← Back
Elevator apt, semi-fireproof without stores
2225 BENSON AVENUE
BROOKLYN · BIN 3167123
💬 Discuss this project
1960Year Built
6Stories
D1Building Class
R5Zoning
52,542 sfGross Floor Area
69Units
LL97 CoveredRent Stabilized12 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: BENSON ASSOCIATES CO PARTNERSHIP · 13,552 sf lot · 3.88 FAR built · Flood zone X
Locations of Work
Structural
Basement1p · 1 filing · 7 docs
Sub-Basement1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROTH & COHEN REALTY LLC1503/22/2026
SAFETECH ENTERPRISES703/22/2026
BENSON ASSOCIATES CO PARTNERSHIP203/22/2026
BENSON ASSOCIATES503/22/2026
BENSEN ASSC CO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PVE ENGINEERING105/22/2025
ASR ENGINEERING PC105/11/2025
NEW YORK ENGINEERING ASSOC., P.C.311/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C603/21/2026
NORTHEAST EXPEDITING203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAFETECH ENTERPRISES CORPGeneral Contractor903/21/2026
SERVICE TECH MECH&PLBG INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASE ENGINEERING PLLC5785105/22/2025
NEW YORK ENGINEERING ASSO851311/27/2023
Building Lifecycle
All (94)Filed (5)Permit Issued (5)Signed Off (2)Violation (60)Inspection (3)Special Inspection (19)
10/29/2025
Violation issued (HPD, closed)
A
06/03/2025
Permit issued — Structural
B01224487-I1-GC-CX
05/22/2025
Filed — Alteration
PROPOSED EXTERIOR FACADE RESTORATION AND GARAGE REAPIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01224487-I1
05/16/2025
Special inspection requirement — Air barrier - visual inspection
Marco Batista
05/12/2025
Permit issued — Supported Scaffold
B01223843-I1-SF
05/12/2025
Permit issued — Supported Scaffold
B01223843-I1-SH
05/12/2025
Special inspection requirement — Post-installed Anchors
alon egozi
05/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
alon egozi
05/12/2025
Special inspection requirement — Masonry
alon egozi
05/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Marco Batista
05/12/2025
Special inspection requirement — Final
Marco Batista
05/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
alon egozi
05/11/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01223843-I1
10/31/2024
Violation issued (HPD, closed)
B
10/31/2024
Violation issued (HPD, closed)
B
10/31/2024
Violation issued (HPD, closed)
C
10/31/2024
Violation issued (HPD, closed)
C
10/31/2024
Violation issued (HPD, closed)
C
10/31/2024
Violation issued (HPD, closed)
B
10/31/2024
Violation issued (HPD, closed)
C
02/27/2024
Signed off — Alteration
REPLACE BOILER AND GAS/OIL BURNER.
B00882452-I1
02/27/2024
Signed off — Alteration
INSTALL HOT WATER HEATER AND GAS CONNECTION TO REPLACEMENT BURNER
B00882937-I1
01/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/27/2023
Filed — Alteration
REPLACE BOILER AND GAS/OIL BURNER.
B00882452-P1
11/27/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/27/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
11/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
11/27/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
11/27/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
11/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
11/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
11/27/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
11/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
11/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
11/27/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
11/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
11/27/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
06/28/2023
Permit issued — Boiler Equipment
B00882452-I1-BE
06/26/2023
Permit issued — Plumbing
B00882937-I1-PL
06/21/2023
Filed — Alteration
REPLACE BOILER AND GAS/OIL BURNER.
B00882452-I1
06/21/2023
Filed — Alteration
INSTALL HOT WATER HEATER AND GAS CONNECTION TO REPLACEMENT BURNER
B00882937-I1
06/07/2023
Violation issued (HPD, closed)
B
06/07/2023
Violation issued (HPD, closed)
A
06/07/2023
Violation issued (HPD, closed)
A
06/07/2023
Violation issued (HPD, closed)
B
06/07/2023
Violation issued (HPD, closed)
B
06/07/2023
Violation issued (HPD, closed)
C
04/08/2023
Violation issued (HPD, open)
B
03/08/2023
Violation issued (HPD, closed)
C
03/08/2023
Violation issued (HPD, closed)
C
03/08/2023
Violation issued (HPD, closed)
C
03/08/2023
Violation issued (HPD, closed)
A
03/08/2023
Violation issued (HPD, closed)
B
03/08/2023
Violation issued (HPD, closed)
C
03/08/2023
Violation issued (HPD, closed)
C
11/05/2022
Violation issued (HPD, open)
C
08/18/2021
Violation issued (HPD, closed)
B
08/18/2021
Violation issued (HPD, closed)
C
04/23/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSAFETECH ENTERPRISES CORP06/03/2025
DOB NOWSupported ScaffoldPermit IssuedSAFETECH ENTERPRISES CORP05/12/2025
DOB NOWSupported ScaffoldPermit IssuedSAFETECH ENTERPRISES CORP05/12/2025
DOB NOWBoiler EquipmentSigned-offSERVICE TECH MECH&PLBG IN06/28/2023
DOB NOWPlumbingSigned-offSERVICE TECH MECH&PLBG IN06/26/2023
BISFSISSUEDBETA MECHANICAL INC./BETTER ENER04/09/1996
1 project · most recent 05/13/2025
FiledStatusContractorScope
05/13/2025Permit IssuedRICHARD NEU—
1 project · most recent 05/22/2025
FiledStatusContractorScope
05/22/2025Permit IssuedSAFETECH ENTERPRISES CORP1 scope_items
1 project · most recent 05/11/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/11/2025Permit IssuedSAFETECH ENTERPRISES CORPScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/27/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
05/16/2025Air barrier - visual inspectionMarco Batistaenergy_progress
05/12/2025Post-installed Anchorsalon egozispecial
05/12/2025Structural Stability – Alterations of existing buildingsalon egozispecial
05/12/2025Masonryalon egozispecial
05/12/2025Energy Code Compliance InspectionsMarco Batistaprogress
05/12/2025FinalMarco Batistaprogress
05/12/2025Tenant Protection Plan Compliancealon egozispecial
11/27/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
11/27/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
11/27/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
11/27/2023Maintenance informationLOUIS ARENAenergy_progress
11/27/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
11/27/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
11/27/2023Heating SystemsLOUIS ARENAspecial
11/27/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
11/27/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
11/27/2023Maintenance informationLOUIS ARENAenergy_progress
11/27/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
11/27/2023Heating SystemsLOUIS ARENAspecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B00882452-P1Request digital key ↗
08/27/2026B00882452-I1Request digital key ↗
08/27/2026B00882937-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026B01223843-I1Open ↗
08/13/2026B01224487-I1Open ↗
08/13/2026B00882937-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026B00882452-I1Open ↗
09/01/2026B01224487-I1Open ↗
09/01/2026B01224487-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026B00882452-I1Open ↗
09/01/2026B01224487-I1Open ↗
08/28/2026B00882452-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026B00882937-I1Open ↗
08/13/2026B00882452-I1Open ↗
08/13/2026B00882452-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00882452-I1Open ↗