← Back
Two family converted from one family
223-15 134 ROAD
QUEENS · Laurelton · BIN 4281408
💬 Discuss this project
1950Year Built
2Stories
B3Building Class
R3AZoning
1,820 sfGross Floor Area
2Units
Two family converted from one family · 4,500 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR112/27/2023
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281112/27/2023
Building Lifecycle
All (12)Filed (1)Permit Issued (1)Signed Off (1)Objection (4)Special Inspection (5)
02/10/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Grid tied, Railed, 16 Panels, 6.4 KW
Q00981072-I1
01/23/2024
Permit issued — Solar
Q00981072-I1-SL
01/15/2024
Objection resolved — Addressed
01/15/2024
Objection resolved — Addressed
01/09/2024
Objection raised — Zoning
01/09/2024
Objection raised — Other
12/27/2023
Filed — Alteration
Installation of solar panels; Rooftop, Grid tied, Railed, 16 Panels, 6.4 KW
Q00981072-I1
12/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
12/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
12/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
12/21/2023
Special inspection requirement — Final
Mina Makar
12/21/2023
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR01/23/2024
1 project · most recent 12/26/2023
FiledStatusContractorScope
12/26/2023CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/21/2023Fire-Resistant Penetrations and JointsMina Makarspecial
12/21/2023Structural Stability – Alterations of existing buildingsMina Makarspecial
12/21/2023Energy Code Compliance InspectionsMina Makarprogress
12/21/2023FinalMina Makarprogress
12/21/2023Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026Q00981072-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026Q00981072-I1Open ↗
08/24/2026Q00981072-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026Q00981072-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026Q00981072-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026Q00981072-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00981072-I1Open ↗