← Back
Predominantly retail with other uses
2211 86 STREET
BROOKLYN · BIN 3165955
💬 Discuss this project
1926Year Built
3Stories
K4Building Class
R5Zoning
3,623 sfGross Floor Area
3Units
Rent Stabilized9 Open Violations 8 unresolved · 1 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: HARVEST HOLDING LLC · 2,250 sf lot · 1.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 13p · 2 filings · 20 docs
1 job · most recent 11/04/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/04/2024Signed-offHIGH QUALITY CONSTRUCTIONAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-SM36NAMHZ2-U1 36,000 BTU · Condensing Unit ×2
MXZ-SM36NAMHZ2 36,000 BTU · Condensing Unit ×1
4 jobs · most recent 08/01/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
08/01/2025CompleteA ELECTRICAL MAIN SVC INCGeneral Wiring
06/10/2025CompleteA ELECTRICAL MAIN SVC INCHVAC Wiring
11/08/2024Permit IssuedWCK ELECTRIC CORP.—
10/04/2024CompleteA ELECTRICAL MAIN SVC INC3 meters, 3 new_meters
1 job · most recent 06/14/2024
Steel Concrete Wood
FiledStatusContractorScope
06/14/2024——Steel, Concrete, Wood
Building Lifecycle
All (81)Filed (9)Permit Issued (8)Signed Off (6)Violation (23)Inspection (4)Objection (6)Special Inspection (25)
08/12/2026
Signed off — Alteration
EXTERIOR RENOVATION OF EXISTING MIXED-USE BUILDING WITH THE INSTALLATION OF A NEW COMMERCIAL AWNING IN THE FRONT YARD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY OF THE SPACE.
B01432409-I1
08/06/2026
Permit issued — General Construction
B01432409-I1-GC
07/17/2026
Filed — Alteration
EXTERIOR RENOVATION OF EXISTING MIXED-USE BUILDING WITH THE INSTALLATION OF A NEW COMMERCIAL AWNING IN THE FRONT YARD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY OF THE SPACE.
B01432409-I1
07/17/2026
Signed off — Alteration
INSTALLATION OF A SIGN FOR THE 1ST FLOOR COMMERCIAL SPACE FACING 86TH STREET AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01096447-I1
07/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
07/16/2026
Special inspection requirement — Final
Manuel Ramirez Lachica
06/08/2026
Permit issued — General Construction
B01096447-I1-GC
12/16/2025
Filed — Alteration
INSTALLATION OF A SIGN FOR THE 1ST FLOOR COMMERCIAL SPACE FACING 86TH STREET AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01096447-S1
11/24/2025
Violation issued (HPD, closed)
I
11/06/2025
Signed off — Alteration
B01130089-I1
11/05/2025
Signed off — Alteration
RENOVATION OF AN EXISTING MIXED USED BUILDING WITH THE REMOVAL OF PARTITION WALLS, REPLACING DOORS, REPAIRING FLOORS, CEILINGS, NEW PARTITION, PAINTING, AND MECHANICAL WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01101056-I1
10/20/2025
Signed off — Alteration
B01121486-I1
07/08/2025
Signed off — Alteration
RENOVATION OF AN EXISTING MIXED USED BUILDING WITH THE REMOVAL OF PARTITION WALLS, REPLACING DOORS, REPAIRING FLOORS, CEILINGS, NEW PARTITION, PAINTING, AND MECHANICAL WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01101056-S1
06/24/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/27/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
11/29/2024
Special inspection requirement — Final
Chun Feng
11/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
11/29/2024
Special inspection requirement — Duct leakage testing, insulation and design
Chun Feng
11/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
11/29/2024
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
11/29/2024
Special inspection requirement — Insulation placement and R values
Chun Feng
11/29/2024
Special inspection requirement — Interior lighting power
Chun Feng
11/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
Chun Feng
11/06/2024
Permit issued — Sidewalk Shed
B01121486-I1-SH
11/05/2024
Filed — Alteration
B01121486-I1
11/04/2024
Filed — Alteration
RENOVATION OF AN EXISTING MIXED USED BUILDING WITH THE REMOVAL OF PARTITION WALLS, REPLACING DOORS, REPAIRING FLOORS, CEILINGS, NEW PARTITION, PAINTING, AND MECHANICAL WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01101056-P1
11/04/2024
Special inspection requirement — Duct leakage testing, insulation and design
Chun Feng
11/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
11/04/2024
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
11/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
11/04/2024
Special inspection requirement — Final
Chun Feng
11/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
Chun Feng
11/04/2024
Special inspection requirement — Insulation placement and R values
Chun Feng
11/04/2024
Special inspection requirement — Interior lighting power
Chun Feng
11/01/2024
Permit issued — General Construction
B01130089-I1-GC
11/01/2024
Violation issued (ECB, closed)
Construction
10/24/2024
Filed — Alteration
B01130089-I1
09/10/2024
Permit issued — Plumbing
B01101056-S1-PL
08/30/2024
Permit issued — Mechanical Systems
B01101056-I1-MS
08/30/2024
Permit issued — General Construction
B01101056-I1-GC
08/29/2024
Permit issued — General Construction
B01096447-I1-GC
08/27/2024
Filed — Alteration
RENOVATION OF AN EXISTING MIXED USED BUILDING WITH THE REMOVAL OF PARTITION WALLS, REPLACING DOORS, REPAIRING FLOORS, CEILINGS, NEW PARTITION, PAINTING, AND MECHANICAL WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01101056-I1
08/27/2024
Filed — Alteration
RENOVATION OF AN EXISTING MIXED USED BUILDING WITH THE REMOVAL OF PARTITION WALLS, REPLACING DOORS, REPAIRING FLOORS, CEILINGS, NEW PARTITION, PAINTING, AND MECHANICAL WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01101056-S1
08/19/2024
Objection raised — Inspections
08/19/2024
Objection resolved — Addressed
08/19/2024
Objection raised — Inspections
08/19/2024
Objection resolved — Addressed
08/19/2024
Objection raised — Scope
08/19/2024
Objection resolved — Addressed
08/15/2024
Filed — Alteration
INSTALLATION OF A SIGN FOR THE 1ST FLOOR COMMERCIAL SPACE FACING 86TH STREET AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01096447-I1
06/14/2024
Filed — Alteration
PROPOSED FACADE ALTERATION WITH NEW STOREFRONT WINDOW AND METAL CLADDING, MINOR PARTITIONS WORK AT FIRST FLOOR, REPLACED EXISTING STAIR AT CELLAR WITH MINOR STRUCTURAL WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01065086-I1
06/12/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
MD ISLAM
06/12/2024
Special inspection requirement — Fenestration areas
MD ISLAM
06/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
MD ISLAM
06/12/2024
Special inspection requirement — Interior lighting power
MD ISLAM
06/12/2024
Special inspection requirement — Fenestration air leakage
MD ISLAM
06/12/2024
Special inspection requirement — Energy Code Compliance Inspections
MD ISLAM
06/11/2024
Special inspection requirement — Final
MD ISLAM
Latest 60 of 81 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CREATIVE BUILDERS404/09/2026
HARVEST HOLDING703/22/2026
HIGH QUALITY CONSTRUCTION103/22/2026
OWNER OF 2211 86 ST203/22/2026
BAY PARKWAY EQUITIES803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/11/2017$3.5M—— → —$963/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SELF EMPLOYEE107/17/2026
CHUN FENG, ARCHITECT512/16/2025
ASHRAF CORP111/05/2024
NY BUILDING ASSOCIATES INC108/15/2024
BARRY DONALDSON ARCHITECTS106/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES203/21/2026
HIGH QUALITY 3381203/21/2026
S M TAM ARCHITECT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGH QUALITY CONSTRUCTIONGeneral Contractor504/09/2026
A ELECTRICAL MAIN SVC INCElectrical203/22/2026
MERCURY BUILDING ASSOGeneral Contractor208/07/2026
CREATIVE BUILDERS, INCGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244407/17/2026
SQ. ARCH, LLC4802512/16/2025
RI CONSULTING SERVICES IN8904106/14/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMERCURY BUILDING ASSO INC08/06/2026
DOB NOWGeneral ConstructionSigned-offMERCURY BUILDING ASSO INC06/08/2026
DOB NOWSidewalk ShedSigned-offCREATIVE BUILDERS, INC11/06/2024
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION11/01/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/10/2024
DOB NOWMechanical SystemsSigned-offHIGH QUALITY CONSTRUCTION08/30/2024
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION08/30/2024
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION08/29/2024
BISMHISSUEDFIRST STAR CONSTRUCTION I05/22/2014
BISOTISSUEDCAPEZZANO CONSTRUCTION02/25/2010
BISPLISSUEDADVANCED PLBG MECH & SPKS02/10/2010
BISFPISSUEDN.Y BUSINESS FIRE SYS INC09/11/2009
BISPLISSUEDADVANCED PLBG MECH & SPKS08/06/2009
BISEQISSUEDASIAN AMERICAN CONSTR INC07/29/2009
BISMHISSUEDASIAN AMERICAN CONSTR INC07/29/2009
BISMHISSUEDCAPEZZANO CONSTRUCTION07/27/2009
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/27/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
07/17/2026Tenant Protection Plan ComplianceNARESH MAHANGUspecial
07/16/2026FinalManuel Ramirez Lachicaprogress
11/29/2024FinalChun Fengprogress
11/29/2024Energy Code Compliance InspectionsChun Fengprogress
11/29/2024Duct leakage testing, insulation and designChun Fengenergy_progress
11/29/2024Fire-Resistant Penetrations and JointsChun Fengspecial
11/29/2024Mechanical SystemsNARESH MAHANGUspecial
11/29/2024Insulation placement and R valuesChun Fengenergy_progress
11/29/2024Interior lighting powerChun Fengenergy_progress
11/29/2024Fire-Resistance Rated ConstructionChun Fengprogress
11/04/2024Duct leakage testing, insulation and designChun Fengenergy_progress
11/04/2024Fire-Resistant Penetrations and JointsChun Fengspecial
11/04/2024Mechanical SystemsNARESH MAHANGUspecial
11/04/2024Energy Code Compliance InspectionsChun Fengprogress
11/04/2024FinalChun Fengprogress
11/04/2024Fire-Resistance Rated ConstructionChun Fengprogress
11/04/2024Insulation placement and R valuesChun Fengenergy_progress
11/04/2024Interior lighting powerChun Fengenergy_progress
06/12/2024Wall Panels, Curtain Walls, and VeneersMD ISLAMspecial
06/12/2024Fenestration areasMD ISLAMenergy_progress
06/12/2024Fenestration and door U-factor and product ratingsMD ISLAMenergy_progress
06/12/2024Interior lighting powerMD ISLAMenergy_progress
06/12/2024Fenestration air leakageMD ISLAMenergy_progress
06/12/2024Energy Code Compliance InspectionsMD ISLAMprogress
06/11/2024FinalMD ISLAMprogress
▾Documents — 130 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026B01065086-I1Request digital key ↗
08/23/2026B01130089-I1Request digital key ↗
08/23/2026B01101056-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits24
▸BISWORK PERMIT APPLICATION13
05/22/2014340145701Open ↗
05/19/2014340145701Open ↗
09/13/2010320169349Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
05/19/2014340145701Open ↗
04/11/2012320169349Open ↗
01/20/2012320169349Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature19
09/24/2026B01101056-P1Open ↗
09/24/2026B01101056-P1Open ↗
09/24/2026B01101056-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026B01130089-I1Open ↗
08/23/2026B01101056-P1Open ↗
08/23/2026B01101056-S1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
06/21/2014340145701Open ↗
03/27/2012320169349Open ↗
07/19/2010320043181Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/24/2026B01101056-P1Open ↗
09/24/2026B01101056-P1Open ↗
08/28/2026B01432409-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/19/2014340145701Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/19/2014340145701Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/19/2014340145701Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING7
11/22/2010320169349Open ↗
06/10/2010320169349Open ↗
10/05/2009320039196Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS3
06/21/2014340145701Open ↗
06/21/2014340145701Open ↗
08/10/2010320043181Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
01/03/2011320169349Open ↗
11/12/2009320039196Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT2
06/21/2014340145701Open ↗
07/23/2010320043181Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B01101056-S1Open ↗
08/23/2026B01101056-P1Open ↗
08/23/2026B01101056-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
06/10/2010320169349Open ↗
07/01/2009320043181Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/19/2014340145701Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/13/2009320062757Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/19/2014340145701Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/21/2014340145701Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/19/2014340145701Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/21/2014340145701Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/19/2014340145701Open ↗
▸Approvals, Objections & Sign-offs11
▸BISADMINISTRATIVE OBJECTIONS4
06/10/2010320169349Open ↗
08/13/2009320062757Open ↗
07/01/2009320043181Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST4
06/21/2014340145701Open ↗
04/19/2012320169349Open ↗
04/16/2012320169349Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/21/2014340145701Open ↗
05/22/2014340145701Open ↗
03/27/2012320169349Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
06/21/2014340145701Open ↗
05/19/2014340145701Open ↗
03/27/2012320169349Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
06/10/2010320169349Open ↗
08/13/2009320062757Open ↗
06/26/2009320039196Open ↗
▸BISADDITIONAL INFORMATION2
01/25/2012320169349Open ↗
08/20/2009320039196Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/19/2014340145701Open ↗
▸Other Documents1
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
11/10/2009320039196Open ↗