← Back
Elevator apt, fireproof without stores
222 EAST 56 STREET
MANHATTAN · East Midtown-Turtle Bay · BIN 1038587
💬 Discuss this project
1910Year Built
5Stories
D3Building Class
C6-6Zoning
30,635 sfGross Floor Area
58Units
LL97 CoveredRent Stabilized4 Open Violations ▸
Elevator apt, fireproof without stores · Owner of record: MIDTOWN EAST 56 LLC · 7,532 sf lot · 4.07 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Floor 59p · 1 filing · 6 docs
Floor 412p · 1 filing · 20 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MIDTOWN EAST 563007/08/2026
HUGUEL1103/21/2026
HUGEUL CORP C O DEMER MANAGEMENT203/21/2026
KAHEN PROPERTIES LLC103/22/2026
LALEZARIAN DEVELOPERS INC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/06/2018$25.0M—Private party → MIDTOWN EAST 56 LLC$816/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUSTAINABLE DESIGN ENGINEERING PLLC412/21/2023
BILLAH ENGINEERING PLLC208/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YOUBER DESIGN1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FACADE IMPROVEMENT INCGeneral Contractor303/21/2026
MK IMPROVEMENT GROUP INCGeneral Contractor303/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing207/08/2026
ANTHONY COSTANZOElectrical103/21/2026
JOHN H. MOOREElectrical103/22/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUSTAINABLE DESIGN ENGINE1404212/21/2023
JAY KAVI CORPORATION8500206/29/2023
BILLAH ENGINEERING5838108/17/2021
Building Lifecycle
All (74)Filed (6)Permit Issued (5)Signed Off (2)Violation (39)Inspection (5)Objection (6)Special Inspection (11)
07/13/2026
Violation issued (HPD, closed)
C
07/02/2025
Violation issued (HPD, open)
C
10/19/2024
Violation issued (HPD, open)
C
05/23/2024
Violation issued (HPD, closed)
B
05/23/2024
Violation issued (HPD, open)
C
05/23/2024
Violation issued (HPD, closed)
B
05/23/2024
Violation issued (HPD, closed)
A
05/23/2024
Violation issued (HPD, closed)
B
05/23/2024
Violation issued (HPD, closed)
B
05/23/2024
Violation issued (HPD, open)
C
05/23/2024
Violation issued (HPD, closed)
C
05/23/2024
Violation issued (HPD, closed)
A
05/23/2024
Violation issued (HPD, closed)
B
05/23/2024
Violation issued (HPD, closed)
B
04/24/2024
Violation issued (HPD, closed)
C
04/15/2024
Signed off — Alteration
GENERAL CONSTRUCTION TO COMBINE APT 5C & 5D ON THE 4TH FL (RENAME TO 5M). WORK MUST COMPLY WITH TPPN 03/97, NEW PARTITIONS & FINISHES, DEMO OF NON-LOAD-BEARING PARTITIONS, & NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING
M00874590-I1
04/15/2024
Signed off — Alteration
GENERAL CONSTRUCTION TO COMBINE APT 5C & 5D ON THE 4TH FL (RENAME TO 5M). WORK MUST COMPLY WITH TPPN 03/97, NEW PARTITIONS & FINISHES, DEMO OF NON-LOAD-BEARING PARTITIONS, & NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING
M00874590-S1
03/12/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/10/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jay Kavi
01/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kenny Mak
01/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Kenny Mak
01/04/2024
Special inspection requirement — Final
Shamsul Siddique
01/04/2024
Special inspection requirement — Lighting in dwelling units
Kenny Mak
12/21/2023
Filed — Alteration
GENERAL CONSTRUCTION TO COMBINE APT 5C & 5D ON THE 4TH FL (RENAME TO 5M). WORK MUST COMPLY WITH TPPN 03/97, NEW PARTITIONS & FINISHES, DEMO OF NON-LOAD-BEARING PARTITIONS, & NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING
M00874590-P2
12/21/2023
Filed — Alteration
GENERAL CONSTRUCTION TO COMBINE APT 5C & 5D ON THE 4TH FL (RENAME TO 5M). WORK MUST COMPLY WITH TPPN 03/97, NEW PARTITIONS & FINISHES, DEMO OF NON-LOAD-BEARING PARTITIONS, & NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING
M00874590-P1
12/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
12/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kenny Mak
12/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
12/18/2023
Special inspection requirement — Energy Code Compliance Inspections
Kenny Mak
12/18/2023
Special inspection requirement — Final
Shamsul Siddique
12/18/2023
Special inspection requirement — Lighting in dwelling units
Kenny Mak
12/06/2023
Permit issued — Plumbing
M00874590-S1-PL
11/14/2023
Permit issued — Plumbing
M00874590-S1-PL
10/27/2023
Permit issued — General Construction
M00874590-I1-GC
07/12/2023
Objection raised — Scope
07/12/2023
Objection resolved — Addressed
07/07/2023
Objection raised — Scope
07/07/2023
Objection resolved — Addressed
07/07/2023
Objection raised — Scope
07/07/2023
Objection resolved — Addressed
06/29/2023
Filed — Alteration
GENERAL CONSTRUCTION TO COMBINE APT 5C & 5D ON THE 4TH FL (RENAME TO 5M). WORK MUST COMPLY WITH TPPN 03/97, NEW PARTITIONS & FINISHES, DEMO OF NON-LOAD-BEARING PARTITIONS, & NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING
M00874590-S1
06/28/2023
Filed — Alteration
GENERAL CONSTRUCTION TO COMBINE APT 5C & 5D ON THE 4TH FL (RENAME TO 5M). WORK MUST COMPLY WITH TPPN 03/97, NEW PARTITIONS & FINISHES, DEMO OF NON-LOAD-BEARING PARTITIONS, & NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING
M00874590-I1
08/29/2022
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
06/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2022
Violation issued (HPD, closed)
A
12/02/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/10/2021
Permit issued — Plumbing
M00563180-S1-PL
10/25/2021
Permit issued — General Construction
M00563180-I1-GC
08/20/2021
Filed — Alteration
REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (2 LAV, 2 TUB, 2 WC), RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK), CAP AND REMOVE (1 SINK, 1 GAS STOVE), AND INSTALL NEW PLUMBING FIXTURES (1 DW) AT APT 6M ON THE 5TH FLOOR.
M00563180-S1
08/17/2021
Filed — Alteration
REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (2 LAV, 2 TUB, 2 WC), RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK), CAP AND REMOVE (1 SINK, 1 GAS STOVE), AND INSTALL NEW PLUMBING FIXTURES (1 DW) AT APT 6M ON THE 5TH FLOOR.
M00563180-I1
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/09/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/25/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/31/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/03/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/18/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/02/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/28/2011
Violation issued (ECB, closed)
Unknown
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC12/06/2023
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC11/14/2023
DOB NOWGeneral ConstructionSigned-offFACADE IMPROVEMENT INC10/27/2023
DOB NOWPlumbingPermit IssuedT & T PLUMBING INC11/10/2021
DOB NOWGeneral ConstructionPermit IssuedMK IMPROVEMENT GROUP INC10/25/2021
BISOTISSUEDFACADE IMPROVEMENT INC05/07/2019
BISOTISSUEDMK IMPROVEMENT GROUP INC12/06/2018
BISOTISSUEDMK IMPROVEMENT GROUP INC12/06/2018
BISPLISSUEDAURA PLUMBING INC12/05/2017
BISPLISSUEDBUDGET PLBG & HTG LLC02/15/2017
BISMHISSUEDSQUAN CONSTRUCTION SERVIC10/26/2016
BISPLISSUEDAUSTIN PLBG & HTG CO.INC03/02/2016
BISMHISSUEDSQUAN CONSTRUCTION SERVIC02/05/2016
BISMHISSUEDSQUAN CONSTRUCTION SERVIC09/02/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC07/02/2015
BISOTISSUEDAXIS INTERIOR DESIGN CORP09/12/2012
BISOTISSUEDJACK PICCINNI INC06/13/2012
BISOTISSUEDAXIS INTERIOR DESIGN CORP01/25/2012
BISEQISSUEDPIONEER GENERAL CONSTRUCT04/16/2009
BISEQISSUEDSPRINGSCAFF.07/17/2001
1 project · most recent 08/20/2021
Gas Water/Sanitary
FiledStatusContractorScope
08/20/2021Permit IssuedPIPESTYLISTS, INCGas, Water/Sanitary
2 projects · most recent 08/24/2021
General Wiring
FiledStatusContractorScope
08/24/2021Permit IssuedJOHN H. MOOREGeneral Wiring
08/16/2019Permit IssuedJOHN H. MOOREGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/10/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/02/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
01/04/2024Tenant Protection Plan ComplianceJay Kavispecial
01/04/2024Fire-Resistant Penetrations and JointsKenny Makspecial
01/04/2024Energy Code Compliance InspectionsKenny Makprogress
01/04/2024FinalShamsul Siddiqueprogress
01/04/2024Lighting in dwelling unitsKenny Makenergy_progress
12/18/2023Tenant Protection Plan Compliance—special
12/18/2023Fire-Resistant Penetrations and JointsKenny Makspecial
12/18/2023Tenant Protection Plan Compliance—special
12/18/2023Energy Code Compliance InspectionsKenny Makprogress
12/18/2023FinalShamsul Siddiqueprogress
12/18/2023Lighting in dwelling unitsKenny Makenergy_progress
▾Documents — 148 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026M00563180-S1Request digital key ↗
09/03/2026M00563180-I1Request digital key ↗
08/28/2026M00874590-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits27
▸BISWORK PERMIT APPLICATION15
05/08/2019123763542Open ↗
12/07/2018123493790Open ↗
12/07/2018123493781Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
07/29/2020140928628Open ↗
01/28/2020122405343Open ↗
05/08/2019123763542Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications41
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
02/21/2020122405343Open ↗
01/28/2020122405343Open ↗
05/08/2019123763542Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
05/08/2019123763542Open ↗
10/24/2018123493790Open ↗
10/24/2018123493781Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026M00563180-I1Open ↗
09/03/2026M00563180-S1Open ↗
08/28/2026M00874590-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/27/2026M00874590-I1Open ↗
09/27/2026M00874590-I1Open ↗
09/27/2026M00874590-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
06/15/2012121105008Open ↗
11/18/2011120876383Open ↗
04/13/2009120011245Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/08/2019123763542Open ↗
10/24/2018123493790Open ↗
10/24/2018123493781Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/27/2026M00874590-I1Open ↗
09/27/2026M00874590-I1Open ↗
08/25/2026M00874590-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/29/2020140928628Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/29/2020140928628Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
05/08/2019123763542Open ↗
10/24/2018123493790Open ↗
10/24/2018123493781Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/15/2012121105008Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes4
05/08/2019123763542Open ↗
10/24/2018123493790Open ↗
10/24/2018123493781Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
07/29/2020140928628Open ↗
05/08/2019123763542Open ↗
10/24/2018123493790Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/03/2026M00563180-I1Open ↗
09/03/2026M00563180-S1Open ↗
08/15/2026M00874590-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
11/18/2011120876383Open ↗
04/13/2009120011245Open ↗
04/13/2009120011245Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
02/21/2020122405343Open ↗
01/28/2020122405343Open ↗
05/08/2019123763542Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
02/21/2020122405343Open ↗
01/13/2016122400874Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/29/2020140928628Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/04/2020140928628Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/29/2020140928628Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
02/21/2020122405343Open ↗
06/13/2016120876383Open ↗
01/13/2016122400874Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
06/15/2012121105008Open ↗
11/18/2011120876383Open ↗
04/13/2009120011245Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/06/2017122405343Open ↗
02/23/2017122405343Open ↗
06/27/2013121105008Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT12
07/29/2020140928628Open ↗
02/21/2020122405343Open ↗
05/08/2019123763542Open ↗
Showing 3 of 12 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
05/08/2019123763542Open ↗
12/07/2018123493790Open ↗
12/07/2018123493781Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET6
05/08/2019123763542Open ↗
10/24/2018123493790Open ↗
10/24/2018123493781Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
02/21/2020122405343Open ↗
01/28/2020122405343Open ↗
▸BISADDITIONAL INFORMATION1
08/04/2020140928628Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/29/2020140928628Open ↗