← Back
BuildNYC
Miscellaneous two family
222 MONAHAN AVENUE
STATEN ISLAND · BIN 5038212
💬 Discuss this project
1980Year Built
3Stories
B9Building Class
R3-1Zoning
1,960 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Miscellaneous two family · 2,500 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exterior5p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Steven R. Savino Architect209/18/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sken ServicesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Steven R. Savino Architects1216209/18/2025
Building Lifecycle
09/22/2025
Signed off — Alteration
Filing to remove the existing deck at grade, reduce the balcony located at the second floor at the rear of the house and reinstall the platform and stair off the rear of the house at ground level filed in conjunction with application no. 500798755.
S01279170-I1
09/19/2025
Special inspection requirement — Final
Steven Savino
09/19/2025
Special inspection requirement — Subgrade Inspections
Steven Savino
09/19/2025
Special inspection requirement — Concrete - Cast-In-Place
Steven Savino
09/18/2025
Filed — Alteration
Filing to remove the existing deck at grade, reduce the balcony located at the second floor at the rear of the house and reinstall the platform and stair off the rear of the house at ground level filed in conjunction with application no. 500798755.
S01279170-P1
11 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTT & T Construction09/05/2025
BISOTISSUEDAmiko Engineering10/05/2005
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
09/19/2025FinalSteven Savinoprogress
09/19/2025Subgrade InspectionsSteven Savinospecial
09/19/2025Concrete - Cast-In-PlaceSteven Savinospecial
09/18/2025FinalSteven Savinoprogress
09/18/2025Concrete - Cast-In-PlaceSteven Savinospecial
09/18/2025Subgrade InspectionsSteven Savinospecial
20 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account