← Back
Elevator apt, luxury type
The Anthem
222 EAST 34 STREET · Murray Hill-Kips Bay · BIN 1088117
💬 Discuss this project
2002Year Built
21Stories
D8Building Class
C1-9AZoning
541,505 sfGross Floor Area
487Units
LL97 CoveredRent Stabilized14 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, luxury type · Owner of record: ROSEBUD OWNER LLC · 35,396 sf lot · 15.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
BulkheadUnder Construction1p · 1 filing · 5 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Under Construction21p · 8 filings · 15 docs
Cellar1 filing · 14 docs
Site & exteriorUnder Construction5 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROSEBUD ASSOCIATES7303/21/2026
ANTHEM6309/13/2026
EL-KAM REALTY803/21/2026
ANTHEM LLC FOR ROSEBUD OWNER603/21/2026
ROSBUD ASSOCIATES603/21/2026
SPRING SCAFFOLDING LLC503/22/2026
EOC-NY407/08/2026
ROSEBUD OWNER, LLC303/22/2026
PHOENIX203/21/2026
ACE GROUP NY107/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS103/21/2026
MMSR CONSULTING GROUP LLC803/21/2026
ART OF FORM ARCHITECTS403/21/2026
RPO203/21/2026
A1 EXPEDITING SERVICE CORP.603/21/2026
INDESIGN STUDIO203/21/2026
BUILDING BROTHERS403/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANNEX ENTERPRISE, INCGeneral Contractor407/30/2026
SPRING SCAFFOLDING LLCGeneral Contractor303/21/2026
PRECISION BUILDING & CONSGeneral Contractor303/21/2026
ARSENAL SCAFFOLD INCGeneral Contractor307/08/2026
CLEAR CHANNEL OUTDOORScaffold207/08/2026
GLRGeneral Contractor208/01/2026
JT MAGEN & COMPANY INCGeneral Contractor203/21/2026
TNK CONSTRUCTION LLCGeneral Contractor207/08/2026
ONOFRIO LODUCA PLBG CORPPlumbing107/08/2026
CITY SIGNSScaffold107/08/2026
JAMES ZERVASElectrical103/21/2026
DUNWELL ELEVATOR ELECElectrical103/22/2026
CLEAR CHANNEL ELECTL SVCSElectrical103/22/2026
A&A PLUMBING CORPPlumbing107/08/2026
MSB PLUMBING CONTRACTORSPlumbing107/08/2026
ACE GROUP NY CORPGeneral Contractor107/08/2026
K.M.D MECHANICAL 1443 LLCFire Protection107/08/2026
OKTAY AKKASElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SONI ENGINEERING CONSULTI9819108/13/2026
SHAHRISH SHUVO ENGINEERIN8524306/16/2026
EOC-NY6548506/03/2026
HRF SERVICES CORP5616206/03/2026
SIA INSPECTIONS LLC7306108/26/2024
AA BUILDING & INSPECTION1519212/14/2023
MILROSE CONSULTANTS LLC2003209/09/2022
Building Lifecycle
All (162)Filed (21)Permit Issued (20)Signed Off (13)Facade (FISP) (9)Violation (60)Inspection (7)Objection (2)Special Inspection (30)
08/24/2026
Permit issued — Suspended Scaffold
M01444854-I1-SC
08/13/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
M01444854-I1
08/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/12/2026
Special inspection requirement — Post-installed Anchors
nayan soni
08/12/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
07/31/2026
Permit issued — General Construction
M01407177-I1-GC
07/31/2026
Permit issued — Mechanical Systems
M01407177-S1-MS
07/29/2026
Permit issued — General Construction
M01409553-I1-GC
06/16/2026
Filed — Alteration
CVS Retail Space - Minor General Interior renovation as per plans. Minor Plumbing and Mechanical work to be filing subsequently. No Change to use, egress or occupancy.
M01407177-S1
06/16/2026
Filed — Alteration
CVS Retail Space - Minor General Interior renovation as per plans. Minor Plumbing and Mechanical work to be filing subsequently. No Change to use, egress or occupancy.
M01407177-S2
06/15/2026
Filed — Alteration
CVS Retail Space - Minor General Interior renovation as per plans. Minor Plumbing and Mechanical work to be filing subsequently. No Change to use, egress or occupancy.
M01407177-I1
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
Shahrish Shuvo
06/15/2026
Special inspection requirement — Lighting controls
Shahrish Shuvo
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
Shahrish Shuvo
06/15/2026
Special inspection requirement — Interior lighting power
Shahrish Shuvo
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
Shahrish Shuvo
06/09/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01413779-I1
06/09/2026
Permit issued — Sidewalk Shed
M01413779-I1-SH
06/08/2026
Special inspection requirement — Final
Shahrish Shuvo
06/08/2026
Special inspection requirement — Mechanical Systems
Shahrish Shuvo
06/03/2026
Filed — Alteration
FACADE RESTORATION AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01409553-I1
05/29/2026
Special inspection requirement — Final
David Merabyan
05/29/2026
Special inspection requirement — Masonry
David Merabyan
05/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
05/29/2026
Special inspection requirement — Post-installed Anchors
David Merabyan
05/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
05/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
05/26/2026
Special inspection requirement — Final
Shahrish Shuvo
05/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
03/24/2025
Violation issued (HPD, closed)
B
03/11/2025
Signed off — Alteration
INTERIOR LOBBY RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01094090-I1
02/05/2025
Special inspection requirement — Final
David Merabyan
02/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
JEFF AKERMAN
02/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
02/05/2025
Special inspection requirement — Post-installed Anchors
David Merabyan
02/04/2025
Filed — Alteration
INTERIOR LOBBY RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01094090-P1
12/11/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM INSIDE THE LOBBY AT 222 EAST 34TH STREET BUILDING.
M01100633-I1
10/07/2024
Permit issued — General Construction
M01094090-I1-GC
08/28/2024
Filed — Alteration
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM INSIDE THE LOBBY AT 222 EAST 34TH STREET BUILDING.
M01100633-I1
08/28/2024
Permit issued — Protection and Mechanical Methods
M01100633-I1-PMM
08/26/2024
Filed — Alteration
INTERIOR LOBBY RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01094090-I1
08/02/2024
Signed off — Alteration
PARKING GARAGE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M00944448-I1
06/27/2024
Signed off — Alteration
plumbing related work for alteration project.
M00910586-S2
06/24/2024
Signed off — Alteration
plumbing related work for alteration project.
M00910586-I1
06/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/20/2024
Permit issued — Plumbing
M00910586-S2-PL
12/14/2023
Filed — Alteration
plumbing related work for alteration project.
M00910586-S2
11/27/2023
Permit issued — General Construction
M00944448-I1-GC
11/14/2023
Filed — Alteration
PARKING GARAGE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M00944448-P1
11/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
11/14/2023
Special inspection requirement — Final
David Merabyan
11/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
11/13/2023
Special inspection requirement — Final
David Merabyan
11/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
11/13/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
10/30/2023
Permit issued — General Construction
M00910586-I1-GC
10/30/2023
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
10/19/2023
Filed — Alteration
PARKING GARAGE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M00944448-I1
08/24/2023
Filed — Alteration
plumbing related work for alteration project.
M00910586-I1
Latest 60 of 162 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedANNEX ENTERPRISE INC08/24/2026
DOB NOWGeneral ConstructionPermit IssuedGLR INC07/31/2026
DOB NOWMechanical SystemsPermit IssuedGLR INC07/31/2026
DOB NOWGeneral ConstructionPermit IssuedANNEX ENTERPRISE, INC07/29/2026
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP06/09/2026
DOB NOWGeneral ConstructionSigned-offJT MAGEN & COMPANY INC10/07/2024
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC08/28/2024
DOB NOWPlumbingSigned-offA&A PLUMBING CORP05/20/2024
DOB NOWGeneral ConstructionSigned-offANNEX ENTERPRISE, INC11/27/2023
DOB NOWGeneral ConstructionSigned-offPRECISION BUILDING & CONS10/30/2023
DOB NOWSignSigned-offELMER DAWSON03/21/2023
DOB NOWSprinklersSigned-offK.M.D MECHANICAL 1443 LLC12/20/2022
DOB NOWPlumbingSigned-offMSB PLUMBING CONTRACTORS12/16/2022
DOB NOWGeneral ConstructionSigned-offTNK CONSTRUCTION LLC11/15/2022
DOB NOWMechanical SystemsSigned-offTNK CONSTRUCTION LLC11/11/2022
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/24/2021
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC10/28/2020
DOB NOWPlumbingSigned-offONOFRIO LODUCA PLBG CORP11/04/2019
DOB NOWSignSigned-offSTEPHEN GOITZ07/08/2019
DOB NOWSignSigned-offSTEPHEN GOITZ07/08/2019
BISSPISSUEDRRP PLUMBING CORP05/05/2022
BISOTISSUEDATLAS CONSTRUCTION OF NY12/03/2020
BIS—ISSUEDNATIONAL MAINTENANCE, INC05/30/2017
BIS—ISSUEDNATIONAL MAINTENANCE, INC05/30/2017
BIS—ISSUEDNATIONAL MAINTENANCE, INC05/30/2017
BISSPISSUEDACCURATE MECHANICAL INC05/16/2017
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM01/12/2017
BISPLISSUEDPIPE RITE CORP01/09/2017
BISMHISSUEDDIMENSIONAL INC12/28/2016
BISMHISSUEDSMD CONSTRUCTION GROUP IN09/08/2016
BIS—ISSUEDTEDCO GROUP INC06/23/2016
BIS—ISSUEDCITY SIGNS INC06/09/2016
BISSPISSUEDACCURATE MECHANICAL INC03/03/2016
BISOTISSUEDSMD CONSTRUCTION GROUP IN02/19/2016
BISSPISSUEDALKLEM PLUMBING INC.10/19/2015
BISBLISSUEDALKLEM PLUMBING INC07/01/2015
BISPLISSUEDALKLEM PLUMBING INC07/01/2015
BISEQISSUEDPHOENIX SUTT. STREET INC04/09/2015
BISOTISSUEDMOUNT BLANC RESTORATION04/01/2015
BIS—ISSUEDDONG & TANG INC09/12/2014
+ 30 more permits on file
1 project · most recent 06/16/2026
Water/Sanitary
FiledStatusContractorScope
06/16/2026——Water/Sanitary
13 projects · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026CompleteCOPPER-CITY ELECTRIC CORP—
06/08/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
10/04/2024CompleteD&D ELECTL CONST CO INCGeneral Wiring
10/31/2023CompleteTWINTECH ELECTRIC INCGeneral Wiring
09/01/2023CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
06/13/2023CompleteROBERT CHIMENTI11 meters, 1 new_meters
10/13/2020CompleteNASH ELECTRIC SERVICES IN—
12/26/2019CompleteDUNWELL ELEVATOR ELEC—
12/26/2019CompleteDUNWELL ELEVATOR ELEC—
09/18/2019CompleteCLEAR CHANNEL ELECTL SVCS—
09/18/2019CompleteCLEAR CHANNEL ELECTL SVCS—
06/18/2018CompleteASSOCIATED ELEC CONT OF N7 meters
03/26/2018CompleteNATIONAL MAINT. INC—
1 project · most recent 06/09/2026
Sidewalk Shed
FiledStatusContractorScope
06/09/2026Permit IssuedACE GROUP NY CORPSidewalk Shed
1 project · most recent 08/13/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/13/2026Permit IssuedANNEX ENTERPRISE INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/24/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/22/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
08/12/2026Post-installed Anchorsnayan sonispecial
08/12/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
06/15/2026Tenant Protection Plan ComplianceShahrish Shuvospecial
06/15/2026Lighting controlsShahrish Shuvoenergy_progress
06/15/2026Tenant Protection Plan ComplianceShahrish Shuvospecial
06/15/2026Interior lighting powerShahrish Shuvoenergy_progress
06/15/2026Tenant Protection Plan ComplianceShahrish Shuvospecial
06/08/2026FinalShahrish Shuvoprogress
06/08/2026Mechanical SystemsShahrish Shuvospecial
05/29/2026FinalDavid Merabyanprogress
05/29/2026MasonryDavid Merabyanspecial
05/29/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
05/29/2026Post-installed AnchorsDavid Merabyanspecial
05/29/2026Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
05/26/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
05/26/2026FinalShahrish Shuvoprogress
05/26/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
02/05/2025FinalDavid Merabyanprogress
02/05/2025Tenant Protection Plan ComplianceJEFF AKERMANspecial
02/05/2025Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
02/05/2025Post-installed AnchorsDavid Merabyanspecial
11/14/2023Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
11/14/2023FinalDavid Merabyanprogress
11/14/2023Tenant Protection Plan ComplianceFAHAD FATEHspecial
11/13/2023FinalDavid Merabyanprogress
Latest 25 of 36.
▾Documents — 846 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch16
09/01/2026M00789956-I1Request digital key ↗
09/01/2026M00789699-I1Request digital key ↗
08/31/2026M00841750-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Sign2
09/05/2026M00168587-I1Request digital key ↗
09/05/2026M00168586-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00190990-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00411044-I1Request digital key ↗
▸Applications & Permits149
▸BISPLAN / WORK APPROVAL APPLICATION84
12/12/2025121997143Open ↗
07/03/2024122689411Open ↗
02/14/2024122689411Open ↗
Showing 3 of 84 on file for this type
▸BISWORK PERMIT APPLICATION61
05/06/2022122032406Open ↗
12/03/2020140952761Open ↗
09/30/2019123753330Open ↗
Showing 3 of 61 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWState DEC Permit1
08/13/2026M00190990-I1Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZRD1-Zoning Resolution Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
03/08/2022121997143Open ↗
▸Seals & Professional Certifications200
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION87
03/20/2020123753330Open ↗
03/20/2020123753330Open ↗
04/16/2019123084143Open ↗
Showing 3 of 87 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST26
05/31/2017123084152Open ↗
05/31/2017123084143Open ↗
05/31/2017123084134Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/04/2026M00411044-I1Open ↗
09/01/2026M00789699-I1Open ↗
08/31/2026M00841750-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/17/2026M01407177-S2Open ↗
09/01/2026M01407177-S1Open ↗
08/28/2026M00910586-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
09/23/2020140952761Open ↗
05/31/2017123084152Open ↗
05/31/2017123084143Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026M00168587-I1Open ↗
09/01/2026M01407177-S1Open ↗
08/28/2026M00910586-I1Open ↗
Showing 3 of 11 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/23/2020140952761Open ↗
01/11/2017140593560Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/23/2020140952761Open ↗
01/11/2017140593560Open ↗
Showing 2 of 4 on file for this type
▸Trade Schedules & Equipment60
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISEQUIPMENT USE PERMITS12
11/21/2017122915373Open ↗
04/20/2017122657286Open ↗
Showing 2 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
11/21/2017122915373Open ↗
04/20/2017122657286Open ↗
Showing 2 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSIGN HANGER CERTIFICATE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
05/31/2022121997143Open ↗
08/22/2017121551409Open ↗
Showing 2 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/29/2022121997143Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection12
▸BISSTREET TREE CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES4
08/13/2024122689411Open ↗
09/23/2020140952761Open ↗
08/07/2019123753330Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00190990-I1Open ↗
08/13/2026M00411044-I1Open ↗
▸Environmental & Asbestos55
▸DOB NOWOER: Notice to Proceed12
08/13/2026M01094090-I1Open ↗
08/13/2026M00411044-I1Open ↗
08/13/2026M00168587-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWOER: Notice of Satisfaction10
08/13/2026M00411044-I1Open ↗
08/13/2026M00168586-I1Open ↗
08/13/2026M00168587-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
08/07/2019123753330Open ↗
Showing 1 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED5
09/23/2020140952761Open ↗
01/11/2017140593560Open ↗
Showing 2 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
08/21/2024122689411Open ↗
10/20/2023122343071Open ↗
07/30/2021140952761Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00190990-I1Open ↗
▸Energy Compliance55
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS28
03/20/2020123753330Open ↗
11/29/2017122915373Open ↗
05/09/2017122032406Open ↗
Showing 3 of 28 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
03/20/2020123753330Open ↗
11/29/2017122915373Open ↗
08/15/2017122657286Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
08/06/2021140952761Open ↗
08/06/2021140952761Open ↗
07/30/2021140952761Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/23/2020140952761Open ↗
Showing 1 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
01/11/2017140593560Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00789956-I1Open ↗
08/13/2026M00789940-I1Open ↗
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
08/06/2021140952761Open ↗
08/06/2021140952761Open ↗
07/30/2021140952761Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs97
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST53
11/02/2023122343071Open ↗
05/11/2022122032406Open ↗
08/06/2021140952761Open ↗
Showing 3 of 53 on file for this type
▸BISADMINISTRATIVE OBJECTIONS23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
03/20/2020123753330Open ↗
08/15/2017121997143Open ↗
07/28/2017122657286Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
01/19/2023121997143Open ↗
Showing 1 of 9 on file for this type
▸Cost, Insurance & Ownership75
▸BISCOST AFFIDAVIT73
09/23/2020140952761Open ↗
03/09/2020123753330Open ↗
08/07/2019123753330Open ↗
Showing 3 of 73 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
08/01/2024122689411Open ↗
07/30/2021140952761Open ↗
▸Filing & Intake Forms79
▸BISEFILING COVER SHEET35
08/07/2019123753330Open ↗
05/31/2017123084152Open ↗
05/31/2017123084143Open ↗
Showing 3 of 35 on file for this type
▸BISADDITIONAL INFORMATION22
06/06/2023121997143Open ↗
06/06/2023121997143Open ↗
06/06/2023121997143Open ↗
Showing 3 of 22 on file for this type
▸BISBOROUGH INTAKE FORM16
05/06/2022122032406Open ↗
02/04/2022122032406Open ↗
03/20/2020123753330Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
09/23/2020140952761Open ↗
01/11/2017140593560Open ↗
Showing 2 of 6 on file for this type
▸Other Documents19
▸DOB NOWDHCR Document8
08/13/2026M00944448-I1Open ↗
08/13/2026M00944448-P1Open ↗
08/13/2026M00789940-I1Open ↗
Showing 3 of 8 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
01/23/2024121086314Open ↗
01/23/2024121086314Open ↗
Showing 2 of 3 on file for this type
▸BISDHCR DOCUMENT2
08/14/2024122689411Open ↗
10/30/2023122343071Open ↗
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDRY PIPE VALVE TEST : FP-101
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/16/2026M01444854-I1Open ↗
▸DOB NOWCalculations1
08/16/2026M01444854-I1Open ↗