← Back
Two stories - detached, small or mid-size
223-18 114 AVENUE
QUEENS · Cambria Heights · BIN 4242451
💬 Discuss this project
1960Year Built
2Stories
A1Building Class
R2AZoning
1,564 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR112/12/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281112/12/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
02/24/2026
Signed off — Alteration
installation of solar panels, rooftop, railed, grid-tied, 14 modules, 5.74 KW
Q01333075-I1
12/16/2025
Permit issued — Solar
Q01333075-I1-SL
12/12/2025
Filed — Alteration
installation of solar panels, rooftop, railed, grid-tied, 14 modules, 5.74 KW
Q01333075-I1
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
12/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
12/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
12/12/2025
Special inspection requirement — Final
Mina Makar
12/12/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR12/16/2025
BISPLISSUEDLLOYD G DRUMMOND PLBG&GEN10/29/2004
2 projects · most recent 12/12/2025
FiledStatusContractorScope
12/12/2025CompleteISLAND ELECTRIC CORP—
03/26/2024Permit IssuedBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/12/2025Fire-Resistant Penetrations and JointsMina Makarspecial
12/12/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
12/12/2025Energy Code Compliance InspectionsMina Makarprogress
12/12/2025FinalMina Makarprogress
12/12/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026Q01333075-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026Q01333075-I1Open ↗
08/23/2026Q01333075-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026Q01333075-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01333075-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01333075-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01333075-I1Open ↗