← Back
Stand-alone food establishment
2211 HYLAN BOULEVARD
STATEN ISLAND · New Dorp-Midland Beach · BIN 5051736
💬 Discuss this project
1960Year Built
1Stories
K5Building Class
R3-2Zoning
1,288 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Stand-alone food establishment · Owner of record: 2211 HYLAN LLC · 5,800 sf lot · 0.22 FAR built · Flood zone AE
Locations of Work
Plumbing
Floor 113p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EMPIRE EQUITIES1307/08/2026
EMPIRE EQUITIES OF NY LLC1203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZELTA DESIGN507/16/2024
JUST CONSULTING ENGINEERING106/27/2024
ZENITH HOME INSPECTIONS201/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EPAC BUILDING CONSULTING INC1003/21/2026
LOUIS STRIAR403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL AMERICAN CONSTRUCTIONGeneral Contractor307/08/2026
SIGNSTAR NYCScaffold207/08/2026
LIFE SPOT ELECTRIC CORPElectrical103/22/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZELTA INSPECT LLC7764307/16/2024
Building Lifecycle
All (60)Filed (8)Permit Issued (5)Signed Off (4)Violation (2)Inspection (4)Objection (7)Special Inspection (30)
11/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/27/2024
Signed off — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S00936987-I1
07/23/2024
Objection raised — Other
07/23/2024
Objection raised — Other
07/23/2024
Objection raised — Other
07/23/2024
Objection raised — Other
07/22/2024
Signed off — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S00936987-S1
07/17/2024
Special inspection requirement — Ventilation and air distribution system
ERIK LIEPINS
07/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
ERIK LIEPINS
07/17/2024
Special inspection requirement — Duct leakage testing, insulation and design
ERIK LIEPINS
07/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
07/17/2024
Special inspection requirement — Shutoff dampers
ERIK LIEPINS
07/17/2024
Special inspection requirement — Maintenance information
ERIK LIEPINS
07/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIK LIEPINS
07/17/2024
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
07/17/2024
Special inspection requirement — Final
ERIK LIEPINS
07/17/2024
Special inspection requirement — Mechanical Systems
ERIK LIEPINS
07/16/2024
Filed — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S00936987-P3
07/09/2024
Objection raised — Other
07/09/2024
Objection raised — Other
07/09/2024
Objection raised — Structural
06/27/2024
Filed — Alteration
Filing structural work type for a new canopy installation off the side of the building
S01051415-I1
06/27/2024
Special inspection requirement — Concrete - Cast-In-Place
06/17/2024
Signed off — Alteration
S00976300-I1
06/17/2024
Signed off — Alteration
S00976301-I1
06/04/2024
Special inspection requirement — Mechanical Systems
ERIK LIEPINS
06/04/2024
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
06/04/2024
Special inspection requirement — Final
ERIK LIEPINS
06/04/2024
Special inspection requirement — Duct leakage testing, insulation and design
ERIK LIEPINS
06/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIK LIEPINS
06/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
06/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
ERIK LIEPINS
06/04/2024
Special inspection requirement — Ventilation and air distribution system
ERIK LIEPINS
06/04/2024
Special inspection requirement — Maintenance information
ERIK LIEPINS
06/04/2024
Special inspection requirement — Shutoff dampers
ERIK LIEPINS
05/14/2024
Special inspection requirement — Final
05/14/2024
Special inspection requirement — Structural Steel - Details
04/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/05/2024
Permit issued — Sign
S00976301-I1-SG
01/05/2024
Permit issued — Sign
S00976300-I1-SG
01/04/2024
Filed — Alteration
S00976300-I1
01/04/2024
Filed — Alteration
S00976301-I1
12/07/2023
Filed — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S00936987-P2
12/06/2023
Special inspection requirement — Maintenance information
ERIK LIEPINS
12/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
12/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
ERIK LIEPINS
12/06/2023
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
11/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/30/2023
Permit issued — Plumbing
S00936987-S2-PL
10/26/2023
Permit issued — Mechanical Systems
S00936987-S1-MS
10/23/2023
Filed — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S00936987-S1
10/23/2023
Filed — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S00936987-S2
10/10/2023
Permit issued — General Construction
S00936987-I1-GC
10/06/2023
Filed — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S00936987-I1
09/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
ERIK LIEPINS
09/20/2023
Special inspection requirement — Fenestration areas
ERIK LIEPINS
09/20/2023
Special inspection requirement — Air barrier - visual inspection
ERIK LIEPINS
10/19/2006
Violation issued (ECB, closed)
Construction
07/22/1997
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offSIGNSTAR NYC01/05/2024
DOB NOWSignSigned-offSIGNSTAR NYC01/05/2024
DOB NOWPlumbingPermit IssuedDPH PLUMBING & HTG CORP10/30/2023
DOB NOWMechanical SystemsSigned-offALL AMERICAN CONSTRUCTION10/26/2023
DOB NOWGeneral ConstructionSigned-offALL AMERICAN CONSTRUCTION10/10/2023
BISFPISSUEDIDEAL FIRE SYSTEMS IN07/26/2006
BISPLISSUEDWALTER J.GRANDE P & H INC05/08/2006
BIS—ISSUEDM.W.S. CONSTRUCTION INC04/17/2006
BIS—ISSUEDSTERIMARK MOTORS,THE CAR PLACE02/25/1999
1 project · most recent 07/16/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/16/2024Signed-offALL AMERICAN CONSTRUCTIONAir Conditioning Systems
Cooling
Gree 3VIR18HP230V1BO 2 tons · Condensing Unit ×2
GMV-60WL/C-T(U) 5 tons · Vrf Outdoor ×2
1 project · most recent 07/16/2024
Gas Water/Sanitary
FiledStatusContractorScope
07/16/2024Permit IssuedDPH PLUMBING & HTG CORPGas, Water/Sanitary
3 projects · most recent 05/01/2024
General Wiring
FiledStatusContractorScope
05/01/2024Permit IssuedKJK ELECTRIC INCGeneral Wiring
01/09/2024CompleteLIFE SPOT ELECTRIC CORP—
01/09/2024CompleteLIFE SPOT ELECTRIC CORP—
1 project · most recent 06/27/2024
Steel Concrete
FiledStatusContractorScope
06/27/2024——Steel, Concrete
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/28/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
07/17/2024Ventilation and air distribution systemERIK LIEPINSenergy_progress
07/17/2024HVAC-R and service water heating system controlsERIK LIEPINSenergy_progress
07/17/2024Duct leakage testing, insulation and designERIK LIEPINSenergy_progress
07/17/2024HVAC-R and service water heating equipmentERIK LIEPINSenergy_progress
07/17/2024Shutoff dampersERIK LIEPINSenergy_progress
07/17/2024Maintenance informationERIK LIEPINSenergy_progress
07/17/2024HVAC-R and service water piping design and insulationERIK LIEPINSenergy_progress
07/17/2024Energy Code Compliance InspectionsERIK LIEPINSprogress
07/17/2024FinalERIK LIEPINSprogress
07/17/2024Mechanical SystemsERIK LIEPINSspecial
06/27/2024Concrete - Cast-In-Place—special
06/04/2024Mechanical SystemsERIK LIEPINSspecial
06/04/2024Energy Code Compliance InspectionsERIK LIEPINSprogress
06/04/2024FinalERIK LIEPINSprogress
06/04/2024Duct leakage testing, insulation and designERIK LIEPINSenergy_progress
06/04/2024HVAC-R and service water piping design and insulationERIK LIEPINSenergy_progress
06/04/2024HVAC-R and service water heating equipmentERIK LIEPINSenergy_progress
06/04/2024HVAC-R and service water heating system controlsERIK LIEPINSenergy_progress
06/04/2024Ventilation and air distribution systemERIK LIEPINSenergy_progress
06/04/2024Maintenance informationERIK LIEPINSenergy_progress
06/04/2024Shutoff dampersERIK LIEPINSenergy_progress
05/14/2024Final—progress
05/14/2024Structural Steel - Details—special
12/06/2023Maintenance informationERIK LIEPINSenergy_progress
12/06/2023HVAC-R and service water heating equipmentERIK LIEPINSenergy_progress
Latest 25 of 38.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Bonchon Korean Fried ChickenRestaurant / Food Service—
Project S00976300 Alteration · LOC Issued · 01/04/2024
Project S00976301 Alteration · LOC Issued · 01/04/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026S00936987-P3Request digital key ↗
08/22/2026S00936987-P2Request digital key ↗
08/22/2026S00936987-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026S00936987-P2Open ↗
09/02/2026S00936987-P2Open ↗
09/02/2026S00936987-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026S00936987-P3Open ↗
08/22/2026S00936987-P2Open ↗
08/22/2026S00936987-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026S00936987-S1Open ↗
08/25/2026S00936987-P3Open ↗
08/23/2026S00936987-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/22/2026S00936987-P2Open ↗
08/22/2026S00936987-S2Open ↗
08/22/2026S00936987-S1Open ↗
Showing 3 of 7 on file for this type