← Back
Stand-alone food establishment
2218 HYLAN BOULEVARD
STATEN ISLAND · BIN 5053582
💬 Discuss this project
1986Year Built
1Stories
K5Building Class
R3-2Zoning
1,235 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Stand-alone food establishment · Owner of record: ABBQG LLC · 4,230 sf lot · 0.29 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Roof7p · 1 filing · 3 docs
Floor 119p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TCB 2218 HYLAN307/08/2026
THE OWNER OF103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZELTA DESIGN307/07/2025
ALPHA HOME DESIGN LLC108/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO203/21/2026
EPAC BUILDING CONSULTING INC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JFZ CONSTRUCTION, INCGeneral Contractor603/21/2026
LG ELITE PLUMBING INCPlumbing207/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YAN GAO6619108/27/2024
ZELTA INSPECT LLC7764103/17/2023
Building Lifecycle
All (41)Filed (4)Permit Issued (5)Violation (17)Inspection (4)Special Inspection (11)
10/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/07/2025
Filed — Alteration
PLUMBING WORKS
S00780197-P1
07/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
07/07/2025
Special inspection requirement — Maintenance information
ERIK LIEPINS
07/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
ERIK LIEPINS
07/07/2025
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
06/25/2025
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
06/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
ERIK LIEPINS
06/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
06/25/2025
Special inspection requirement — Maintenance information
ERIK LIEPINS
03/12/2025
Permit issued — General Construction
S00780196-I1-GC-CX
03/07/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
02/24/2025
Permit issued — Plumbing
S00780197-I1-PL
12/20/2024
Permit issued — Sign
S01098134-I1-SG
08/27/2024
Filed — Alteration
S01098134-I1
08/19/2024
Special inspection requirement — Post-installed Anchors
YAN GAO
08/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
YAN GAO
08/19/2024
Special inspection requirement — Final
YAN GAO
04/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/31/2024
Permit issued — Plumbing
S00780197-I1-PL
01/05/2024
Permit issued — General Construction
S00780196-I1-GC-CX
03/17/2023
Filed — Alteration
PLUMBING WORKS
S00780197-I1
03/17/2023
Filed — Alteration
S00780196-I1
03/16/2016
Violation issued (FDNY_ORDER, closed)
01/08/2013
Violation issued (FDNY_ORDER, closed)
01/08/2013
Violation issued (FDNY_ORDER, closed)
05/23/2007
Violation issued (FDNY_ORDER, closed)
03/27/2000
Violation issued (FDNY_ORDER, closed)
06/30/1997
Violation issued (ECB, closed)
Construction
06/07/1997
Violation issued (ECB, closed)
Construction
04/24/1997
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
04/24/1997
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
07/15/1996
Violation issued (ECB, closed)
Construction
05/08/1995
Violation issued (ECB, closed)
Construction
01/24/1994
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
08/12/1993
Violation issued (ECB, closed)
Construction
03/02/1993
Violation issued (ECB, closed)
Construction
09/24/1992
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
03/07/1991
Violation issued (ECB, closed)
Construction
03/07/1991
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJFZ CONSTRUCTION, INC03/12/2025
DOB NOWPlumbingPermit IssuedLG ELITE PLUMBING INC02/24/2025
DOB NOWSignPermit IssuedDESTHERS, JOSEPH12/20/2024
DOB NOWPlumbingPermit IssuedLG ELITE PLUMBING INC01/31/2024
DOB NOWGeneral ConstructionPermit IssuedJFZ CONSTRUCTION, INC01/05/2024
BISMHISSUEDFIRE VIOLATIONS SERVICE INC08/03/2007
BISPLISSUEDLESLIE KIMMEL08/03/2007
BISMHISSUEDN/A09/29/2000
BISCCISSUEDN/A10/29/1997
1 project · most recent 07/07/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/07/2025Permit IssuedLG ELITE PLUMBING INCGas, Water/Sanitary
1 project · most recent 03/18/2024
General Wiring
FiledStatusContractorScope
03/18/2024Permit IssuedR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
04/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
07/07/2025HVAC-R and service water heating equipmentERIK LIEPINSenergy_progress
07/07/2025Maintenance informationERIK LIEPINSenergy_progress
07/07/2025HVAC-R and service water heating system controlsERIK LIEPINSenergy_progress
07/07/2025Energy Code Compliance InspectionsERIK LIEPINSprogress
06/25/2025Energy Code Compliance InspectionsERIK LIEPINSprogress
06/25/2025HVAC-R and service water heating system controlsERIK LIEPINSenergy_progress
06/25/2025HVAC-R and service water heating equipmentERIK LIEPINSenergy_progress
06/25/2025Maintenance informationERIK LIEPINSenergy_progress
08/19/2024Post-installed AnchorsYAN GAOspecial
08/19/2024Structural Stability – Alterations of existing buildingsYAN GAOspecial
08/19/2024FinalYAN GAOprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026S00780196-I1Request digital key ↗
08/21/2026S01098134-I1Request digital key ↗
08/19/2026S00780197-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature7
08/27/2026S00780197-P1Open ↗
08/27/2026S00780197-P1Open ↗
08/27/2026S00780197-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026S00780196-I1Open ↗
08/19/2026S00780197-P1Open ↗
08/19/2026S00780197-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026S01098134-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026S00780196-I1Open ↗
08/19/2026S00780197-P1Open ↗
08/19/2026S00780197-I1Open ↗