← Back
Three families
2236 82 STREET
BROOKLYN · BIN 3164789
💬 Discuss this project
1910Year Built
2.75Stories
C0Building Class
R5Zoning
3,284 sfGross Floor Area
3Units
Rent Stabilized11 Open Violations ▸FDNY Report ↗
Three families · 3,000 sf lot · 1.09 FAR built · Flood zone X500
Locations of Work
Plumbing
Floor 31p · 1 filing · 13 docs
Floor 22p · 1 filing · 13 docs
Floor 11p · 1 filing · 13 docs
Cellar2p · 1 filing · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/12/2021$1.2M—Private party → Private party$381/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT108/15/2025
CL ENGINEERING P.C.206/29/2021
J&R DESIGN AND INSPECTION CORP.103/31/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH QUALITY 338803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN STANDARD P&H CORORP.Plumbing607/08/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor407/08/2026
JEFFREY YOUNGElectrical203/21/2026
Y ELECTRIC INC 005083General Contractor203/22/2026
SO PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637306/29/2021
Building Lifecycle
All (45)Filed (4)Permit Issued (5)Signed Off (3)Violation (12)Special Inspection (21)
05/01/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
10/14/2025
Signed off — Alteration
EXTERIOR CONSTRUCTION WORK AT FRONT PORCH OF EXISTING RESIDENTIAL BUILDING TO REMOVE BRICK VENEER/BRICK COLUMN ENCLOSURE AND REPLACE IN KIND AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01265511-I1
08/20/2025
Permit issued — General Construction
B01265511-I1-GC
08/15/2025
Filed — Alteration
EXTERIOR CONSTRUCTION WORK AT FRONT PORCH OF EXISTING RESIDENTIAL BUILDING TO REMOVE BRICK VENEER/BRICK COLUMN ENCLOSURE AND REPLACE IN KIND AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01265511-I1
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
08/02/2025
Special inspection requirement — Final
Chun Feng
06/06/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, open)
I
04/08/2024
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, open)
I
03/21/2023
Violation issued (HPD, open)
A
11/09/2022
Violation issued (HPD, open)
I
02/22/2022
Violation issued (HPD, open)
A
02/22/2022
Violation issued (HPD, open)
I
12/09/2021
Signed off — Alteration
GENERAL RENOVATION OF 3-FAMILY BUILDING WITH REMOVING PARTITION, REPAIRING CEILING, REPLACING WINDOWS, NEW PARTITION, FLOOR TILES DOORS AND PAINTING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00494082-I1
10/20/2021
Signed off — Alteration
B00496337-I1
07/02/2021
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
07/02/2021
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
07/02/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
07/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
07/02/2021
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
06/29/2021
Filed — Alteration
B00496337-P1
06/25/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
06/25/2021
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
06/25/2021
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
06/25/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
06/25/2021
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
06/15/2021
Permit issued — Plumbing
B00496337-I1-PL
05/06/2021
Permit issued — General Construction
B00494082-I1-GC
04/07/2021
Violation issued (HPD, open)
A
04/06/2021
Permit issued — Plumbing
B00496337-I1-PL
04/05/2021
Permit issued — General Construction
B00494082-I1-GC
04/01/2021
Filed — Alteration
B00496337-I1
03/31/2021
Filed — Alteration
GENERAL RENOVATION OF 3-FAMILY BUILDING WITH REMOVING PARTITION, REPAIRING CEILING, REPLACING WINDOWS, NEW PARTITION, FLOOR TILES DOORS AND PAINTING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00494082-I1
03/31/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
03/31/2021
Special inspection requirement — Fire-Resistance Rated Construction
Robert Truskosky
03/31/2021
Special inspection requirement — Fenestration areas
Robert Truskosky
03/31/2021
Special inspection requirement — Air barrier - visual inspection
Robert Truskosky
03/31/2021
Special inspection requirement — Interior lighting power
Robert Truskosky
03/31/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Robert Truskosky
03/31/2021
Special inspection requirement — Fenestration air leakage
Robert Truskosky
03/31/2021
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
03/27/2021
Special inspection requirement — Final
Robert Truskosky
11/03/2016
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION08/20/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.06/15/2021
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION05/06/2021
DOB NOWPlumbingSigned-offNICHOLAS SUIDA04/06/2021
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION04/05/2021
1 project · most recent 11/08/2021
General Wiring
FiledStatusContractorScope
11/08/2021CompleteY ELECTRIC INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
08/05/2025Energy Code Compliance InspectionsChun Fengprogress
08/02/2025FinalChun Fengprogress
07/02/2021HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
07/02/2021HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
07/02/2021HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
07/02/2021Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
07/02/2021Energy Code Compliance InspectionsRobert Truskoskyprogress
06/25/2021Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
06/25/2021Energy Code Compliance InspectionsRobert Truskoskyprogress
06/25/2021HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
06/25/2021HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
06/25/2021HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
03/31/2021Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
03/31/2021Fire-Resistance Rated ConstructionRobert Truskoskyprogress
03/31/2021Fenestration areasRobert Truskoskyenergy_progress
03/31/2021Air barrier - visual inspectionRobert Truskoskyenergy_progress
03/31/2021Interior lighting powerRobert Truskoskyenergy_progress
03/31/2021Fenestration and door U-factor and product ratingsRobert Truskoskyenergy_progress
03/31/2021Fenestration air leakageRobert Truskoskyenergy_progress
03/31/2021Energy Code Compliance InspectionsRobert Truskoskyprogress
03/27/2021FinalRobert Truskoskyprogress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00494082-I1Request digital key ↗
09/01/2026B00496337-P1Request digital key ↗
09/01/2026B00496337-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature13
09/27/2026B00494082-I1Open ↗
09/27/2026B00494082-I1Open ↗
09/27/2026B00494082-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00494082-I1Open ↗
09/01/2026B00496337-I1Open ↗
09/01/2026B00496337-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/27/2026B00494082-I1Open ↗
08/31/2026B00496337-P1Open ↗
08/29/2026B00496337-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00494082-I1Open ↗
09/01/2026B00496337-P1Open ↗
09/01/2026B00496337-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00494082-I1Open ↗
08/13/2026B00496337-I1Open ↗