← Back
BuildNYC
Two family converted from one family
223-03 134TH ROAD
QUEENS · Laurelton · BIN 4281410
💬 Discuss this project
1945Year Built
2Stories
B3Building Class
R3AZoning
2,896 sfGross Floor Area
2Units
3 Active Violations ▸FDNY Report ↗
Two family converted from one family · 5,220 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofVertical and Horizontal Enlargement. Conversion to Two-famil6p · 1 filing · 20 docs
Floor 2Vertical and Horizontal Enlargement. Conversion to Two-famil27p · 1 filing · 20 docs
Floor 1Vertical and Horizontal Enlargement. Conversion to Two-famil34p · 1 filing · 20 docs
CellarVertical and Horizontal Enlargement. Conversion to Two-famil33p · 1 filing · 20 docs
Site & exteriorVertical and Horizontal Enlargement. Conversion to Two-famil34p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Parkside Realty Group2407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/06/2023$1.3M—RED DOOR REALTY GROUP LLC → Private party$444/sf building
07/15/2021$540K—Private party → RED DOOR REALTY GROUP LLC$186/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL Engineering602/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metro Design1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hayden Brown ConstructionGeneral Contractor907/08/2026
Hayden Brown ConstructionScaffold107/08/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781402/22/2022
Building Lifecycle
All (71)Filed (6)Permit Issued (7)Signed Off (3)Violation (4)Inspection (7)Objection (14)Special Inspection (30)
04/01/2026
Violation issued (ECB, closed)
Construction
04/01/2026
Violation issued (ECB, open)
Construction
04/01/2026
Violation issued (ECB, open)
Zoning
04/01/2026
Violation issued (ECB, open)
Construction
11/15/2022
Signed off — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT CO APPLICATION Q00559609-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00559609-S3
11/15/2022
Signed off — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT CO APPLICATION Q00559609-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00559609-S2
11/05/2022
Signed off — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT CO APPLICATION Q00559609-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00559609-S1
04/20/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/15/2022
Permit issued — Curb Cut
Q00559609-S2-CC
04/14/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/04/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/31/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
03/31/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
03/31/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
03/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
03/31/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
03/31/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
03/31/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
03/29/2022
Objection resolved — Addressed
03/23/2022
Objection resolved — Addressed
03/11/2022
Objection resolved — Addressed
03/09/2022
Objection resolved — Addressed
03/02/2022
Objection raised — Zoning
03/02/2022
Objection raised — Zoning
03/02/2022
Objection raised — Other
02/24/2022
Objection raised — Scope
02/22/2022
Filed — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT CO APPLICATION Q00559609-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00559609-P2
02/21/2022
Filed — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT CO APPLICATION Q00559609-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00559609-P1
02/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/21/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
02/21/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
02/21/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
02/21/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
02/21/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
02/21/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — Final
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — Electric vehicle service equipment requirements
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — Metering
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
02/18/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
11/17/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/17/2021
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/17/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/17/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/12/2021
Permit issued — Plumbing
Q00559609-S3-PL
10/12/2021
Permit issued — General Construction
Q00559609-I1-FO-EA
10/12/2021
Permit issued — Earth Work
Q00559609-I1-MS
10/12/2021
Permit issued — Earth Work
Q00559609-I1-ST
10/04/2021
Permit issued — Structural
Q00559609-I1-GC
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offHayden Brown Cons04/15/2022
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing10/12/2021
DOB NOWGeneral ConstructionSigned-offHayden Brown Cons10/12/2021
DOB NOWEarth WorkSigned-offHayden Brown Cons10/12/2021
DOB NOWEarth WorkSigned-offHayden Brown Cons10/12/2021
DOB NOWStructuralPermit IssuedHayden Brown Cons10/04/2021
DOB NOWConstruction FenceSigned-offHayden Brown Cons10/04/2021
1 project · most recent 02/22/2022
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/22/2022Signed-offHayden Brown ConsVentilation Systems
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×10
Delta Breeze SMT150 150 CFM · Exhaust Fan ×4
1 project · most recent 02/22/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/22/2022Signed-offInfiniti Esc PlumbingGas, Storm, Water/Sanitary
1 project · most recent 10/07/2021
FiledStatusContractorScope
10/07/2021CompletePower Surge Electric3 meters, 3 new_meters
1 project · most recent 02/22/2022
Steel Wood
FiledStatusContractorScope
02/22/2022Signed-offHayden Brown ConsSteel, Wood
1 project · most recent 02/22/2022
Fence
FiledStatusContractorScope
02/22/2022Signed-offHayden Brown ConsFence
1 project · most recent 02/22/2022
Earthwork
FiledStatusContractorScope
02/22/2022Signed-offHayden Brown ConsEarthwork
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/20/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
04/14/2022Pass-Final CND-Occupancy InspectionPassView ↗
04/04/2022Pass-Final CND-Occupancy InspectionPassView ↗
11/17/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/17/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/17/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/17/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
03/31/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
03/31/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
03/31/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
03/31/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
03/31/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
03/31/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
03/31/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
02/21/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
02/21/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
02/21/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
02/21/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/21/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
02/21/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
02/21/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
02/18/2022FinalCHRISTIAN LOZADAprogress
02/18/2022Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
02/18/2022Footing and FoundationCHRISTIAN LOZADAprogress
02/18/2022Structural Wood FrameCHRISTIAN LOZADAprogress
02/18/2022Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
02/18/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
02/18/2022Interior lighting powerCHRISTIAN LOZADAenergy_progress
02/18/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
02/18/2022Electric vehicle service equipment requirementsCHRISTIAN LOZADAenergy_progress
02/18/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
02/18/2022Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
Latest 25 of 45.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00559609-S3Request digital key ↗
08/26/2026Q00559609-S1Request digital key ↗
08/15/2026Q00559609-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00559609-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00559609-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026Q00559609-S3Open ↗
08/13/2026Q00559609-P2Open ↗
08/13/2026Q00559609-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026Q00559609-P1Open ↗
09/23/2026Q00559609-P1Open ↗
08/31/2026Q00559609-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026Q00559609-P1Open ↗
09/23/2026Q00559609-P1Open ↗
08/31/2026Q00559609-S3Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00559609-P1Open ↗
08/13/2026Q00559609-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00559609-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00559609-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00559609-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026Q00559609-I1Open ↗
08/13/2026Q00559609-P2Open ↗
08/13/2026Q00559609-S3Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00559609-S3Open ↗
08/13/2026Q00559609-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q00559609-I1Open ↗
08/13/2026Q00559609-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00559609-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00559609-I1Open ↗
▸Other Documents7
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00559609-P1Open ↗
08/13/2026Q00559609-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00559609-P1Open ↗
08/13/2026Q00559609-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00559609-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00559609-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q00559609-P2Open ↗