIS—ISSUEDAnthony T. Rinaldi07/31/2017
BIS—ISSUEDAnthony T. Rinaldi07/27/2017
BIS—ISSUEDAnthony T. Rinaldi07/27/2017
BIS—ISSUEDAnthony T. Rinaldi07/27/2017
BIS—ISSUEDAnthony T. Rinaldi07/03/2017
BIS—ISSUEDAnthony T. Rinaldi07/03/2017
BIS—ISSUEDAnthony T. Rinaldi06/27/2017
BISEQISSUEDRockledge Scaffold06/21/2017
BISEQISSUEDRockledge Scaffold06/06/2017
BISSDISSUEDDC Building Services06/06/2017
BISEQISSUEDRockledge Scaffold06/01/2017
BISEQISSUEDRockledge Scaffold06/01/2017
BISEQISSUEDAnthony T. Rinaldi05/02/2017
BISBLISSUEDDC Building Services04/12/2017
BISPLISSUEDDC Building Services01/16/2017
BISEQISSUEDBayport Construction10/21/2016
BIS—ISSUEDAnthony T. Rinaldi07/13/2016
BIS—ISSUEDAnthony T. Rinaldi07/12/2016
BISEQISSUEDRockledge Scaffold07/07/2016
BISEQRE-ISSUEDRockledge Scaffold06/30/2016
+ 25 more permits on file
1 project · most recent 07/11/2022
Ventilation Systems
FiledStatusContractorScope
07/11/2022Permit IssuedPM Mechanical GroupVentilation Systems
1 project · most recent 07/17/2023
Gas
FiledStatusContractorScope
07/17/2023Permit IssuedSamuel & Sons P & HGas
8 projects · most recent 04/23/2026
General Wiring
FiledStatusContractorScope
04/23/2026Permit IssuedFirst Choice Electrical—
07/16/2025Permit IssuedBLZ ElectricGeneral Wiring
11/04/2022Permit IssuedHigh Quality Electric of—
10/13/2022Permit IssuedRobert Chimenti22 meters, 1 new_meters
10/30/2018CompleteSteel City Electrical ConGeneral Wiring
05/12/2018CompleteAmpere Electrical Services—
05/12/2018CompleteAmpere Electrical Services—
02/24/2018CancelledSteel City Electrical ConGeneral Wiring
3 projects · most recent 05/08/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
05/08/2026Permit IssuedKings Group NYSidewalk Shed
12/11/2025Signed-offRennon ConstructionSidewalk Shed
11/13/2025Permit IssuedKings Group NYScaffold
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/30/2026Certified Medical Gas - MG - PL - FinishCertifiedView ↗
09/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/19/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
12/30/2025Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
12/30/2025Post-installed AnchorsFRANCISCO PEREZspecial
12/02/2025Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
12/02/2025Post-installed AnchorsFRANCISCO PEREZspecial
10/28/2025MasonryChristopher Pintospecial
10/28/2025Tenant Protection Plan ComplianceJIAN DENGspecial
10/28/2025FinalMatthew Croninprogress
07/17/2023Fire-Resistant Penetrations and JointsJafet Tavarezspecial
04/06/2023Fire-Resistant Penetrations and JointsJafet Tavarezspecial
03/15/2018FinalHackjong Choiprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
FoodtownRetailCellar, Floors 1, 2
Project M00716534 Alteration · Permit Entire · 07/14/2022
Project M00716525 Alteration · Permit Entire · 07/11/2022
Project M00027570 Alteration · LOC Issued · 03/26/2018
Project M00027584 Alteration · LOC Issued · 03/26/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 314 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/06/2026M00027570-I1Request digital key ↗
09/06/2026M00027584-I1Request digital key ↗
08/31/2026M00716534-P2Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits79
▸BISPLAN / WORK APPROVAL APPLICATION52
11/05/2021123706463Open ↗
06/07/2021123706463Open ↗
04/05/2021123706463Open ↗
Showing 3 of 52 on file for this type
▸BISWORK PERMIT APPLICATION26
09/10/2021123706463Open ↗
01/13/2020123706463Open ↗
11/21/2019123706463Open ↗
Showing 3 of 26 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications73
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
03/17/2020122245588Open ↗
07/02/2019123706463Open ↗
03/25/2019123706463Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/06/2026M00027584-I1Open ↗
08/31/2026M00716534-I1Open ↗
08/31/2026M00716534-P1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
02/06/2018122245588Open ↗
12/20/2016122972051Open ↗
09/26/2016140549529Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/15/2026M01308297-I1Open ↗
09/15/2026M01308297-I1Open ↗
08/31/2026M01309981-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
02/06/2018122245588Open ↗
01/03/2017122972051Open ↗
07/05/2016122736726Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/26/2016140549529Open ↗
07/06/2016140517803Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/26/2016140549529Open ↗
07/06/2016140517803Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026M01309981-I1Open ↗
08/29/2026M00027584-I1Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING5
06/07/2021123706463Open ↗
02/03/2017140222444Open ↗
Showing 2 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
01/14/2021123375971Open ↗
08/15/2018122082049Open ↗
07/19/2017123089139Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/25/2019123706463Open ↗
02/06/2018122245588Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
08/16/2017122972051Open ↗
12/20/2016122972051Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
04/25/2017140549529Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
02/06/2018122245588Open ↗
▸Environmental & Asbestos19
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
02/16/2018122245588Open ↗
09/26/2016140549529Open ↗
07/06/2016140517803Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026M00716534-P1Open ↗
08/31/2026M00716534-P2Open ↗
08/31/2026M00716534-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed2
09/06/2026M00027584-I1Open ↗
08/13/2026M00027570-I1Open ↗
▸DOB NOWOER: Notice of Satisfaction2
09/06/2026M00027584-I1Open ↗
08/13/2026M00027570-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/25/2019123706463Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
01/26/2021123375971Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
03/17/2020122245588Open ↗
07/02/2019123706463Open ↗
03/25/2019123706463Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
03/17/2020122245588Open ↗
08/29/2018122972051Open ↗
08/17/2018122972051Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/05/2021123706463Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
04/05/2021123706463Open ↗
09/26/2016140549529Open ↗
07/06/2016140517803Open ↗
Showing 3 of 5 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
03/17/2020122245588Open ↗
▸Approvals, Objections & Sign-offs25
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
01/26/2021123375971Open ↗
03/17/2020122245588Open ↗
08/29/2018122972051Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/18/2017122972051Open ↗
10/18/2017122263585Open ↗
06/13/2017122736628Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT12
02/11/2021123375971Open ↗
02/05/2021123375971Open ↗
03/17/2020122245588Open ↗
Showing 3 of 12 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/26/2021123375971Open ↗
▸Filing & Intake Forms52
▸BISADDITIONAL INFORMATION19
08/11/2021123706463Open ↗
01/17/2020122245588Open ↗
01/16/2020122245588Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET15
03/25/2019123706463Open ↗
08/16/2018123375971Open ↗
02/06/2018122245588Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM13
09/10/2021123706463Open ↗
03/17/2020122245588Open ↗
08/29/2018122972051Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
09/26/2016140549529Open ↗
07/06/2016140517803Open ↗
Showing 2 of 4 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
07/19/2017123089139Open ↗
02/28/2017122993788Open ↗
02/28/2017122993788Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01308297-P1Open ↗
08/13/2026M01308297-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01308297-I1Open ↗
08/13/2026M01308297-P1Open ↗