← Back
BuildNYC
Over six families without stores
Fiorentino Plaza-3
2215 PITKIN AVENUE · BIN 3328464
💬 Discuss this project
1970Year Built
4Stories
C1Building Class
R7AZoning
73,900 sfGross Floor Area
16Units
LL97 CoveredRent Stabilized2 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: Boulevard Together Owner · 35,000 sf lot · 2.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBoulevard Together plumbing replacement73p · 5 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 4Boulevard Together plumbing replacement56p · 3 filings · 20 docs
Floor 3Boulevard Together plumbing replacement56p · 3 filings · 20 docs
Floor 2Boulevard Together plumbing replacement56p · 3 filings · 20 docs
Floor 1Boulevard Together plumbing replacement60p · 4 filings · 20 docs
CellarBoulevard Together plumbing replacement17p · 3 filings · 20 docs
Site & exteriorBoulevard Together Building #25 exterior repairs48p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority3807/08/2026
Boulevard Together Developer1607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP Engineering906/12/2025
Peter Clements Architect905/30/2025
M. Hamdi Gunal, PE, P402/04/2025
Joel Phagoo P.E308/18/2023
Ashraf208/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Betro Design Group2203/21/2026
Rennon Construction403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.M.K. ContractingGeneral Contractor1107/08/2026
Rennon ConstructionScaffold307/08/2026
M & M Piping and HeatingPlumbing207/08/2026
Neelam ConstructionScaffold203/21/2026
Skyline RestorationScaffold207/08/2026
Selectric Electrical Cont Co IElectrical103/21/2026
MNK EnterprisesScaffold107/08/2026
Tru-Val ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Amaracon Testing & Inspec58421105/30/2025
EP Inspections and Commis70791605/30/2025
M. Hamdi Gunal, PE3000210/15/2021
Building Lifecycle
All (104)Filed (27)Permit Issued (14)Signed Off (10)Violation (9)Inspection (2)Objection (12)Special Inspection (30)
03/17/2026
Signed off — Alteration
REPLACE ALL EXISTING ROOF EXHAUST FANS, INSTALL NEW LOUVER AND CEILING EXHAUST FANS, INSTALL NEW RADIATOR COVERS AND REPLACE EXISTING GRILLE AS PER PLANS FILED.
B00539309-I1
01/23/2026
Violation issued (HPD, closed)
C
12/31/2025
Violation issued (HPD, closed)
C
11/23/2025
Violation issued (FDNY_ORDER, closed)
06/25/2025
Signed off — Alteration
REMOVAL & INSTALL ALL WALL & FLOOR FINISHES,LINTELS, KITCHEN APPLIANCES & CABINETS, DOORS & FRAMES TO BE DEMOLISHED & REPLACED. PROVIDE & INSTALL NEW METAL LADDER & SECURE TO EXISTING CONCRETE AREAWAY WALL, REPLACE WINDOWS & NEW ROOF.
B00527282-I1
06/25/2025
Signed off — Alteration
REPLACEMENT OF ALL FIXTURES THROUGHOUT WITHIN EXISTING ROUGHING AT FLOORS 1 THRU 4 AS PER PLANS FILED.
B00534825-I1
06/24/2025
Signed off — Alteration
REMOVE AND RECONSTRUCT BUILDING PARAPET WALL ALONG PERIMETER INCLUDING STAIR BULKHEAD WITH NEW PRECAST COPING AND SISTER EXISTING JOISTS AT AREAS OF DETERIORATION AND PROVIDE NEW OR SISTER MEMBERS AS NEEDED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00596494-I1
06/19/2025
Violation issued (HPD, closed)
C
06/14/2025
Signed off — Alteration
B00355472-I1
06/12/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00920401-I1
06/12/2025
Filed — Alteration
REPLACEMENT OF ALL FIXTURES THROUGHOUT WITHIN EXISTING ROUGHING AT FLOORS 1 THRU 4 AS PER PLANS FILED.
B00534825-P4
06/12/2025
Violation issued (HPD, closed)
A
06/05/2025
Special inspection requirement — Insulation placement and R values
Christopher Burgess
06/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
06/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
06/05/2025
Special inspection requirement — Masonry
CONNIE PISANI
06/05/2025
Special inspection requirement — Final
Christopher Burgess
06/05/2025
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
06/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
05/30/2025
Filed — Alteration
REMOVAL & INSTALL ALL WALL & FLOOR FINISHES,LINTELS, KITCHEN APPLIANCES & CABINETS, DOORS & FRAMES TO BE DEMOLISHED & REPLACED. PROVIDE & INSTALL NEW METAL LADDER & SECURE TO EXISTING CONCRETE AREAWAY WALL, REPLACE WINDOWS & NEW ROOF.
B00527282-P4
05/19/2025
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
05/19/2025
Special inspection requirement — Insulation placement and R values
Christopher Burgess
05/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
05/19/2025
Special inspection requirement — Final
Christopher Burgess
05/19/2025
Special inspection requirement — Masonry
CONNIE PISANI
05/14/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00902742-I1
03/18/2025
Signed off — Alteration
REMOVAL & INSTALL ALL WALL, FLOOR & CEILING FINISHES, KITCHEN APPLIANCES & CABINETS, DOORS & FRAMES TO BE DEMOLISHED & REPLACED AS PER PLANS FILED.
B00741200-I1
02/04/2025
Filed — Alteration
REMOVE AND RECONSTRUCT BUILDING PARAPET WALL ALONG PERIMETER INCLUDING STAIR BULKHEAD WITH NEW PRECAST COPING AND SISTER EXISTING JOISTS AT AREAS OF DETERIORATION AND PROVIDE NEW OR SISTER MEMBERS AS NEEDED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00596494-P3
02/04/2025
Permit issued — Structural
B00596494-I1-ST
02/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
02/04/2025
Special inspection requirement — Structural Cold-Formed Steel
Mehmet Gunal
02/04/2025
Special inspection requirement — Masonry
Mehmet Gunal
02/04/2025
Special inspection requirement — Structural Steel - Details
Mehmet Gunal
02/04/2025
Special inspection requirement — Final
Mehmet Gunal
02/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mehmet Gunal
02/04/2025
Special inspection requirement — Structural Steel - Welding
Mehmet Gunal
02/04/2025
Special inspection requirement — Structural Wood Frame
Mehmet Gunal
01/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
01/27/2025
Special inspection requirement — Structural Cold-Formed Steel
CONNIE PISANI
01/27/2025
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
01/27/2025
Special inspection requirement — Masonry
CONNIE PISANI
01/27/2025
Special inspection requirement — Structural Steel - Welding
CONNIE PISANI
01/27/2025
Special inspection requirement — Final
CONNIE PISANI
01/27/2025
Special inspection requirement — Structural Wood Frame
CONNIE PISANI
01/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/14/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/07/2025
Permit issued — Plumbing
B00534825-I1-PL
12/18/2024
Permit issued — Mechanical Systems
B00539309-I1-MS
12/18/2024
Permit issued — General Construction
B00741200-I1-GC
11/08/2024
Permit issued — Structural
B00527282-I1-ST
11/08/2024
Permit issued — Structural
B00527282-I1-GC
10/14/2024
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00902742-S1
09/10/2024
Filed — Alteration
REMOVAL & INSTALL ALL WALL, FLOOR & CEILING FINISHES, KITCHEN APPLIANCES & CABINETS, DOORS & FRAMES TO BE DEMOLISHED & REPLACED AS PER PLANS FILED.
B00741200-P2
09/09/2024
Filed — Alteration
REPLACEMENT OF ALL FIXTURES THROUGHOUT WITHIN EXISTING ROUGHING AT FLOORS 1 THRU 4 AS PER PLANS FILED.
B00534825-P3
09/09/2024
Filed — Alteration
REPLACE ALL EXISTING ROOF EXHAUST FANS, INSTALL NEW LOUVER AND CEILING EXHAUST FANS, INSTALL NEW RADIATOR COVERS AND REPLACE EXISTING GRILLE AS PER PLANS FILED.
B00539309-P3
09/09/2024
Filed — Alteration
REMOVE AND RECONSTRUCT BUILDING PARAPET WALL ALONG PERIMETER INCLUDING STAIR BULKHEAD WITH NEW PRECAST COPING AND SISTER EXISTING JOISTS AT AREAS OF DETERIORATION AND PROVIDE NEW OR SISTER MEMBERS AS NEEDED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00596494-P2
07/29/2024
Signed off — Alteration
B00920404-I1
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offA.M.K. Contracting02/04/2025
DOB NOWPlumbingSigned-offM & M Piping and Heating01/07/2025
DOB NOWMechanical SystemsSigned-offA.M.K. Contracting12/18/2024
DOB NOWGeneral ConstructionSigned-offA.M.K. Contracting12/18/2024
DOB NOWStructuralSigned-offA.M.K. Contracting11/08/2024
DOB NOWStructuralSigned-offA.M.K. Contracting11/08/2024
DOB NOWConstruction FenceSigned-offSkyline Restoration02/20/2024
DOB NOWStructuralSigned-offA.M.K. Contracting10/20/2023
DOB NOWGeneral ConstructionSigned-offA.M.K. Contracting10/20/2023
DOB NOWProtection and Mechanical MethodsSigned-offRennon Construction08/22/2023
DOB NOWSidewalk ShedSigned-offMNK Enterprises08/18/2023
DOB NOWConstruction FenceSigned-offSkyline Restoration08/18/2023
DOB NOWSupported ScaffoldSigned-offRennon Construction07/25/2023
DOB NOWConstruction FenceSigned-offNeelam Construction06/12/2020
BISEQISSUEDSkyworx Contracting05/03/2022
BISEQISSUEDSkyworx Contracting03/19/2021
BISEQISSUEDSkyworx Contracting02/26/2020
BISPLISSUEDRocon09/19/2019
BISEQISSUEDSkyworx Contracting03/04/2019
BISEQISSUEDSkyworx Contracting03/08/2018
BISEQISSUEDSkyworx Contracting03/07/2017
BISPLISSUEDNeptune Mechanical10/01/2012
BISPLISSUEDNeptune Mechanical03/23/2011
5 projects · most recent 10/01/2026
General Wiring
FiledStatusContractorScope
10/01/2026Permit IssuedEcny Electrical ContractorsGeneral Wiring
02/08/2023Permit IssuedThanasi ElectricalGeneral Wiring
05/13/2021Permit IssuedAmin Electrical—
12/18/2019CompleteTru-Val ElectricGeneral Wiring
01/10/2019CompleteGilston Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/14/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 108
DateRequirementInspectorRole
06/05/2025FinalChristopher Burgessprogress
06/05/2025Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
06/05/2025Structural Steel - DetailsCONNIE PISANIspecial
06/05/2025Insulation placement and R valuesChristopher Burgessenergy_progress
06/05/2025MasonryCONNIE PISANIspecial
06/05/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
06/05/2025Energy Code Compliance InspectionsChristopher Burgessprogress
05/19/2025Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
05/19/2025Insulation placement and R valuesChristopher Burgessenergy_progress
05/19/2025FinalChristopher Burgessprogress
05/19/2025Energy Code Compliance InspectionsChristopher Burgessprogress
05/19/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
05/19/2025MasonryCONNIE PISANIspecial
05/19/2025Structural Steel - DetailsCONNIE PISANIspecial
02/04/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
02/04/2025Structural Stability – Alterations of existing buildingsMehmet Gunalspecial
02/04/2025Structural Wood FrameMehmet Gunalprogress
02/04/2025FinalMehmet Gunalprogress
02/04/2025Structural Steel - DetailsMehmet Gunalspecial
02/04/2025MasonryMehmet Gunalspecial
02/04/2025Structural Cold-Formed SteelMehmet Gunalspecial
02/04/2025Structural Steel - WeldingMehmet Gunalspecial
01/27/2025Structural Steel - DetailsCONNIE PISANIspecial
01/27/2025Structural Steel - WeldingCONNIE PISANIspecial
01/27/2025FinalCONNIE PISANIprogress
Latest 25 of 108.
▾Documents — 209 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch26
09/01/2026B00569201-I1Request digital key ↗
09/01/2026B00527282-P3Request digital key ↗
09/01/2026B00527282-P4Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00355472-I1Request digital key ↗
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION8
05/07/2022340476372Open ↗
03/22/2021340476372Open ↗
02/28/2020340476372Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
09/23/2019321070504Open ↗
10/30/2018321070504Open ↗
02/24/2017340476372Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications93
▸DOB NOWProgress Inspector Seal & Signature34
09/14/2026B00539309-P1Open ↗
09/14/2026B00539309-P1Open ↗
09/14/2026B00539309-P1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/01/2026B00569201-I1Open ↗
09/01/2026B00527282-P3Open ↗
09/01/2026B00527282-P4Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/14/2026B00539309-P1Open ↗
09/01/2026B00539309-P3Open ↗
08/31/2026B00527282-P4Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
09/23/2019321070504Open ↗
10/30/2018321070504Open ↗
02/26/2013320286338Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/24/2017340476372Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/25/2011320286338Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/24/2017340476372Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/25/2011320286338Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/24/2017340476372Open ↗
▸Trade Schedules & Equipment5
▸BISRPZ/DDCV TEST REPORT : GEN215B2
10/16/2012320286338Open ↗
10/16/2012320286338Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/30/2018321070504Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
10/16/2012320286338Open ↗
▸BISSCHEDULE B - PLUMBING1
03/25/2011320286338Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES2
02/24/2017340476372Open ↗
10/30/2018321070504Open ↗
▸DOB NOWStreet Tree Checklist1
09/01/2026B00569201-I1Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00355472-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/01/2026B00527282-I1Open ↗
09/01/2026B00534825-I1Open ↗
09/01/2026B00539309-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/25/2011320286338Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/11/2019321070504Open ↗
▸Energy Compliance8
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00527282-I1Open ↗
08/13/2026B00539309-I1Open ↗
08/14/2026B00741200-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/23/2019321070504Open ↗
10/30/2018321070504Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/24/2017340476372Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/04/2021321070504Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/04/2021321070504Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/04/2021321070504Open ↗
02/24/2017340476372Open ↗
▸Approvals, Objections & Sign-offs37
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
09/01/2026B00569201-I1Open ↗
09/01/2026B00527282-P3Open ↗
09/01/2026B00527282-P4Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
09/01/2026B00534825-I1Open ↗
08/14/2026B00741200-I1Open ↗
08/13/2026B00539309-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/13/2026B00539309-P1Open ↗
08/13/2026B00539309-P3Open ↗
08/13/2026B00539309-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/18/2021321070504Open ↗
02/26/2013320286338Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/25/2011320286338Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/25/2011320286338Open ↗
▸DOB NOWDEP Variance (V5) letter1
09/01/2026B00527282-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
10/30/2018321070504Open ↗
02/26/2013320286338Open ↗
03/25/2011320286338Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/18/2021321070504Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
10/30/2018321070504Open ↗
03/25/2011320286338Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/24/2017340476372Open ↗
▸BISBOROUGH INTAKE FORM1
03/22/2021340476372Open ↗
▸Other Documents6
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B00527282-P4Open ↗
08/13/2026B00527282-I1Open ↗
08/13/2026B00527282-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROOF OF FEE EXEMPTION1
03/25/2011320286338Open ↗