← Back
Two family converted from one family
2219 RYDER STREET
BROOKLYN · Marine Park-Mill Basin-Bergen Beach · BIN 3242297
💬 Discuss this project
1930Year Built
1.75Stories
B3Building Class
R4Zoning
2,460 sfGross Floor Area
2Units
Two family converted from one family · 2,000 sf lot · 1.23 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR109/23/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281109/23/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
01/07/2026
Signed off — Alteration
installation of solar panels, rooftop, railed, grid-tied, 22 modules, 9.46 KW, SYSTEM SIZE (DC ): 9.46 KWSYSTEM SIZE (AC ): 8.36 KVA22 MODULES: HANWHA Q.TRON M-G2+ 430(MS)(SAFE HARBOR MODULE: 0)22 INVERTERS: ENPHASEIQ8HC-72-M-DOM-US
B01291679-I1
09/24/2025
Permit issued — Solar
B01291679-I1-SL
09/23/2025
Filed — Alteration
installation of solar panels, rooftop, railed, grid-tied, 22 modules, 9.46 KW, SYSTEM SIZE (DC ): 9.46 KWSYSTEM SIZE (AC ): 8.36 KVA22 MODULES: HANWHA Q.TRON M-G2+ 430(MS)(SAFE HARBOR MODULE: 0)22 INVERTERS: ENPHASEIQ8HC-72-M-DOM-US
B01291679-I1
09/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
09/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
09/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
09/23/2025
Special inspection requirement — Final
Mina Makar
09/23/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR09/24/2025
1 project · most recent 09/24/2025
FiledStatusContractorScope
09/24/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/23/2025Fire-Resistant Penetrations and JointsMina Makarspecial
09/23/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
09/23/2025Energy Code Compliance InspectionsMina Makarprogress
09/23/2025FinalMina Makarprogress
09/23/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026B01291679-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B01291679-I1Open ↗
08/24/2026B01291679-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01291679-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B01291679-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01291679-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01291679-I1Open ↗