← Back
BuildNYC
Primarily 2 family with 1 store or office
2223 86TH STREET
BROOKLYN · BIN 3165952
💬 Discuss this project
1919Year Built
3Stories
S2Building Class
R5Zoning
3,120 sfGross Floor Area
3Units
Rent Stabilized23 Active Violations 22 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: Distribuidora Asia · 2,000 sf lot · 1.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInterior and exterior renovation, cellar and 1st floor3p · 2 filings · 9 docs
Floor 1Golden Dragon Market15p · 6 filings · 20 docs
CellarInterior and exterior renovation, cellar and 1st floor10p · 5 filings · 20 docs
Site & exteriorGolden Dragon Market11p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Breadzone303/21/2026
Distribuidora Asia103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J&R Design and Inspection108/24/2021
CL Engineering707/20/2021
Syed Engineering205/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
High Quality 3381603/21/2026
Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
American Standard P&H CororpPlumbing1107/08/2026
High Quality ConstructionGeneral Contractor707/08/2026
Topline NYC ContractingScaffold603/21/2026
High Quality ConstructionScaffold307/08/2026
Mes ConstructionPlumbing107/08/2026
So Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R Design and Inspection6637208/24/2021
CL Engineering6781407/20/2021
Building Lifecycle
All (104)Filed (10)Permit Issued (12)Signed Off (9)Violation (52)Inspection (1)Special Inspection (20)
11/24/2025
Violation issued (HPD, open)
I
11/21/2025
Violation issued (ECB, open)
Construction
11/21/2025
Violation issued (ECB, closed)
Construction
12/04/2024
Violation issued (HPD, open)
I
11/28/2023
Violation issued (HPD, open)
I
11/17/2022
Violation issued (HPD, open)
I
01/03/2022
Signed off — Alteration
INTERIOR AND EXTERIOR RENOVATION AT CELLAR AND 1ST FLOOR OF EXIST. MIXED USE BUILDING WITH, RELOCATE/REPLACE/NEW REFRIGERATION AND AIR CONDITIONING SYSTEMS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00581895-I1
11/12/2021
Signed off — Alteration
B00523586-I1
11/12/2021
Signed off — Alteration
B00523530-I1
09/10/2021
Signed off — Alteration
RENOVATION OF EXIST. MIXED USE BUILDING WITH, REPLACE/NEW AWNING AS PER PLAN. CONJUNCTION WITH DOB JOB #B00490717.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00495348-I1
08/31/2021
Signed off — Alteration
B00490717-I1
08/31/2021
Signed off — Alteration
B00490718-I1
08/25/2021
Permit issued — Mechanical Systems
B00581895-I1-MS
08/24/2021
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION AT CELLAR AND 1ST FLOOR OF EXIST. MIXED USE BUILDING WITH, RELOCATE/REPLACE/NEW REFRIGERATION AND AIR CONDITIONING SYSTEMS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00581895-I1
08/23/2021
Special inspection requirement — Final
Robert Truskosky
08/23/2021
Special inspection requirement — Fire-Resistance Rated Construction
Robert Truskosky
08/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
08/23/2021
Special inspection requirement — Mechanical Systems
Robert Truskosky
08/23/2021
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
08/23/2021
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
08/23/2021
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
08/23/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
08/03/2021
Signed off — Alteration
B00504453-I1
07/29/2021
Permit issued — General Construction
B00495348-I1-GC
07/28/2021
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE WITH, RELOCATE / REPLACE / NEW PLUMBING FIXTURE AND HOT WATER HEATER AND BOILER. NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPANCY.
B00491517-I1
07/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/22/2021
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
07/22/2021
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
07/22/2021
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
07/22/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
07/20/2021
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE WITH, RELOCATE / REPLACE / NEW PLUMBING FIXTURE AND HOT WATER HEATER AND BOILER. NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPANCY.
B00491517-P1
07/19/2021
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
07/19/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
07/19/2021
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
07/19/2021
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
07/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/08/2021
Signed off — Alteration
B00491623-I1
07/01/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/11/2021
Permit issued — Plumbing
B00491517-I1-PL
06/04/2021
Violation issued (ECB, closed)
Construction
05/28/2021
Permit issued — Boiler Equipment
B00491623-I1-BE
05/19/2021
Permit issued — Sidewalk Shed
B00523586-I1-SH
05/18/2021
Permit issued — Supported Scaffold
B00523530-I1-SF
05/17/2021
Filed — Alteration
B00523586-I1
05/17/2021
Filed — Alteration
B00523530-I1
05/06/2021
Permit issued — Construction Fence
B00490718-I1-FN
05/04/2021
Permit issued — General Construction
B00504453-I1-GC
05/04/2021
Permit issued — General Construction
B00490717-I1-GC
04/19/2021
Filed — Alteration
B00504453-I1
04/09/2021
Permit issued — Plumbing
B00491517-I1-PL
04/02/2021
Permit issued — Construction Fence
B00490718-I1-FN
04/01/2021
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE WITH, RELOCATE / REPLACE / NEW PLUMBING FIXTURE AND HOT WATER HEATER AND BOILER. NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPANCY.
B00491517-I1
03/31/2021
Filed — Alteration
RENOVATION OF EXIST. MIXED USE BUILDING WITH, REPLACE/NEW AWNING AS PER PLAN. CONJUNCTION WITH DOB JOB #B00490717.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00495348-I1
03/31/2021
Permit issued — General Construction
B00490717-I1-GC
03/30/2021
Special inspection requirement — Final
Robert Truskosky
03/30/2021
Special inspection requirement — Fire-Resistance Rated Construction
Robert Truskosky
03/26/2021
Filed — Alteration
B00491623-I1
03/24/2021
Filed — Alteration
B00490717-I1
03/24/2021
Filed — Alteration
B00490718-I1
02/24/2020
Violation issued (FDNY_NOV, closed)
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHigh Quality Construction08/25/2021
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction07/29/2021
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp06/11/2021
DOB NOWBoiler EquipmentSigned-offMes Construction05/28/2021
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting05/19/2021
DOB NOWSupported ScaffoldSigned-offTopline NYC Contracting05/18/2021
DOB NOWConstruction FenceSigned-offHigh Quality Construction05/06/2021
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction05/04/2021
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction05/04/2021
DOB NOWPlumbingSigned-offNicholas Suida04/09/2021
DOB NOWConstruction FenceSigned-offHigh Quality Construction04/02/2021
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction03/31/2021
BISOTISSUEDHigh Quality Construction10/06/2020
BISOTISSUEDHigh Quality Construction11/23/2010
BISPLISSUEDChinatown Plumbing & Heating04/28/2010
BISOTISSUEDSiteline Design & Construction04/26/2010
BISFPISSUEDMaster Fire Systems07/27/2004
BISFPISSUEDLund Fire Products Co11/20/2002
2 projects · most recent 07/16/2021
General Wiring
FiledStatusContractorScope
07/16/2021CompleteKJK ElectricGeneral Wiring
05/18/2021Permit IssuedRichard Neu—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/01/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
08/23/2021FinalRobert Truskoskyprogress
08/23/2021Fire-Resistance Rated ConstructionRobert Truskoskyprogress
08/23/2021Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
08/23/2021Mechanical SystemsRobert Truskoskyspecial
08/23/2021Energy Code Compliance InspectionsRobert Truskoskyprogress
08/23/2021HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
08/23/2021HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
08/23/2021HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
07/22/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/22/2021Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
07/22/2021HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
07/22/2021HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
07/22/2021HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
07/19/2021HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
07/19/2021HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
07/19/2021HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
07/19/2021Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
07/19/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
03/30/2021FinalRobert Truskoskyprogress
03/30/2021Fire-Resistance Rated ConstructionRobert Truskoskyprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Golden Dragon MarketRetailFloor 1
Project B00495348 Alteration · LOC Issued · 03/31/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/01/2026B00490718-I1Request digital key ↗
09/01/2026B00490717-I1Request digital key ↗
09/01/2026B00491623-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
09/25/2020340769984Open ↗
10/25/2010320230718Open ↗
06/02/2010320127368Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
10/06/2020340769984Open ↗
11/24/2010320230718Open ↗
05/21/2010320127368Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026B00490718-I1Open ↗
09/01/2026B00490717-I1Open ↗
09/01/2026B00491623-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00495348-I1Open ↗
09/01/2026B00495348-I1Open ↗
08/24/2026B00491517-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
04/29/2011320127368Open ↗
02/28/2011320230718Open ↗
10/25/2010320230718Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026B00491517-P1Open ↗
08/23/2026B00581895-I1Open ↗
08/23/2026B00491517-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/25/2020340769984Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/25/2020340769984Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/25/2020340769984Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING2
06/02/2010320127368Open ↗
03/11/2010320127368Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
09/22/2010320127368Open ↗
07/22/2010320127368Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
04/29/2011320127368Open ↗
03/11/2010320127368Open ↗
▸BISEQUIPMENT USE PERMITS1
04/29/2011320127368Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
09/22/2010320127368Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
10/25/2010320230718Open ↗
03/11/2010320127368Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
02/26/2021340769984Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00490717-I1Open ↗
09/01/2026B00491623-I1Open ↗
09/01/2026B00495348-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/25/2010320230718Open ↗
03/11/2010320127368Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/25/2020340769984Open ↗
▸Energy Compliance8
▸DOB NOWEN2: As Built Energy Analysis.4
09/01/2026B00581895-I1Open ↗
08/13/2026B00491623-I1Open ↗
08/13/2026B00491517-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/26/2021340769984Open ↗
10/06/2020340769984Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/26/2021340769984Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/25/2020340769984Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/01/2021340769984Open ↗
02/26/2021340769984Open ↗
10/06/2020340769984Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
03/01/2021340769984Open ↗
05/03/2011320127368Open ↗
03/14/2011320230718Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
10/25/2010320230718Open ↗
03/11/2010320127368Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
02/26/2021340769984Open ↗
09/25/2020340769984Open ↗
04/29/2011320127368Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET2
10/25/2010320230718Open ↗
03/11/2010320127368Open ↗
▸BISADDITIONAL INFORMATION2
08/19/2010320127368Open ↗
06/02/2010320127368Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/25/2020340769984Open ↗