ECB10/22/2022At time of inspection on a closed and permitted job site, i observed that the permit holder failed to comply with code as inadequate construction housekeeping was seen on site at expos #1 and #4 which was consi$6K due
ECB03/14/2022BC3301.1.2 FC1403.3 failure to comply w/FDNY fire code ato my insp on active jobsite,i observed gas operated space heater in backrm@EXP3 on 1FL level.when asked if FDNY permit was available onsite,none was prov$2K due
ECB03/14/2022Protection of sides of excavation (missing) ato my insp i observed excavated site@EXP4 >5' in depth w/no sheathing or supports along excavated walls.no sheathing or supports creates safety hazard condition of c$5K due
ECB03/14/2022Failure to institute/maintain safety equipment measures or temp const-no handrails ato my insp on active jobsite,i observed that permit holder failed to provide as per code handrails on staircase of 1-2FL level$2K due
ECB03/14/2022BC3303.14.1 protection of foundations (standing water) ato my insp,i observed that permit holder failed to comply w/code as accumulation of 2" of water was seen in cellar level which was frozen as watermain@exp$1K due
ECB03/14/2022Failure to maintain adequate housekeeping per sec requirements.ato my insp on active jobsite,i observed that permit holder failed to maintain adequate housekeeping seen in cellar level&frontyd of EXP1.pile of d$1K due
ECB03/14/2022Failure to designate &or have const super present@site as required.atomy insp on active&permitted jobsite,i observed 1WORKER engaged in const activities in excavated area@EXP4.upon request for site's super or c$10K due
ECB03/14/2022BC3303.7.2 fire extinguishers (missing) ato my insp on active&permitted jobsite,i observed that no fire extinguishers were provided onsite as bldg was insp from cellar to 2FL level.failure to comply creates saf$2K due
ECB03/14/2022Failure to maintain/display onsite docs required by BCCH33.ato my inspon active&permitted jobsite,i observed that permit holder failed to maintain&display required docs onsite as required upon request such as s$2K due
ECB03/14/2022BC3301.2 safety measures&standards (no ohp provided) ato my insp on active&permitted jobsite,i observed that permit holder failed to provideany overhead protection for ongoing work of exterior@EXP2 as required$2K due
ECB03/14/2022Failure to ensure each worker has successfully completed required training.ato my insp on active jobsite,permit holder failed to ensure eachworker working/engaged@site has successfully completed required traini$5K due
ECB03/14/2022Failure to ensure worker has successfully completed required training.ato my insp on active jobsite,owner failed to ensure each worker engaged@site has successfully completed required training under BC3321.1&haNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 3,000 sf lot · 0.47 FAR built · Flood zone X