2236 GLEASON AVENUE
BRONX · Castle Hill-Unionport · BIN 2026786
💬 Discuss this project
1916Year Built
2Stories
A1Building Class
R5Zoning
1,040 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,575 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 11p · 2 filings · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NMI ARCHITECTURE, PLLC201/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MIGLIORE RESTORATION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MIGLIORE RESTORATION INCGeneral Contractor107/08/2026
INNOVATION PLUMBING LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NMI ARCHITECTURE, PLLC6825201/25/2023
Building Lifecycle
All (20)Filed (2)Permit Issued (2)Signed Off (2)Inspection (6)Objection (2)Special Inspection (6)
11/14/2023
Signed off — Alteration
FILING THIS APPLICATION FOR MINOR PLUMBING WORK IN CONJUNCTION WITH ALT-2 APPLICATION # X07998925, NO CHANGE OF USE, EGRESS OR OCCUPANCY
X00809970-I1
06/29/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/20/2023
Signed off — Alteration
FILING THIS APPLICATION FOR MINOR COSMETIC REPAIR TO THE EXISTING ONE FAMILY DWELLING AFTER FIRE DAMAGE AND SMOKE DAMAGE AT REAR SIDE OF THE 1ST FLOOR, NO CHANGE IN BULK, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X07998925-I1
06/15/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/13/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/21/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/08/2023
Permit issued — Plumbing
X00809970-I1-PL
01/25/2023
Filed — Alteration
FILING THIS APPLICATION FOR MINOR PLUMBING WORK IN CONJUNCTION WITH ALT-2 APPLICATION # X07998925, NO CHANGE OF USE, EGRESS OR OCCUPANCY
X00809970-I1
01/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
01/13/2023
Permit issued — General Construction
X07998925-I1-GC
12/21/2022
Objection raised — Scope
12/21/2022
Objection resolved — Addressed
12/20/2022
Filed — Alteration
FILING THIS APPLICATION FOR MINOR COSMETIC REPAIR TO THE EXISTING ONE FAMILY DWELLING AFTER FIRE DAMAGE AND SMOKE DAMAGE AT REAR SIDE OF THE 1ST FLOOR, NO CHANGE IN BULK, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X07998925-I1
12/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
12/16/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
NASHAT IBRAHIM
12/16/2022
Special inspection requirement — Insulation placement and R values
NASHAT IBRAHIM
12/16/2022
Special inspection requirement — Fenestration air leakage
NASHAT IBRAHIM
12/16/2022
Special inspection requirement — Fenestration areas
NASHAT IBRAHIM
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINNOVATION PLUMBING LLC02/08/2023
DOB NOWGeneral ConstructionSigned-offMIGLIORE RESTORATION INC01/13/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/29/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/15/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/21/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/25/2023Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
12/16/2022Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
12/16/2022Fenestration and door U-factor and product ratingsNASHAT IBRAHIMenergy_progress
12/16/2022Insulation placement and R valuesNASHAT IBRAHIMenergy_progress
12/16/2022Fenestration air leakageNASHAT IBRAHIMenergy_progress
12/16/2022Fenestration areasNASHAT IBRAHIMenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026X00809970-I1Request digital key ↗
08/14/2026X07998925-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/22/2026X07998925-I1Open ↗
08/22/2026X07998925-I1Open ↗
08/22/2026X07998925-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026X07998925-I1Open ↗
08/13/2026X00809970-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026X00809970-I1Open ↗
08/22/2026X07998925-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X00809970-I1Open ↗
08/13/2026X07998925-I1Open ↗