← Back
Multi-story retail building (2+)
222 WEST 125 STREET
MANHATTAN · Harlem (South) · BIN 1058642
💬 Discuss this project
1920Year Built
2Stories
K2Building Class
C4-4DZoning
15,678 sfGross Floor Area
1Units
0 Open Violations
Multi-story retail building (2+) · Owner of record: 125 UPTOWN REALTY LLC · 7,872 sf lot · 1.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Roof2p · 1 filing · 20 docs
Floor 51p · 1 filing · 6 docs
Floor 41p · 1 filing · 6 docs
Floor 31p · 1 filing · 6 docs
Floor 21p · 1 filing · 6 docs
Floor 146p · 4 filings · 20 docs
Cellar36p · 2 filings · 20 docs
Site & exterior3p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COLGATE ENTERPRISES603/21/2026
JENEL MANAGEMENT CORP.407/08/2026
125 UPTOWN REALTY C O JENEL MGT203/21/2026
ALL IN PERMIT CONSULTANTS103/22/2026
AMBROSINO CONSTRUCTION103/22/2026
CHARMING SHOPPERS INC.103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RICHARD WAINER ARCHITECT, PLLC1403/21/2026
BUILDING VIOLATION SOLUTIONS203/21/2026
ALL IN PERMIT CONSULTANTS103/21/2026
LOUIS STRIAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PAV-LAK CONTRACTING INCGeneral Contractor403/21/2026
AMBROSINO CONST CORPGeneral Contractor407/08/2026
NAPSTAR ELECTRIC INCElectrical103/22/2026
PROFF ELECTRICAL LLCElectrical103/22/2026
REY, JOHNElectrical103/21/2026
VINCENZO NAPOLITANOElectrical103/21/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
FOUNTAIN OF TREVI, INCPlumbing107/08/2026
CAPITOL DESIGN MAINT INScaffold107/08/2026
ANTONY GIRONTAElectrical103/21/2026
NATIONAL MAINTENANCEScaffold107/08/2026
GEHRKE, BRIANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495711/06/2023
DELTA TESTING LABS687210/16/2023
ANCORA ENGINEERING, PLLC6818108/09/2023
NKM ENGINEERING PLLC6244106/28/2023
Building Lifecycle
All (88)Filed (13)Permit Issued (9)Signed Off (9)Violation (2)Inspection (5)Objection (20)Special Inspection (30)
12/21/2023
Signed off — Alteration
Structural work to add openings for a dumbwaiter and chute from the first floor to the cellar filed in conjunction with M00878865-I1. No change in egress, use or occupancy.
M00878865-S1
12/15/2023
Signed off — Alteration
Structural work to add openings for a dumbwaiter and chute from the first floor to the cellar filed in conjunction with M00878865-I1. No change in egress, use or occupancy.
M00878865-I1
12/13/2023
Signed off — Alteration
ERECT 4 ILLUMINATED SIGNS ACCESSORY TO JD SPORTS.
M00954210-I1
12/04/2023
Signed off — Alteration
Structural work to add openings for a dumbwaiter and chute from the first floor to the cellar filed in conjunction with M00878865-I1. No change in egress, use or occupancy.
M00878865-S3
12/04/2023
Signed off — Alteration
Structural work to add openings for a dumbwaiter and chute from the first floor to the cellar filed in conjunction with M00878865-I1. No change in egress, use or occupancy.
M00878865-S2
12/01/2023
Signed off — Alteration
FILING FOR MODIFYING SPRINKLER WORK IN CONJUNCTION WITH DOB NOW APPLICATION #M00854184-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00854184-I1
11/30/2023
Signed off — Alteration
M00915842-I1
11/27/2023
Permit issued — Structural
M00915842-I1-ST
11/17/2023
Permit issued — Sign
M00954210-I1-SG
11/15/2023
Filed — Alteration
ERECT 4 ILLUMINATED SIGNS ACCESSORY TO JD SPORTS.
M00954210-I1
11/13/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/09/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Rajasekhar Sakhamuri
11/09/2023
Special inspection requirement — Post-installed Anchors
Rajasekhar Sakhamuri
11/09/2023
Special inspection requirement — Structural Steel - Details
Rajasekhar Sakhamuri
11/09/2023
Special inspection requirement — Final
Rajasekhar Sakhamuri
11/06/2023
Filed — Alteration
Structural work to add openings for a dumbwaiter and chute from the first floor to the cellar filed in conjunction with M00878865-I1. No change in egress, use or occupancy.
M00878865-P2
11/01/2023
Filed — Alteration
Structural work to add openings for a dumbwaiter and chute from the first floor to the cellar filed in conjunction with M00878865-I1. No change in egress, use or occupancy.
M00878865-P1
11/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
11/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
11/01/2023
Special inspection requirement — Fire-Resistance Rated Construction
Rajasekhar Sakhamuri
11/01/2023
Special inspection requirement — Lighting controls
Rajasekhar Sakhamuri
11/01/2023
Special inspection requirement — Interior lighting power
Rajasekhar Sakhamuri
11/01/2023
Special inspection requirement — Final
Rajasekhar Sakhamuri
10/30/2023
Filed — Alteration
Structural work to add openings for a dumbwaiter and chute from the first floor to the cellar filed in conjunction with M00878865-I1. No change in egress, use or occupancy.
M00878865-P4
10/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Rajasekhar Sakhamuri
10/30/2023
Special inspection requirement — Heating Systems
Rajasekhar Sakhamuri
10/30/2023
Special inspection requirement — Mechanical Systems
Rajasekhar Sakhamuri
10/30/2023
Special inspection requirement — Final
Rajasekhar Sakhamuri
10/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
Rajasekhar Sakhamuri
10/30/2023
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
10/30/2023
Special inspection requirement — Shutoff dampers
Rajasekhar Sakhamuri
10/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
Rajasekhar Sakhamuri
10/26/2023
Special inspection requirement — Final
SALVATOR CARADONNA
10/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Rajasekhar Sakhamuri
10/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
Rajasekhar Sakhamuri
10/24/2023
Special inspection requirement — Heating Systems
Rajasekhar Sakhamuri
10/24/2023
Special inspection requirement — Mechanical Systems
Rajasekhar Sakhamuri
10/24/2023
Special inspection requirement — Final
Rajasekhar Sakhamuri
10/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
Rajasekhar Sakhamuri
10/24/2023
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
10/24/2023
Special inspection requirement — Shutoff dampers
Rajasekhar Sakhamuri
10/19/2023
Special inspection requirement — Fire-Resistance Rated Construction
Rajasekhar Sakhamuri
10/19/2023
Special inspection requirement — Final
Rajasekhar Sakhamuri
10/19/2023
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
10/16/2023
Filed — Alteration
FILING FOR MODIFYING SPRINKLER WORK IN CONJUNCTION WITH DOB NOW APPLICATION #M00854184-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00854184-P1
10/02/2023
Signed off — Alteration
FILING FOR MODIFYING SPRINKLER WORK IN CONJUNCTION WITH DOB NOW APPLICATION #M00854184-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00854184-S1
09/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/14/2023
Permit issued — Plumbing
M00878865-S2-PL
09/11/2023
Permit issued — Mechanical Systems
M00878865-S3-MS
09/11/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/01/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/30/2023
Permit issued — General Construction
M00878865-I1-GC
08/29/2023
Permit issued — Structural
M00878865-S1-ST
08/29/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/22/2023
Objection resolved — Addressed
08/22/2023
Objection resolved — Addressed
08/09/2023
Filed — Alteration
M00915842-I1
08/08/2023
Objection resolved — Addressed
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offPAV-LAK CONTRACTING INC11/27/2023
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC11/17/2023
DOB NOWPlumbingSigned-offTREVI PLUMBING INC09/14/2023
DOB NOWMechanical SystemsSigned-offAMBROSINO CONST09/11/2023
DOB NOWGeneral ConstructionSigned-offAMBROSINO CONST08/30/2023
DOB NOWStructuralSigned-offAMBROSINO CONST08/29/2023
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN07/06/2023
DOB NOWGeneral ConstructionSigned-offPAV-LAK CONTRACTING INC05/24/2023
DOB NOWSignSigned-offCAPITOL DESIGN & MAINT IN05/14/2018
BISEQISSUEDCOLGATE ENTERPRISE CORP08/22/2013
BISEQISSUEDCOLGATE ENTERPRISE CORP07/16/2013
BISOTISSUEDRECTENWALD BROTHERS CONST04/15/2013
BISEQISSUEDCOLGATE ENTERPRISE CORP01/30/2013
BIS—ISSUEDNATIONAL MAINTENANCE, INC12/03/2012
BISPLISSUEDMACCARONE PLUMBING INC10/24/2012
BISOTISSUEDRECTENWALD BROTHERS CONST09/20/2012
BIS—ISSUEDNORTH SHORE NEON SIGN12/05/1997
BISPLISSUEDA P I PLUMBING,INC.12/02/1997
BISOTISSUEDMANHATTAN BUSINESS INTERIORS10/01/1997
BISOTISSUEDMANHATTAN BUSINESS INTERIORS10/01/1997
BISEQISSUEDATLANTIC SCAFFOLDING08/30/1995
BIS—ISSUEDASSERTIVE INTERIORS10/27/1992
BISMHISSUEDPEROTTO ASSOCIATES03/27/1991
7 projects · most recent 03/05/2024
General Wiring
FiledStatusContractorScope
03/05/2024CompleteAGIR ELEC'L LTD. D/B/AGeneral Wiring
01/09/2024CompletePROFF ELECTRICAL LLC—
11/20/2023CompleteNAPSTAR ELECTRIC INCGeneral Wiring
11/14/2023CompletePROFF ELECTRICAL LLC—
11/08/2023CompletePROFF ELECTRICAL LLC—
11/08/2023CompletePROFF ELECTRICAL LLC—
11/03/2023CompleteNAPSTAR ELECTRIC INC—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/01/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/29/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
11/09/2023Structural Stability – Alterations of existing buildingsRajasekhar Sakhamurispecial
11/09/2023Post-installed AnchorsRajasekhar Sakhamurispecial
11/09/2023Structural Steel - DetailsRajasekhar Sakhamurispecial
11/09/2023FinalRajasekhar Sakhamuriprogress
11/01/2023Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
11/01/2023Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
11/01/2023Fire-Resistance Rated ConstructionRajasekhar Sakhamuriprogress
11/01/2023Lighting controlsRajasekhar Sakhamurienergy_progress
11/01/2023Interior lighting powerRajasekhar Sakhamurienergy_progress
11/01/2023FinalRajasekhar Sakhamuriprogress
10/30/2023HVAC-R and service water piping design and insulationRajasekhar Sakhamurienergy_progress
10/30/2023Heating SystemsRajasekhar Sakhamurispecial
10/30/2023Mechanical SystemsRajasekhar Sakhamurispecial
10/30/2023FinalRajasekhar Sakhamuriprogress
10/30/2023HVAC-R and service water heating equipmentRajasekhar Sakhamurienergy_progress
10/30/2023Maintenance informationRajasekhar Sakhamurienergy_progress
10/30/2023Shutoff dampersRajasekhar Sakhamurienergy_progress
10/30/2023HVAC-R and service water heating system controlsRajasekhar Sakhamurienergy_progress
10/26/2023FinalSALVATOR CARADONNAprogress
10/24/2023HVAC-R and service water piping design and insulationRajasekhar Sakhamurienergy_progress
10/24/2023HVAC-R and service water heating system controlsRajasekhar Sakhamurienergy_progress
10/24/2023Heating SystemsRajasekhar Sakhamurispecial
10/24/2023Mechanical SystemsRajasekhar Sakhamurispecial
10/24/2023FinalRajasekhar Sakhamuriprogress
10/24/2023HVAC-R and service water heating equipmentRajasekhar Sakhamurienergy_progress
Latest 25 of 44.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
JD SportsRetailCellar, Floors 1, 2
Project M00954210 Alteration · LOC Issued · 11/15/2023
Project M00878865 Alteration · LOC Issued · 07/05/2023
Lane Bryant OutletRetailFloors 1–5
Project M00037427 Alteration · LOC Issued · 05/10/2018
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 184 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/06/2026M00037427-I1Request digital key ↗
08/29/2026M00915842-I1Request digital key ↗
08/29/2026M00854184-S1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION11
11/20/2013121842266Open ↗
10/11/2013121511462Open ↗
10/09/2013121511462Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION9
12/03/2013121842266Open ↗
09/05/2013121754645Open ↗
07/24/2013121714190Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications85
▸DOB NOWProgress Inspector Seal & Signature33
09/25/2026M00878865-I1Open ↗
09/25/2026M00878865-I1Open ↗
09/25/2026M00878865-I1Open ↗
Showing 3 of 33 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
04/22/2014121754645Open ↗
04/22/2014121754645Open ↗
01/23/2014121445249Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/06/2026M00037427-I1Open ↗
08/29/2026M00915842-I1Open ↗
08/29/2026M00854184-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/25/2026M00878865-I1Open ↗
08/25/2026M00878865-S1Open ↗
08/25/2026M00878865-S1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
11/20/2013121842266Open ↗
08/22/2013121754645Open ↗
07/25/2013121714190Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
08/22/2013121754645Open ↗
07/25/2013121714190Open ↗
04/16/2013121511462Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/20/2013121842266Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
03/08/2013121364852Open ↗
11/23/2012121364852Open ↗
▸BISSCHEDULE B - PLUMBING1
09/10/2012121364852Open ↗
▸Environmental & Asbestos32
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/06/2026M00037427-I1Open ↗
08/29/2026M00915842-I1Open ↗
08/29/2026M00854184-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice to Proceed9
09/06/2026M00037427-I1Open ↗
08/13/2026M00854184-I1Open ↗
08/13/2026M00878865-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWOER: Notice of Satisfaction7
09/06/2026M00037427-I1Open ↗
08/13/2026M00878865-I1Open ↗
08/13/2026M00878865-S1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
07/25/2013121714190Open ↗
12/06/2012121445249Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/10/2012121364852Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/10/2012121364852Open ↗
▸Approvals, Objections & Sign-offs13
▸BISADMINISTRATIVE OBJECTIONS4
04/16/2013121511462Open ↗
01/31/2013121515477Open ↗
12/06/2012121445249Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
04/22/2014121754645Open ↗
01/30/2014121511462Open ↗
12/30/2013121714190Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
04/22/2014121754645Open ↗
01/23/2014121445249Open ↗
01/08/2014121515477Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
04/16/2013121511462Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
01/23/2014121445249Open ↗
11/20/2013121842266Open ↗
10/11/2013121511462Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET7
11/20/2013121842266Open ↗
09/05/2013121754645Open ↗
07/25/2013121714190Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION2
10/11/2013121511462Open ↗
10/09/2013121364852Open ↗
▸Other Documents1
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED1
11/02/2012121364852Open ↗