← Back
One family attached or semi-detached
223-10 LINDEN BOULEVARD
QUEENS · Cambria Heights · BIN 4274458
💬 Discuss this project
1960Year Built
2Stories
A5Building Class
R3-2Zoning
1,248 sfGross Floor Area
1Units
One family attached or semi-detached · 2,642 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/01/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/01/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
04/06/2026
Permit issued — Solar
Q01372454-I1-SL
04/01/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01372454-I1
04/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/01/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/16/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC04/06/2026
1 project · most recent 04/01/2026
General Wiring
FiledStatusContractorScope
04/01/2026CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
1 project · most recent 04/01/2026
FiledStatusContractorScope
04/01/2026Signed-offSUNRUN INSTALLATION SVC9 panels, 4.05 kw, 189.2 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/01/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/01/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
03/16/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/16/2026Energy Code Compliance InspectionsWalid Abdullaprogress
03/16/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/29/2026Q01372454-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q01372454-I1Open ↗
09/01/2026Q01372454-I1Open ↗
09/01/2026Q01372454-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q01372454-I1Open ↗
09/01/2026Q01372454-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/29/2026Q01372454-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/29/2026Q01372454-I1Open ↗