← Back
Primarily 1 family with 1 store or office
2220 PITKIN AVENUE
BROOKLYN · BIN 3089076
💬 Discuss this project
1935Year Built
2Stories
S1Building Class
R7AZoning
2,064 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Primarily 1 family with 1 store or office · 1,875 sf lot · 1.1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 6 docs
Floor 116p · 3 filings · 18 docs
Cellar7p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1711 PALMETTO AVE1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INSIGHT STUDIO ARCHITECTURE PC401/24/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MCINTOSH, ABIELElectrical103/21/2026
SAVAGE, EDLEYElectrical103/21/2026
J. SIBAJA KITCHEN AND VE*General Contractor107/08/2026
OASIS PLOMO CORPGeneral Contractor104/09/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PHILIBERT ENGINEERING, PC223207/08/2024
Building Lifecycle
All (22)Filed (4)Permit Issued (3)Violation (5)Inspection (3)Special Inspection (7)
07/14/2025
Violation issued (FDNY_NOV, closed)
06/03/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/27/2025
Permit issued — General Construction
B01039297-I1-GC
01/24/2025
Filed — Alteration
Plumbing work associated with food store renovation.
B01073571-P1
01/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/12/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/26/2024
Permit issued — Plumbing
B01073571-I1-PL
07/16/2024
Permit issued — Mechanical Systems
B01066427-I1-MS
07/08/2024
Filed — Alteration
Interior renovation of existing commercial space to combine with adjacent grocery store. create opening in existing masonry wall to connect to adjacent building. No change in egress use or occupancy.
B01039297-I1
07/02/2024
Filed — Alteration
Plumbing work associated with food store renovation.
B01073571-I1
06/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jacky Philibert
06/28/2024
Special inspection requirement — Interior lighting power
Jacky Philibert
06/28/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jacky Philibert
06/17/2024
Filed — Alteration
Installation of kitchen exhaust hood and duct. No change in egress, use or occupancy.
B01066427-I1
06/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jacky Philibert
06/13/2024
Special inspection requirement — Final
Jacky Philibert
06/13/2024
Special inspection requirement — Mechanical Systems
Jacky Philibert
08/28/2019
Violation issued (FDNY_NOV, closed)
11/29/2018
Violation issued (FDNY_NOV, closed)
06/22/2018
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedOASIS PLOMO CORP01/27/2025
DOB NOWPlumbingPermit IssuedSIGNORE & SONS PLBG CORP07/26/2024
DOB NOWMechanical SystemsPermit IssuedJ. SIBAJA KITCHEN AND VE*07/16/2024
1 project · most recent 06/17/2024
Others
FiledStatusContractorScopeMake / Model / Capacity
06/17/2024Permit IssuedJ. SIBAJA KITCHEN AND VE*Others
Other
Greenheck CUE 2,500 CFM · Exhaust Fan ×1
1 project · most recent 01/24/2025
Gas Water/Sanitary
FiledStatusContractorScope
01/24/2025Permit IssuedSIGNORE & SONS PLBG CORPGas, Water/Sanitary
1 project · most recent 05/13/2024
General Wiring
FiledStatusContractorScope
05/13/2024Permit IssuedRM ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/12/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
01/24/2025Tenant Protection Plan Compliance—special
06/28/2024Structural Stability – Alterations of existing buildingsJacky Philibertspecial
06/28/2024Interior lighting powerJacky Philibertenergy_progress
06/28/2024Tenant Protection Plan ComplianceJacky Philibertspecial
06/17/2024Tenant Protection Plan ComplianceJacky Philibertspecial
06/13/2024FinalJacky Philibertprogress
06/13/2024Mechanical SystemsJacky Philibertspecial
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026B01066427-I1Request digital key ↗
08/24/2026B01039297-I1Request digital key ↗
08/23/2026B01073571-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026B01073571-P1Open ↗
08/23/2026B01073571-I1Open ↗
08/13/2026B01066427-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01066427-I1Open ↗
09/01/2026B01066427-I1Open ↗
08/24/2026B01039297-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B01066427-I1Open ↗
08/24/2026B01039297-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B01073571-I1Open ↗
08/23/2026B01073571-P1Open ↗
08/13/2026B01066427-I1Open ↗
Showing 3 of 4 on file for this type