← Back
Four families
222 LEXINGTON AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3050573
💬 Discuss this project
1931Year Built
2Stories
C3Building Class
R6BZoning
2,400 sfGross Floor Area
4Units
Rent Stabilized13 Open Violations ▸FDNY Report ↗
Four families · 2,000 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction9p · 1 filing · 20 docs
Floor 3Under Construction16p · 2 filings · 20 docs
Floor 2Under Construction16p · 2 filings · 20 docs
Floor 1Under Construction16p · 2 filings · 20 docs
CellarUnder Construction20p · 2 filings · 20 docs
BasementUnder Construction16p · 1 filing · 20 docs
Sub-BasementUnder Construction1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRICKSTONE GROUP809/02/2026
ACE GROUP NY404/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/26/2025$1.6M—— → —$646/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CQ&J CORPORATION504/16/2026
VOLUME SPACE CONSULTING INC.112/01/2025
THOMAS C. TUNG, P.E.109/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH1003/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARKENSTONE BUILDERS INCGeneral Contractor207/08/2026
MOKEN HOME IMPROVEMENTGeneral Contractor209/02/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
ACE GROUP NY CORPGeneral Contractor104/09/2026
MORELL BUILDERS INCGeneral Contractor107/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SIMON7555304/16/2026
Building Lifecycle
All (80)Filed (7)Permit Issued (8)Violation (39)Inspection (8)Objection (12)Special Inspection (6)
09/01/2026
Permit issued — General Construction
B01289990-I1-GC-CX
07/02/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/26/2026
Permit issued — Mechanical Systems
B01289990-S3-MS
05/05/2026
Violation issued (HPD, open)
A
04/16/2026
Filed — Alteration CO
PROVIDE NEW FIRE SPRINKLER SYSTEM THROUGHOUT FOUR STORY RESIDENTIAL BUILDING WITH CELLAR IN CONJUNCTION WITH ALT CO JOB # B01289990-I1
B01289990-S3
03/19/2026
Permit issued — Structural
B01289990-I1-GC-CX
01/26/2026
Permit issued — Plumbing
B01289990-S1-PL
01/26/2026
Permit issued — Sprinklers
B01289990-S2-EW-SP
01/05/2026
Filed — Alteration CO
PROVIDE NEW FIRE SPRINKLER SYSTEM THROUGHOUT FOUR STORY RESIDENTIAL BUILDING WITH CELLAR IN CONJUNCTION WITH ALT CO JOB # B01289990-I1
B01289990-S2
01/05/2026
Filed — Alteration CO
PROVIDE NEW FIRE SPRINKLER SYSTEM THROUGHOUT FOUR STORY RESIDENTIAL BUILDING WITH CELLAR IN CONJUNCTION WITH ALT CO JOB # B01289990-I1
B01289990-S1
12/31/2025
Special inspection requirement — Maintenance information
CALVIN TRAN
12/23/2025
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
12/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
CALVIN TRAN
12/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
CALVIN TRAN
12/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CALVIN TRAN
12/04/2025
Objection resolved — Addressed
12/01/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01326525-I1
12/01/2025
Permit issued — Supported Scaffold
B01326525-I1-SF
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/30/2025
Special inspection requirement — Sprinkler Systems
SIMON JIANG
10/27/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/22/2025
Permit issued — General Construction
B01291320-I1-GC
10/09/2025
Permit issued — Construction Fence
B01295500-I1-FN
10/09/2025
Objection raised — Scope
10/09/2025
Objection raised — Scope
10/09/2025
Objection raised — Fire_Protection
10/09/2025
Objection raised — Scope
10/09/2025
Objection raised — Scope
10/09/2025
Objection raised — Energy
10/01/2025
Filed — Alteration
INSTALL 8'H CONSTRUCTION FENCE IN CONJUNCTION WITH DOB# B01291320-I1 . NO CHANGE OCCUPANCY, USE OR EGRESS.
B01295500-I1
09/30/2025
Filed — Alteration CO
PROVIDE NEW FIRE SPRINKLER SYSTEM THROUGHOUT FOUR STORY RESIDENTIAL BUILDING WITH CELLAR IN CONJUNCTION WITH ALT CO JOB # B01289990-I1
B01289990-I1
09/25/2025
Filed — Alteration
INTERIOR DEMOLITION ON EXISTING THREE (3) STORY W. BASEMENT &CELLAR, ONE (1) FAMILY + 6 S.R.O. BUILDING. NO EXTERIOR WORK,NO CHANGE OF BUILDING BULK, OCCUPANCY OR EGRESS
B01291320-I1
06/10/2025
Violation issued (HPD, closed)
A
11/27/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/05/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/05/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/05/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/10/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/23/2023
Violation issued (HPD, closed)
A
11/09/2022
Violation issued (HPD, closed)
I
02/25/2022
Violation issued (HPD, closed)
I
02/25/2022
Violation issued (HPD, closed)
A
04/09/2021
Violation issued (HPD, closed)
I
04/09/2021
Violation issued (HPD, closed)
A
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMOKEN HOME IMPROVEMENT09/01/2026
DOB NOWMechanical SystemsPermit IssuedMORELL BUILDERS INC05/26/2026
DOB NOWStructuralPermit IssuedMOKEN HOME IMPROVEMENT03/19/2026
DOB NOWPlumbingPermit IssuedPLBG P & H INC01/26/2026
DOB NOWSprinklersPermit IssuedBRUCHE MECHANICAL NY LLC01/26/2026
DOB NOWSupported ScaffoldSigned-offACE GROUP NY CORP12/01/2025
DOB NOWGeneral ConstructionPermit IssuedARKENSTONE BUILDERS INC10/22/2025
DOB NOWConstruction FencePermit IssuedARKENSTONE BUILDERS INC10/09/2025
1 project · most recent 04/16/2026
Sprinkler System
FiledStatusContractorScope
04/16/2026Permit IssuedPLBG P & H INCSprinkler System
1 project · most recent 04/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/16/2026Permit IssuedPLBG P & H INCGas, Water/Sanitary
1 project · most recent 12/15/2025
General Wiring
FiledStatusContractorScope
12/15/2025Permit IssuedFLOW STATE ELECTRIC, LLCGeneral Wiring
1 project · most recent 04/16/2026
Steel Wood
FiledStatusContractorScope
04/16/2026Permit IssuedMOKEN HOME IMPROVEMENTSteel, Wood
2 projects · most recent 12/01/2025
Scaffold Fence
FiledStatusContractorScope
12/01/2025Signed-offACE GROUP NY CORPScaffold
10/01/2025Permit IssuedARKENSTONE BUILDERS INCFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/05/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/05/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/05/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/31/2025Maintenance informationCALVIN TRANenergy_progress
12/23/2025Energy Code Compliance InspectionsCALVIN TRANprogress
12/18/2025HVAC-R and service water heating system controlsCALVIN TRANenergy_progress
12/18/2025HVAC-R and service water heating equipmentCALVIN TRANenergy_progress
12/18/2025HVAC-R and service water piping design and insulationCALVIN TRANenergy_progress
10/30/2025Sprinkler SystemsSIMON JIANGspecial
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026B01291320-I1Request digital key ↗
08/20/2026B01295500-I1Request digital key ↗
08/19/2026B01326525-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026B01289990-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026B01289990-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026B01289990-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026B01295500-I1Open ↗
08/17/2026B01289990-I1Open ↗
08/17/2026B01289990-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026B01289990-S1Open ↗
08/26/2026B01289990-S1Open ↗
08/26/2026B01289990-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/05/2026B01289990-S2Open ↗
▸Safety & Tenant Protection9
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist8
08/17/2026B01289990-I1Open ↗
08/17/2026B01289990-S3Open ↗
08/13/2026B01289990-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStreet Tree Checklist1
08/17/2026B01289990-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026B01289990-I1Open ↗
08/17/2026B01289990-S3Open ↗
08/17/2026B01289990-S2Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification1
08/17/2026B01289990-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026B01289990-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026B01289990-I1Open ↗
▸DOB NOWPlot Diagram1
08/17/2026B01289990-I1Open ↗