← Back
Garage, residential, tax class 1
223 WAVERLY AVENUE
BROOKLYN · BIN 3055055
💬 Discuss this project
1970Year Built
1Stories
G0Building Class
R6BZoning
0 sfGross Floor Area
1Units
4 Open Violations ▸FDNY Report ↗
Garage, residential, tax class 1 · Owner of record: 221-223 WAVERLY AVENUE ASSOCIATES LLC · 1,875 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction94p · 1 filing · 20 docs
Floor 4Under Construction92p · 1 filing · 20 docs
Floor 3Under Construction97p · 1 filing · 20 docs
Floor 2Under Construction92p · 1 filing · 20 docs
Floor 1Under Construction97p · 1 filing · 20 docs
CellarUnder Construction94p · 1 filing · 20 docs
1 job · most recent 04/03/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/03/2026Permit IssuedUNITED FIVE CONSTRUCTIONHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXTA36AAVJU 40,000 BTU · Vrf Outdoor ×2
RXTA48AAVJU 48,000 BTU · Vrf Outdoor ×2
Ventilation
Greenheck SQ-97-VG 175 CFM · Exhaust Fan ×2
BCF-106-4 500 CFM · Exhaust Fan ×1
1 job · most recent 04/03/2026
Storm Water/Sanitary
FiledStatusContractorScope
04/03/2026Permit IssuedRRP PLUMBING CORPStorm, Water/Sanitary
3 jobs · most recent 09/18/2026
General Wiring
FiledStatusContractorScope
09/18/2026Permit IssuedJOSEPH WEINSTEIN ELECTRIC—
07/17/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
07/02/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
1 job · most recent 04/03/2026
Steel Concrete Masonry
FiledStatusContractorScope
04/03/2026Permit IssuedUNITED FIVE CONSTRUCTIONSteel, Concrete, Masonry
2 jobs · most recent 07/21/2026
Scaffold Fence
FiledStatusContractorScope
07/21/2026Permit IssuedTITAN SERVICES USA INCScaffold
04/03/2026Permit IssuedUNITED FIVE CONSTRUCTIONFence
Building Lifecycle
All (97)Filed (15)Permit Issued (13)Violation (6)Inspection (3)Objection (30)Special Inspection (30)
08/28/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/05/2026
Inspection — Fail-Final SD - Fire Pump
Fail
View inspection ↗
07/22/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/21/2026
Filed — Alteration
B01433960-I1
07/21/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01433975-I1
07/21/2026
Permit issued — Sidewalk Shed
B01433960-I1-SH
07/21/2026
Permit issued — Supported Scaffold
B01433975-I1-SF
05/20/2026
Permit issued — General Construction
B01078929-I1-GC
05/19/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/19/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/19/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/19/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/19/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/18/2026
Permit issued — Mechanical Systems
B01078929-S1-MS
05/15/2026
Permit issued — Construction Fence
B01078929-S8-FN
05/15/2026
Permit issued — Structural
B01078929-S4-ST
05/15/2026
Permit issued — Foundation
B01078929-S5-FO
04/21/2026
Objection resolved — Addressed
04/21/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
04/09/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
04/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
04/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
04/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
04/09/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
04/09/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SHAHRIAR QUAYYUM
04/03/2026
Filed — New Building
Install new plumbing fixtures as per plan filed in conjunction with NB # B01078929-I1.
B01078929-P3
04/03/2026
Filed — New Building
Install new plumbing fixtures as per plan filed in conjunction with NB # B01078929-I1.
B01078929-P4
03/24/2026
Objection raised — Energy
03/18/2026
Filed — New Building
Install new plumbing fixtures as per plan filed in conjunction with NB # B01078929-I1.
B01078929-P2
03/04/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
03/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
03/04/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
03/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
03/04/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
SHAHRIAR QUAYYUM
03/04/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
03/04/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
03/04/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
03/04/2026
Special inspection requirement — Shutoff dampers
SHAHRIAR QUAYYUM
03/04/2026
Special inspection requirement — Mechanical Systems
SHAHRIAR QUAYYUM
03/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
03/04/2026
Special inspection requirement — Duct leakage testing, insulation and design
SHAHRIAR QUAYYUM
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
12/31/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
12/31/2025
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
12/31/2025
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
12/31/2025
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
12/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
12/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
12/31/2025
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
12/26/2025
Filed — New Building
Install new plumbing fixtures as per plan filed in conjunction with NB # B01078929-I1.
B01078929-P1
12/17/2025
Permit issued — General Construction
B01078929-I1-GC
11/13/2025
Permit issued — Foundation
B01078929-S5-FO
11/12/2025
Permit issued — Structural
B01078929-S4-ST
10/31/2025
Permit issued — Mechanical Systems
B01078929-S1-MS
10/02/2025
Permit issued — Plumbing
B01078929-S2-PL
08/25/2025
Objection resolved — Addressed
07/03/2025
Objection resolved — Addressed
Latest 60 of 97 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TITAN SERVICES USA409/13/2026
LE CAPITAL NYC2407/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H BUILDING MANAGEMENT INCGeneral Contractor507/08/2026
UNITED FIVE CONSTRUCTIONGeneral Contractor507/08/2026
TITAN SERVICES USA INCGeneral Contractor207/22/2026
RRP PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161104/03/2026
ENTHINK ENGINEERS LLC6247204/09/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedTITAN SERVICES USA INC07/21/2026
DOB NOWSupported ScaffoldPermit IssuedTITAN SERVICES USA INC07/21/2026
DOB NOWGeneral ConstructionPermit IssuedUNITED FIVE CONSTRUCTION05/20/2026
DOB NOWMechanical SystemsPermit IssuedUNITED FIVE CONSTRUCTION05/18/2026
DOB NOWConstruction FencePermit IssuedUNITED FIVE CONSTRUCTION05/15/2026
DOB NOWStructuralPermit IssuedUNITED FIVE CONSTRUCTION05/15/2026
DOB NOWFoundationPermit IssuedUNITED FIVE CONSTRUCTION05/15/2026
DOB NOWGeneral ConstructionPermit IssuedH BUILDING MANAGEMENT INC12/17/2025
DOB NOWFoundationPermit IssuedH BUILDING MANAGEMENT INC11/13/2025
DOB NOWStructuralPermit IssuedH BUILDING MANAGEMENT INC11/12/2025
DOB NOWMechanical SystemsPermit IssuedH BUILDING MANAGEMENT INC10/31/2025
DOB NOWPlumbingPermit IssuedRRP PLUMBING CORP10/02/2025
DOB NOWConstruction FencePermit IssuedH BUILDING MANAGEMENT INC05/27/2025
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/28/2026Pass-Final PL - UndergroundPassView ↗
08/05/2026Fail-Final SD - Fire PumpFailView ↗
07/22/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
04/21/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
04/21/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
04/09/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
04/09/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
04/09/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
04/09/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSHAHRIAR QUAYYUMspecial
04/09/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
04/09/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
04/09/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
03/04/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
03/04/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
03/04/2026FinalSHAHRIAR QUAYYUMprogress
03/04/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
03/04/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
03/04/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
03/04/2026Duct leakage testing, insulation and designSHAHRIAR QUAYYUMenergy_progress
03/04/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
03/04/2026Shutoff dampersSHAHRIAR QUAYYUMenergy_progress
03/04/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
03/04/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
03/04/2026Exhaust and Vent Systems in Plenums and DuctsSHAHRIAR QUAYYUMspecial
03/04/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
03/04/2026Mechanical SystemsSHAHRIAR QUAYYUMspecial
12/31/2025Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
12/31/2025Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
Latest 25 of 70.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/17/2026B01078929-S8Request digital key ↗
08/17/2026B01078929-S1Request digital key ↗
08/17/2026B01078929-P3Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit10
08/15/2026B01078929-I1Open ↗
08/13/2026B01078929-S7Open ↗
08/13/2026B01078929-P2Open ↗
Showing 3 of 10 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
05/06/2025340917716Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026B01078929-I1Open ↗
08/13/2026B01078929-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/15/2026B01078929-I1Open ↗
08/13/2026B01078929-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026B01078929-I1Open ↗
08/13/2026B01078929-P1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/17/2026B01078929-I1Open ↗
08/17/2026B01078929-P3Open ↗
08/17/2026B01078929-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026B01078929-P2Open ↗
09/23/2026B01078929-P2Open ↗
09/01/2026B01078929-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026B01078929-P2Open ↗
09/01/2026B01078929-I1Open ↗
09/01/2026B01078929-S7Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/06/2025340917716Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/15/2026B01078929-I1Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist2
08/17/2026B01078929-P1Open ↗
08/15/2026B01078929-I1Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/06/2025340917716Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/06/2025340917716Open ↗
▸BISSTREET TREE CHECKLIST1
05/06/2025340917716Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026B01078929-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026B01078929-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLANDMARKS APPROVAL1
10/21/2025340917716Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
05/06/2025340917716Open ↗
▸BISADDITIONAL INFORMATION1
10/21/2025340917716Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/06/2025340917716Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/15/2026B01078929-I1Open ↗
08/13/2026B01078929-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026B01078929-I1Open ↗
08/13/2026B01078929-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026B01078929-P1Open ↗
08/15/2026B01078929-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
05/06/2025340917716Open ↗