← Back
Primarily 2 family with 1 store or office
2229 65 STREET
BROOKLYN · BIN 3172268
💬 Discuss this project
1931Year Built
2Stories
S2Building Class
R6AZoning
2,800 sfGross Floor Area
3Units
Primarily 2 family with 1 store or office · 1,820 sf lot · 1.54 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction1 filing · 8 docs
CellarUnder Construction1p · 2 filings · 20 docs
1 job · most recent 09/11/2026
Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
09/11/2026——Air Conditioning Systems, Refrigeration Systems
Cooling
Gree ×2
Refrigeration
Embraco UFI12HBX1 5,300 BTU · Refrigeration Unit ×2
1 job · most recent 09/11/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/11/2026Permit IssuedAMERICAN STANDARD P&H CORGas, Water/Sanitary
3 jobs · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026Permit IssuedLAURI ELECTRICAL INCGeneral Wiring
10/22/2024CompleteA.C. MORGAN ELECTRICGeneral Wiring
05/08/2024CompleteERIC & NG ELEC'L, INC.4 meters, 1 new_meters
Building Lifecycle
All (40)Filed (5)Permit Issued (5)Signed Off (2)Inspection (4)Special Inspection (24)
09/16/2026
Permit issued — Plumbing
B01458295-S1-PL
09/11/2026
Filed — Alteration
RENOVATION OF PROPOSED RESTAURANT ON 1ST FLOOR WITH, RELOCATE/REPLACE PLUMBING FIXTURES AND COOKING EQUIPMENTS AS PER PLAN. TO SUPERSEDE DOB JOB#301056513. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01458295-I1
09/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
09/10/2026
Special inspection requirement — Energy Code Compliance Inspections
09/10/2026
Special inspection requirement — Final
Manuel Ramirez Lachica
09/10/2026
Special inspection requirement — Mechanical Systems
09/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/10/2026
Special inspection requirement — Interior lighting power
09/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/11/2025
Signed off — Alteration
REMOVE EXISTING (1) BOILERS AND INSTALL NEW (2) GAS BOILERS AT CELLAR. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01021893-S1
09/11/2025
Signed off — Alteration
REMOVE EXISTING (1) BOILERS AND INSTALL NEW (2) GAS BOILERS AT CELLAR. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01021893-I1
06/03/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/29/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
05/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jian Yang
05/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
05/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
05/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
05/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
05/29/2025
Special inspection requirement — Maintenance information
Jian Yang
05/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
05/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
05/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
05/20/2025
Special inspection requirement — Maintenance information
Jian Yang
05/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jian Yang
05/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
05/20/2025
Special inspection requirement — Heating Systems
Jian Yang
05/19/2025
Filed — Alteration
REMOVE EXISTING (1) BOILERS AND INSTALL NEW (2) GAS BOILERS AT CELLAR. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01021893-P2
05/14/2025
Filed — Alteration
REMOVE EXISTING (1) BOILERS AND INSTALL NEW (2) GAS BOILERS AT CELLAR. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01021893-P1
05/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/21/2025
Permit issued — Plumbing
B01021893-S1-PL
04/21/2025
Permit issued — Boiler Equipment
B01021893-I1-BE
04/17/2024
Permit issued — Plumbing
B01021893-S1-PL
04/17/2024
Permit issued — Boiler Equipment
B01021893-I1-BE
04/04/2024
Filed — Alteration
REMOVE EXISTING (1) BOILERS AND INSTALL NEW (2) GAS BOILERS AT CELLAR. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01021893-S1
04/04/2024
Filed — Alteration
REMOVE EXISTING (1) BOILERS AND INSTALL NEW (2) GAS BOILERS AT CELLAR. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01021893-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD DESIGN STUDIO1607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/03/2024$1.3M—Private party → Private party$448/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SELF EMPLOYEE109/11/2026
YANG ENGINEERING LLC405/19/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI STATE PLBG & HTG INCPlumbing407/08/2026
A.C. MORGAN ELECTRICElectrical103/22/2026
AMERICAN STANDARD P&H CORORP.Plumbing109/17/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376405/19/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.09/16/2026
DOB NOWPlumbingSigned-offDW PLUMBING INC04/21/2025
DOB NOWBoiler EquipmentSigned-offDW PLUMBING INC04/21/2025
DOB NOWPlumbingSigned-offDW PLUMBING INC04/17/2024
DOB NOWBoiler EquipmentSigned-offDW PLUMBING INC04/17/2024
BISOTISSUEDNIC DESIGN MGMT INC07/05/2017
BISFPISSUEDMASTER FIRE SYSTEMS, INC08/07/2000
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/29/2025Pass-Final Boiler Equipment InspectionPassView ↗
05/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
09/10/2026HVAC-R and service water heating equipment—energy_progress
09/10/2026Fire-Resistance Rated Construction—progress
09/10/2026Energy Code Compliance Inspections—progress
09/10/2026FinalManuel Ramirez Lachicaprogress
09/10/2026Mechanical Systems—special
09/10/2026Fire-Resistant Penetrations and Joints—special
09/10/2026Tenant Protection Plan Compliance—special
09/10/2026HVAC-R and service water piping design and insulation—energy_progress
09/10/2026Interior lighting power—energy_progress
09/10/2026HVAC-R and service water heating system controls—energy_progress
05/29/2025Fire-Resistant Penetrations and JointsJian Yangspecial
05/29/2025Tenant Protection Plan ComplianceJian Yangspecial
05/29/2025Energy Code Compliance InspectionsJian Yangprogress
05/29/2025HVAC-R and service water heating equipmentJian Yangenergy_progress
05/29/2025HVAC-R and service water heating system controlsJian Yangenergy_progress
05/29/2025HVAC-R and service water piping design and insulationJian Yangenergy_progress
05/29/2025Maintenance informationJian Yangenergy_progress
05/20/2025HVAC-R and service water piping design and insulationJian Yangenergy_progress
05/20/2025HVAC-R and service water heating system controlsJian Yangenergy_progress
05/20/2025HVAC-R and service water heating equipmentJian Yangenergy_progress
05/20/2025Maintenance informationJian Yangenergy_progress
05/20/2025Tenant Protection Plan ComplianceJian Yangspecial
05/20/2025Fire-Resistant Penetrations and JointsJian Yangspecial
05/20/2025Heating SystemsJian Yangspecial
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/23/2026B01458295-I1Request digital key ↗
09/23/2026B01458295-S1Request digital key ↗
08/25/2026B01021893-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
10/17/2023321612475Open ↗
09/12/2023321612475Open ↗
09/11/2023321612475Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
07/10/2017321612475Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/18/2026B01458295-I1Open ↗
09/18/2026B01458295-S1Open ↗
08/25/2026B01021893-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026B01458295-S1Open ↗
09/23/2026B01458295-I1Open ↗
09/23/2026B01021893-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026B01021893-I1Open ↗
08/27/2026B01021893-S1Open ↗
▸BISProfessional and Owner Certification (POC3)1
07/10/2017321612475Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/10/2017321612475Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/10/2017321612475Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
07/10/2017321612475Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/18/2026B01458295-I1Open ↗
09/18/2026B01458295-S1Open ↗
08/25/2026B01021893-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/10/2017321612475Open ↗
▸Energy Compliance5
▸BISINTERIOR LIGHTING POWER1
10/27/2023321612475Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/27/2023321612475Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/27/2023321612475Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/27/2023321612475Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/10/2017321612475Open ↗
▸Inspections & Test Reports2
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/27/2023321612475Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/27/2023321612475Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/30/2023321612475Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
07/10/2017321612475Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/27/2023321612475Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
10/17/2023321612475Open ↗
▸BISEFILING COVER SHEET1
07/17/2017321612475Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/30/2023321612475Open ↗