0 Open ViolationsFDNY Report ↗
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof18p · 1 filing · 20 docs
Floor 517p · 1 filing · 20 docs
Floor 417p · 1 filing · 20 docs
Floor 317p · 1 filing · 20 docs
Floor 217p · 1 filing · 20 docs
Floor 121p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP304/09/2026
222 16TH ST203/22/2026
S U MANAGEMENT903/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S & U MANAGEMENT INCGeneral Contractor807/08/2026
BRUCHE MECHANICAL NY LLCFire Protection207/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor104/09/2026
PLBG P & H INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161608/21/2026
Building Lifecycle
All (140)Filed (21)Permit Issued (12)Signed Off (8)Violation (16)Inspection (13)Objection (40)Special Inspection (30)
08/26/2026
Signed off — New Building
New five (5) story, thirty two (32) dwelling unit building DEVELOPMENT HUB CONSULTATION ACCEPTED 4/3/2024 FOR UNIQUE SITE
B00989327-S4
08/26/2026
Signed off — New Building
New five (5) story, thirty two (32) dwelling unit building DEVELOPMENT HUB CONSULTATION ACCEPTED 4/3/2024 FOR UNIQUE SITE
B00989327-S6
08/21/2026
Filed — New Building
New five (5) story, thirty two (32) dwelling unit building DEVELOPMENT HUB CONSULTATION ACCEPTED 4/3/2024 FOR UNIQUE SITE
B00989327-A6
08/20/2026
Special inspection requirement — Metering
FAHAD FATEH
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/20/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
08/20/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
08/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/20/2026
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
08/20/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/20/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
08/20/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
08/20/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/20/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
08/20/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
08/20/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/20/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
08/20/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/20/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/14/2026
Signed off — New Building
New five (5) story, thirty two (32) dwelling unit building DEVELOPMENT HUB CONSULTATION ACCEPTED 4/3/2024 FOR UNIQUE SITE
B00989327-S3
08/05/2026
Signed off — New Building
New five (5) story, thirty two (32) dwelling unit building DEVELOPMENT HUB CONSULTATION ACCEPTED 4/3/2024 FOR UNIQUE SITE
B00989327-S5
08/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/03/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/03/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
08/03/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
08/03/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
08/03/2026
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
08/03/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/03/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/03/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/03/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
08/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
07/07/2026
Filed — New Building
New five (5) story, thirty two (32) dwelling unit building DEVELOPMENT HUB CONSULTATION ACCEPTED 4/3/2024 FOR UNIQUE SITE
B00989327-A5
06/25/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/08/2026
Objection resolved — Addressed
06/04/2026
Objection raised — Other
05/29/2026
Filed — New Building
New five (5) story, thirty two (32) dwelling unit building DEVELOPMENT HUB CONSULTATION ACCEPTED 4/3/2024 FOR UNIQUE SITE
B00989327-A3
05/08/2026
Signed off — New Building
New five (5) story, thirty two (32) dwelling unit building DEVELOPMENT HUB CONSULTATION ACCEPTED 4/3/2024 FOR UNIQUE SITE
B00989327-S2
05/05/2026
Signed off — New Building
New five (5) story, thirty two (32) dwelling unit building DEVELOPMENT HUB CONSULTATION ACCEPTED 4/3/2024 FOR UNIQUE SITE
B00989327-S1
05/04/2026
Signed off — New Building
New five (5) story, thirty two (32) dwelling unit building DEVELOPMENT HUB CONSULTATION ACCEPTED 4/3/2024 FOR UNIQUE SITE
B00989327-S7
05/04/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/30/2026
Violation issued (ECB, closed)
Unknown
04/28/2026
Violation issued (ECB, closed)
Construction
04/27/2026
Filed — New Building
New five (5) story, thirty two (32) dwelling unit building DEVELOPMENT HUB CONSULTATION ACCEPTED 4/3/2024 FOR UNIQUE SITE
B00989327-A1
04/27/2026
Filed — New Building
New five (5) story, thirty two (32) dwelling unit building DEVELOPMENT HUB CONSULTATION ACCEPTED 4/3/2024 FOR UNIQUE SITE
B00989327-A2
04/27/2026
Permit issued — Curb Cut
B00989327-S1-CC
04/21/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/21/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/13/2026
Permit issued — Mechanical Systems
B00989327-S5-MS
03/30/2026
Filed — New Building
New five (5) story, thirty two (32) dwelling unit building DEVELOPMENT HUB CONSULTATION ACCEPTED 4/3/2024 FOR UNIQUE SITE
B00989327-P9
03/23/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/09/2026
Violation issued (ECB, closed)
Construction
02/19/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSED SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01285773-I1
02/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/17/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/28/2025
Permit issued — Protection and Mechanical Methods
B01285773-I1-PMM
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offS & U MANAGEMENT INC04/27/2026
DOB NOWMechanical SystemsSigned-offS & U MANAGEMENT INC04/13/2026
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC11/28/2025
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC11/25/2025
DOB NOWStandpipeSigned-offBRUCHE MECHANICAL NY LLC11/25/2025
DOB NOWFoundationSigned-offS & U MANAGEMENT INC09/04/2025
DOB NOWPlumbingSigned-offPLBG P & H INC07/17/2025
DOB NOWSupport of ExcavationSigned-offS & U MANAGEMENT INC07/10/2025
DOB NOWGeneral ConstructionPermit IssuedS & U MANAGEMENT INC06/06/2025
DOB NOWStructuralSigned-offS & U MANAGEMENT INC04/25/2025
DOB NOWFoundationSigned-offS & U MANAGEMENT INC04/25/2025
DOB NOWGeneral ConstructionPermit IssuedS & U MANAGEMENT INC04/25/2025
1 project · most recent 08/21/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/21/2026Signed-offS & U MANAGEMENT INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric SUZ-KA36NA2 33,400 BTU · Vrf Outdoor ×58
mxz-sm48nam2-u1 50,000 BTU · Vrf Outdoor ×10
MXZ-SM36NAM2-U1 36,000 BTU · Vrf Outdoor ×2
puz-a12nka7 14,000 BTU · Vrf Outdoor ×2
Daikin RXTA36AAVJU 36,000 BTU · Vrf Outdoor ×30
RXTA48AAVJU, RXTQ48TBVJUB 50,000 BTU · Vrf Outdoor ×5
RXC12AXVJU 14,000 BTU · Vrf Outdoor ×1
Ventilation
Renewaire He1xrtv-R 750 CFM · Erv ×3
1 project · most recent 08/21/2026
Sprinkler System
FiledStatusContractorScope
08/21/2026Signed-offPLBG P & H INCSprinkler System
1 project · most recent 08/21/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/21/2026Signed-offBRUCHE MECHANICAL NY LLCGas, Storm, Water/Sanitary
2 projects · most recent 06/16/2026
General Wiring
FiledStatusContractorScope
06/16/2026Pending PaymentPOWER DIRECT ELECTRIC INCGeneral Wiring
06/08/2026Permit IssuedPOWER DIRECT ELECTRIC INC—
1 project · most recent 08/21/2026
FiledStatusContractorScope
08/21/2026Signed-offS & U MANAGEMENT INC2 scope_items
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
06/25/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/04/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
04/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/21/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/23/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/17/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/24/2025Fail-Final CND-Occupancy InspectionFailView ↗
08/13/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/20/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
08/20/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/20/2026Fenestration areasFAHAD FATEHenergy_progress
08/20/2026Interior lighting powerFAHAD FATEHenergy_progress
08/20/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
08/20/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/20/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/20/2026MeteringFAHAD FATEHenergy_progress
08/20/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
08/20/2026Air barrier — testing FAHAD FATEHenergy_progress
08/20/2026Electrical motors and elevatorsFAHAD FATEHenergy_progress
08/20/2026Exterior lighting powerFAHAD FATEHenergy_progress
08/20/2026Lighting controlsFAHAD FATEHenergy_progress
08/20/2026Fenestration air leakageFAHAD FATEHenergy_progress
08/20/2026Maintenance informationFAHAD FATEHenergy_progress
08/20/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
08/20/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/03/2026Electrical motors and elevatorsFAHAD FATEHenergy_progress
08/03/2026Lighting controlsFAHAD FATEHenergy_progress
08/03/2026Maintenance informationFAHAD FATEHenergy_progress
08/03/2026Interior lighting powerFAHAD FATEHenergy_progress
08/03/2026Fenestration areasFAHAD FATEHenergy_progress
08/03/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
08/03/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
08/03/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
Latest 25 of 150.
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/24/2026B00989327-A6Request digital key ↗
08/20/2026B01285773-I1Request digital key ↗
08/17/2026B00989327-A5Request digital key ↗
Showing 3 of 21 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram4
08/24/2026B00989327-A6Open ↗
08/17/2026B00989327-A5Open ↗
08/17/2026B00989327-P9Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/24/2026B00989327-A6Open ↗
08/17/2026B00989327-A5Open ↗
▸Seals & Professional Certifications63
▸DOB NOWSpecial Inspector Seal & Signature22
09/23/2026B00989327-A6Open ↗
09/23/2026B00989327-A6Open ↗
09/01/2026B00989327-P7Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/24/2026B00989327-A6Open ↗
08/20/2026B01285773-I1Open ↗
08/17/2026B00989327-A5Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/23/2026B00989327-A6Open ↗
09/23/2026B00989327-A6Open ↗
09/01/2026B00989327-P7Open ↗
Showing 3 of 20 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/24/2026B00989327-A6Open ↗
08/17/2026B00989327-A5Open ↗
▸DOB NOWStreet Tree Sign Off1
08/17/2026B00989327-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/17/2026B00989327-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/15/2026B00989327-S5Open ↗
08/15/2026B00989327-S4Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026B00989327-S7Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/17/2026B00989327-S3Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification7
08/24/2026B00989327-A6Open ↗
08/17/2026B00989327-P7Open ↗
08/17/2026B00989327-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/24/2026B00989327-A6Open ↗
08/17/2026B00989327-A5Open ↗
▸DOB NOWSite Survey: Initial2
08/24/2026B00989327-A6Open ↗
08/17/2026B00989327-A5Open ↗
▸DOB NOWFinal Survey1
08/17/2026B00989327-I1Open ↗