222 LENOX AVENUE
MANHATTAN · Harlem (South) · BIN 1053349
💬 Discuss this project
1888Year Built
5Stories
M1Building Class
R7-2Zoning
4,800 sfGross Floor Area
1Units
16 Open Violations 15 unresolved · 1 paperwork only ▸
Church, synagogue, chapel · Owner of record: 206 LENOX LLC · 1,600 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction56p · 1 filing · 20 docs
Floor 4Under Construction51p · 1 filing · 20 docs
Floor 3Under Construction49p · 1 filing · 20 docs
Floor 2Under Construction50p · 1 filing · 20 docs
Floor 1Under Construction51p · 1 filing · 20 docs
CellarUnder Construction58p · 1 filing · 20 docs
Sub-BasementUnder Construction47p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES509/13/2026
NYC HOUSING PRESERVATION AND DEVELOPMENT103/22/2026
HOUSING PRESERVATION & DE103/22/2026
OWNER OF 222 LENEX AVE103/22/2026
CITY OF NEW YORK DAMP/TIL203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB308/11/2026
EMTG CONSULTANTS INC1007/28/2026
GILSANZ MURRAY STEFICEK LLP204/21/2026
ROMINES ARCHITECTURE PLLC303/04/2026
MCLAREN ENGINEERING GROUP106/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor207/08/2026
SUMMIT JV LLCGeneral Contractor204/09/2026
TOUCHSTONE RENOVATIONS LLGeneral Contractor207/08/2026
L.L.G. PLBG & HTG INCPlumbing206/28/2026
CASINO PLMBG & HTG CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KCE CONSULTING ENGINEERIN37121407/28/2026
Building Lifecycle
All (97)Filed (19)Permit Issued (9)Violation (33)Objection (6)Special Inspection (30)
08/26/2026
Objection resolved — Resolved
08/20/2026
Objection raised — Admin
08/11/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01416837-P1
07/28/2026
Filed — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY BUILDING: INSTALL A NEW AUTOMATIC WET SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00726001-P9
07/01/2026
Special inspection requirement — Post-installed Anchors
Kemba Walcott
07/01/2026
Special inspection requirement — Sprinkler Systems
Kemba Walcott
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kemba Walcott
06/18/2026
Permit issued — Plumbing
M00726001-S1-PL
06/17/2026
Permit issued — Sprinklers
M00726001-S4-EW-SP
06/17/2026
Permit issued — Boiler Equipment
M00726001-S5-BE
06/16/2026
Permit issued — Supported Scaffold
M01416837-I1-SF
06/16/2026
Special inspection requirement — Post-installed Anchors
Kemba Walcott
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kemba Walcott
06/15/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01416837-I1
06/15/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01416812-I1
06/15/2026
Permit issued — Sidewalk Shed
M01416812-I1-SH
06/01/2026
Filed — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY BUILDING: INSTALL A NEW AUTOMATIC WET SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00726001-P8
05/27/2026
Permit issued — Mechanical Systems
M00726001-S3-MS
05/11/2026
Permit issued — Structural
M00726001-S6-ST
05/07/2026
Special inspection requirement — Final
Kemba Walcott
05/07/2026
Special inspection requirement — Masonry
Kemba Walcott
05/07/2026
Special inspection requirement — Post-installed Anchors
Kemba Walcott
05/07/2026
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Kemba Walcott
05/07/2026
Special inspection requirement — Structural Steel - Details
Kemba Walcott
05/07/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Kemba Walcott
05/07/2026
Special inspection requirement — Structural Steel - Welding
Kemba Walcott
05/07/2026
Special inspection requirement — Structural Wood Frame
Kemba Walcott
05/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kemba Walcott
05/07/2026
Special inspection requirement — Wood – Seismic Resistance
Kemba Walcott
05/07/2026
Special inspection requirement — Concrete - Cast-In-Place
Kemba Walcott
04/29/2026
Violation issued (HPD, open)
A
04/28/2026
Special inspection requirement — Post-installed Anchors
Kemba Walcott
04/28/2026
Special inspection requirement — Sprinkler Systems
Kemba Walcott
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kemba Walcott
04/21/2026
Filed — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY BUILDING: INSTALL A NEW AUTOMATIC WET SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00726001-P3
04/14/2026
Filed — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY BUILDING: INSTALL A NEW AUTOMATIC WET SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00726001-P4
04/14/2026
Filed — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY BUILDING: INSTALL A NEW AUTOMATIC WET SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00726001-P5
04/14/2026
Filed — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY BUILDING: INSTALL A NEW AUTOMATIC WET SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00726001-P6
04/14/2026
Filed — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY BUILDING: INSTALL A NEW AUTOMATIC WET SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00726001-P7
04/09/2026
Special inspection requirement — Structural Steel - Welding
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kemba Walcott
04/09/2026
Special inspection requirement — Post-installed Anchors
Kemba Walcott
04/09/2026
Special inspection requirement — Concrete - Cast-In-Place
04/09/2026
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
04/09/2026
Special inspection requirement — Masonry
04/09/2026
Special inspection requirement — Post-installed Anchors
04/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/09/2026
Special inspection requirement — Structural Steel - Details
04/09/2026
Special inspection requirement — Structural Steel - High Strength Bolting
04/09/2026
Special inspection requirement — Wood – Seismic Resistance
03/25/2026
Permit issued — General Construction
M00726001-I1-GC
03/23/2026
Permit issued — General Construction
M00726001-I1-GC
03/04/2026
Filed — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY BUILDING: INSTALL A NEW AUTOMATIC WET SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00726001-P2
12/18/2025
Filed — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY BUILDING: INSTALL A NEW AUTOMATIC WET SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00726001-P1
07/11/2024
Objection raised — Admin
07/11/2024
Objection resolved — Addressed
06/26/2024
Filed — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY BUILDING: INSTALL A NEW AUTOMATIC WET SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00726001-S6
06/04/2024
Filed — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY BUILDING: INSTALL A NEW AUTOMATIC WET SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00726001-S1
06/03/2024
Filed — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY BUILDING: INSTALL A NEW AUTOMATIC WET SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00726001-S5
06/03/2024
Filed — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY BUILDING: INSTALL A NEW AUTOMATIC WET SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00726001-S3
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedL.L.G. PLBG & HTG INC06/18/2026
DOB NOWSprinklersPermit IssuedCASINO PLMBG & HTG CORP06/17/2026
DOB NOWBoiler EquipmentPermit IssuedL.L.G. PLBG & HTG INC06/17/2026
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC06/16/2026
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC06/15/2026
DOB NOWMechanical SystemsPermit IssuedTOUCHSTONE RENOVATIONS LL05/27/2026
DOB NOWStructuralPermit IssuedTOUCHSTONE RENOVATIONS LL05/11/2026
DOB NOWGeneral ConstructionPermit IssuedSUMMIT JV LLC03/25/2026
DOB NOWGeneral ConstructionPermit IssuedSUMMIT JV LLC03/23/2026
BISEQISSUEDLILLY CONSTRUCTION CO., INC.05/11/2001
1 project · most recent 07/28/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/28/2026Permit IssuedTOUCHSTONE RENOVATIONS LLHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Rupp Air RARTUI-E.302-15-5T-DOAS 5 tons · Doas ×2
Ventilation
Greenheck USF-08-B3 675 CFM · Exhaust Fan ×4
CUE-100HP-VG 200 CFM · Exhaust Fan ×2
G-060-VG 60 CFM · Exhaust Fan ×2
1 project · most recent 07/28/2026
FiledStatusContractorScope
07/28/2026Permit IssuedCASINO PLMBG & HTG CORP88 heads
1 project · most recent 07/28/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/28/2026Permit IssuedL.L.G. PLBG & HTG INCGas, Storm, Water/Sanitary
3 projects · most recent 06/15/2026
FiledStatusContractorScope
06/15/2026Permit IssuedRICHARD NEU—
05/21/2026Permit IssuedELECTRICWORXNY CORP10 meters, 10 new_meters
01/28/2026Permit IssuedELECTRICWORXNY CORP—
1 project · most recent 07/28/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
07/28/2026Permit IssuedL.L.G. PLBG & HTG INCSteel, Concrete, Masonry, Wood
2 projects · most recent 08/11/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/11/2026Permit IssuedRELIABLE ENTERPRISES INCScaffold
06/15/2026Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
07/01/2026Post-installed AnchorsKemba Walcottspecial
07/01/2026Sprinkler SystemsKemba Walcottspecial
07/01/2026Fire-Resistant Penetrations and JointsKemba Walcottspecial
06/16/2026Post-installed AnchorsKemba Walcottspecial
06/16/2026Fire-Resistant Penetrations and JointsKemba Walcottspecial
05/07/2026FinalKemba Walcottprogress
05/07/2026MasonryKemba Walcottspecial
05/07/2026Post-installed AnchorsKemba Walcottspecial
05/07/2026Construction Utilizing CLT or SCL, Type IVKemba Walcottspecial
05/07/2026Structural Steel - DetailsKemba Walcottspecial
05/07/2026Structural Steel - High Strength BoltingKemba Walcottspecial
05/07/2026Structural Steel - WeldingKemba Walcottspecial
05/07/2026Structural Wood FrameKemba Walcottprogress
05/07/2026Structural Stability – Alterations of existing buildingsKemba Walcottspecial
05/07/2026Wood – Seismic ResistanceKemba Walcottspecial
05/07/2026Concrete - Cast-In-PlaceKemba Walcottspecial
04/28/2026Post-installed AnchorsKemba Walcottspecial
04/28/2026Sprinkler SystemsKemba Walcottspecial
04/28/2026Fire-Resistant Penetrations and JointsKemba Walcottspecial
04/09/2026Structural Steel - Welding—special
04/09/2026Fire-Resistant Penetrations and JointsKemba Walcottspecial
04/09/2026Post-installed AnchorsKemba Walcottspecial
04/09/2026Concrete - Cast-In-Place—special
04/09/2026Construction Utilizing CLT or SCL, Type IV—special
04/09/2026Masonry—special
Latest 25 of 55.
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/27/2026M00726001-P9Request digital key ↗
08/27/2026M00726001-A1Request digital key ↗
08/17/2026M00726001-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits15
▸DOB NOWLPC Approval/Permit15
08/27/2026M00726001-P9Open ↗
08/27/2026M00726001-A1Open ↗
08/17/2026M00726001-P6Open ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/27/2026M00726001-A1Open ↗
08/17/2026M00726001-P9Open ↗
08/17/2026M00726001-P8Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/25/2026M00726001-S4Open ↗
09/01/2026M00726001-P1Open ↗
09/01/2026M00726001-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M00726001-P1Open ↗
09/01/2026M00726001-P1Open ↗
08/30/2026M00726001-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/17/2026M00726001-I1Open ↗
08/17/2026M00726001-S6Open ↗
08/17/2026M00726001-S5Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
08/27/2026M00726001-A1Open ↗
08/17/2026M00726001-P8Open ↗
08/17/2026M00726001-P9Open ↗
Showing 3 of 17 on file for this type
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/27/2026M00726001-A1Open ↗
08/13/2026M00726001-I1Open ↗
08/13/2026M00726001-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProof of Historic Building4
08/27/2026M00726001-A1Open ↗
08/13/2026M00726001-P2Open ↗
08/13/2026M00726001-P1Open ↗
Showing 3 of 4 on file for this type