ECB02/12/2025At the time of my inspection i observed the barriers at street level at exposure 1 were non confirming to the manufacturer's specifications as require, barriers were not connected to each other and were not fil$6K due
ECB02/12/2025Bc 3307.2.1 failure to comply with DOT regulations as per 34 rcny 2- 05. At the time of my inspection i observed barriers placed at street level at exposure 1. Upon review of departmental records no permit$10K due
ECB09/28/2020Bc 3307.2.1(2014 code) failure to comply w/ DOT regulations as per 34RCNY2-05 and admin code provisions 19-107,19-108 or 19-121(dumpster permit). Note:at time of my inspection of a 3 story building under demoli$1K due
ECB02/28/2024Failure to provide means and methods by pe for concrete repairs.as noted:at time of inspection at an active jobsite for a proposed 8 story building concrete cast-in place already at the bulkhead level.observedNothing owed — awaiting certificate of correction
ECB02/28/2024Failure to institute safety equipment measure or temporary construction no guardrails.as noted:at time of inspection at an active jobsite for a proposed 8 story building concrete cast-in place already at the buNothing owed — awaiting certificate of correction
ECB02/28/202428-103.8 failure to maintain embeded safety straps installation inspection logbook onsite.as noted:at time of inspection on an active jobsite for a proposed 8 story building concrete cast-in place.observed concNothing owed — awaiting certificate of correction
ECB01/27/2023Observed the construction fence on the perimeter of the lot, doing further inspection notice the following condition 1) view panel on the fence missing non-frangible acrylic paneling or equivalent material bc 3Nothing owed — awaiting certificate of correction
ECB01/11/2023Posting of unlawful signs,information,pictoral representation business or advertising messages on protective structures.as noted:at time of inspection of permitted site observed at exp #1 on construction fenceNothing owed — awaiting certificate of correction
ECB11/22/2021Work without permit. Device 3P3110 was removed without permit being obtained and application being filed. Remedy; file application and obtain permit for work and schedule test appointment with nycdob.Nothing owed — awaiting certificate of correction
ECB05/28/2021Protect information panel content.note:at the time of inspection i observed that protect information panel was missing protect information panels active operation the foundation information:1 elevation drawingNothing owed — awaiting certificate of correction
ECB02/12/2021BC3301.13.1 failure to provide site safety plan as required.note:@timeof my insp of 3STYBLDG@2FL level under const.upon request for site safety plan unable to provide as required.competent person onsite statedNothing owed — awaiting certificate of correction
ECB02/09/2021Failure to post or properly post permit for work at premises.noted:at time of inspection,no permit posted for related job #1300437550-17-el expiration date 10/19/2021.remedy:post/properly post permit.Nothing owed — awaiting certificate of correction
ECB02/09/2021Pedestrian protection does not meet code specifications.noted:at time of inspection,lights for sidewalk shed(3) all out. Remedy: comply to code specifications.Nothing owed — awaiting certificate of correction
ECB02/09/2021Job site fence not constructed or maintained pursuant to subsection. Noted:at time of inspection,construction fence at exposure(1)front of property has no panels installed.according to chapter 33 viewing panelNothing owed — awaiting certificate of correction
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB08/06/2018Elevator: elevatorrequired (DOB violation)Issued 2018; DOB's record still lists it as active