Dormitory
Sleep Inn, Brooklyn
2239 CHURCH AVENUE · Flatbush · BIN 3429200
💬 Discuss this project
2024Year Built
8Stories
H8Building Class
C4-4AZoning
15,080 sfGross Floor Area
43Units
26 Open Violations 18 unresolved · 8 paperwork only ▸FDNY Report ↗
Dormitory · Owner of record: CHURCH AVE CAPITAL LLC · 3,630 sf lot · 4.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof1 filing
Floor 13 filings
Site & exterior5 filings
Filed — no permit issued1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES2407/08/2026
RATHOD2404/09/2026
CHURCH AVE CAPITAL603/21/2026
AMERISTAR CONSTRUCTION503/22/2026
850 FOURTH AVE ASSOCIATES LLC404/09/2026
DASR103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/28/2019$2.5M—SASSON REALTY LLC → CHURCH AVE CAPITAL LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CNY ENGINEERING PC1003/21/2026
MICHAEL KANG ARCHITECT P C1403/21/2026
S Y CONSULTING VIOLATIONS203/21/2026
THE GREEN STUDIO203/21/2026
MILLENNIUM DESIGNS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor1807/08/2026
DASR CORPGeneral Contractor704/09/2026
PACIFIC PLBG HTGGeneral Contractor403/22/2026
PACIFIC PLBG&HTG CORPPlumbing207/08/2026
SERVICE SIGN ERECTORSScaffold107/08/2026
RICHARD NEUElectrical103/22/2026
PACIFIC PLBG. & HTG. CORPFire Protection107/08/2026
DENALI ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616712/01/2025
GEIGER ENGINEERING. PC689112/11/2023
MJE CONSULTING ENGINEERIN8522109/08/2023
LMW ENGINEERING GROUP LLC279104/29/2021
Building Lifecycle
All (166)Filed (22)Permit Issued (19)Signed Off (13)Violation (39)Inspection (9)Objection (34)Special Inspection (30)
07/20/2026
Signed off — Alteration
INSTALL NEW PLUMBING & SPRINKLER SYSTEM FOR 8-STORY BUILDING IN CONJUNCTION WITH NB JOB#321589651. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B00325191-I1
01/07/2026
Signed off — Alteration
INSTALL EMERGENCY GENERATOR ON ROOF WITH FUEL STORAGE TANK AND PUMP SYSTEM ON 1ST FLOOR FILED IN CONJUNCTION WITH NB 321589651. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B00637676-S1
01/07/2026
Signed off — Alteration
INSTALL EMERGENCY GENERATOR ON ROOF WITH FUEL STORAGE TANK AND PUMP SYSTEM ON 1ST FLOOR FILED IN CONJUNCTION WITH NB 321589651. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B00637676-I1
12/24/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/23/2025
Signed off — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
B01243426-I1
12/17/2025
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
12/17/2025
Special inspection requirement — HVAC and service water heating equipment
SHAHRIAR QUAYYUM
12/17/2025
Special inspection requirement — Final
SHAHRIAR QUAYYUM
12/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
12/17/2025
Special inspection requirement — HVAC and service water heating system controls
SHAHRIAR QUAYYUM
12/17/2025
Special inspection requirement — HVAC insulation and sealing
SHAHRIAR QUAYYUM
12/17/2025
Special inspection requirement — Shutoff dampers
SHAHRIAR QUAYYUM
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
12/17/2025
Special inspection requirement — Mechanical Systems
SHAHRIAR QUAYYUM
12/17/2025
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
12/08/2025
Permit issued — Boiler Equipment
B00637676-S1-BE
12/05/2025
Permit issued — Boiler Equipment
B00637676-I1-BE
12/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
12/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
12/04/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
SHAHRIAR QUAYYUM
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
12/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
12/03/2025
Signed off — Alteration
B00371020-I1
12/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/03/2025
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
12/03/2025
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
12/03/2025
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/03/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
12/03/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/01/2025
Filed — Alteration
INSTALL NEW HVAC SYSTEM FOR THE 8-STORY HOTEL BUILDING IN CONJUNCTION WITH NB JOB# 321589651. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B00337618-P2
11/18/2025
Filed — Alteration
INSTALL NEW PLUMBING & SPRINKLER SYSTEM FOR 8-STORY BUILDING IN CONJUNCTION WITH NB JOB#321589651. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B00325191-P6
11/10/2025
Signed off — Alteration
B00315402-I1
11/10/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NEEDLE BEAM SHALL COMPLY WITH THE CHAPTER #33 OF THE CODE. NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00984719-I1
11/10/2025
Signed off — Alteration
B00372659-I1
11/03/2025
Permit issued — Plumbing
B00325191-I1-PL
10/29/2025
Objection resolved — Addressed
10/29/2025
Objection resolved — Addressed
10/29/2025
Objection resolved — Addressed
10/29/2025
Objection resolved — Addressed
10/29/2025
Objection resolved — Addressed
10/27/2025
Objection raised — Other
10/27/2025
Objection raised — Structural
10/27/2025
Objection raised — Structural
10/27/2025
Objection raised — Fire_Protection
10/27/2025
Objection raised — Energy
10/20/2025
Filed — Alteration
INSTALL EMERGENCY GENERATOR ON ROOF WITH FUEL STORAGE TANK AND PUMP SYSTEM ON 1ST FLOOR FILED IN CONJUNCTION WITH NB 321589651. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B00637676-S1
10/20/2025
Filed — Alteration
INSTALL EMERGENCY GENERATOR ON ROOF WITH FUEL STORAGE TANK AND PUMP SYSTEM ON 1ST FLOOR FILED IN CONJUNCTION WITH NB 321589651. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B00637676-P2
10/20/2025
Permit issued — Mechanical Systems
B00337618-I1-MS
10/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
10/16/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
10/16/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
SHAHRIAR QUAYYUM
10/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
10/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
10/15/2025
Filed — Alteration
INSTALL NEW PLUMBING & SPRINKLER SYSTEM FOR 8-STORY BUILDING IN CONJUNCTION WITH NB JOB#321589651. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B00325191-P4
10/14/2025
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
10/09/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/07/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offFRANK MOORE12/08/2025
DOB NOWBoiler EquipmentSigned-offFRANK MOORE12/05/2025
DOB NOWPlumbingSigned-offPACIFIC PLBG&HTG CORP11/03/2025
DOB NOWMechanical SystemsSigned-offDASR CORP10/20/2025
DOB NOWSignSigned-offSERVICE SIGN ERECTORS CO06/25/2025
DOB NOWStructuralSigned-offDASR CORP04/03/2025
DOB NOWConstruction FenceSigned-offDASR CORP02/04/2025
DOB NOWProtection and Mechanical MethodsSigned-offRELIABLE ENTERPRISES INC11/04/2024
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC11/04/2024
DOB NOWSprinklersSigned-offPACIFIC PLBG. & HTG. CORP02/22/2024
DOB NOWProtection and Mechanical MethodsSigned-offRELIABLE ENTERPRISES INC01/31/2024
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC01/10/2024
DOB NOWProtection and Mechanical MethodsSigned-offRELIABLE ENTERPRISES INC12/04/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC12/04/2023
DOB NOWConstruction FenceSigned-offDASR CORP10/20/2023
DOB NOWProtection and Mechanical MethodsSigned-offRELIABLE ENTERPRISES INC08/08/2023
DOB NOWPlumbingSigned-offPACIFIC PLBG&HTG CORP07/08/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC05/11/2023
DOB NOWConstruction FenceSigned-offDASR CORP01/30/2023
BIS—ISSUEDDASR CORP05/15/2025
BIS—ISSUEDDASR CORP04/23/2024
BIS—ISSUEDDASR CORP10/19/2023
BIS—ISSUEDDASR CORP12/02/2022
1 project · most recent 12/01/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/01/2025Signed-offDASR CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Carrier 48FCEC06A2A3A0A0A0 58,500 BTU · Rooftop Unit ×1
Gree LIV36HP230V1R32AO 33,600 BTU · Condensing Unit ×1
Ventilation
Islandaire EZ42122231S46AA 12,300 BTU · Ptac ×43
Fantech FR100 50 CFM · Exhaust Fan ×1
Pennbarry DX13R 736 CFM · Exhaust Fan ×1
1 project · most recent 11/18/2025
FiledStatusContractorScope
11/18/2025Signed-offPACIFIC PLBG. & HTG. CORP1 heads
1 project · most recent 11/18/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/18/2025Signed-offPACIFIC PLBG&HTG CORPGas, Storm, Water/Sanitary
5 projects · most recent 12/16/2025
General Wiring
FiledStatusContractorScope
12/16/2025Permit IssuedHV ELECTRIC CORPGeneral Wiring
02/12/2025Permit IssuedDENALI ELECTRIC CORP—
05/11/2023CompleteRICHARD NEU—
03/01/2023CompleteHV ELECTRIC CORP—
12/08/2020CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/24/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/07/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
10/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/12/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/15/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
12/17/2025Maintenance informationSHAHRIAR QUAYYUMenergy_progress
12/17/2025HVAC and service water heating equipment SHAHRIAR QUAYYUMenergy_progress
12/17/2025FinalSHAHRIAR QUAYYUMprogress
12/17/2025Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
12/17/2025HVAC and service water heating system controls SHAHRIAR QUAYYUMenergy_progress
12/17/2025HVAC insulation and sealing SHAHRIAR QUAYYUMenergy_progress
12/17/2025Shutoff dampersSHAHRIAR QUAYYUMenergy_progress
12/17/2025Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
12/17/2025Mechanical SystemsSHAHRIAR QUAYYUMspecial
12/17/2025Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
12/04/2025HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
12/04/2025HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
12/04/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsSHAHRIAR QUAYYUMspecial
12/04/2025Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
12/04/2025HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
12/03/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/03/2025HVAC insulation and sealing FAHAD FATEHenergy_progress
12/03/2025HVAC and service water heating equipment FAHAD FATEHenergy_progress
12/03/2025HVAC and service water heating system controls FAHAD FATEHenergy_progress
12/03/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/03/2025Sprinkler SystemsFAHAD FATEHspecial
12/03/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
10/17/2025Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
10/16/2025Fire-Resistant Penetrations and Joints—special
10/16/2025HVAC-R and service water heating system controls—energy_progress
Latest 25 of 45.
▾Documents — 178 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch9
08/27/2026B00637676-P2Request digital key ↗
08/27/2026B00824493-I1Request digital key ↗
08/27/2026B00910897-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
08/19/2026B00325191-P3Request digital key ↗
08/19/2026B00325191-P2Request digital key ↗
08/19/2026B00325191-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
08/19/2026B00325191-P3Request digital key ↗
08/19/2026B00325191-P2Request digital key ↗
08/19/2026B00325191-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00315402-I1Request digital key ↗
09/02/2026B00372659-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/27/2026B00337618-I1Request digital key ↗
08/27/2026B00337618-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/01/2026B00371020-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00436799-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00436818-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION9
10/08/2025321589651Open ↗
10/06/2025321589651Open ↗
03/24/2022321589651Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/16/2022340770785Open ↗
10/06/2020340770785Open ↗
▸BISWORK PERMIT APPLICATION1
12/05/2022321589651Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/19/2025321589651Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM3
11/25/2025321589651Open ↗
06/03/2022321589651Open ↗
12/23/2020321589651Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/03/2020321589651Open ↗
▸BISVERIFY TAX LOT1
11/10/2025321589651Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
12/18/2020321589651Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/10/2025321589651Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
09/03/2020321589651Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/02/2026B00436799-I1Open ↗
09/02/2026B00436818-I1Open ↗
08/27/2026B00637676-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/12/2026B00325191-P4Open ↗
09/12/2026B00325191-P4Open ↗
09/02/2026B00325191-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/12/2026B00325191-P4Open ↗
09/02/2026B00325191-P1Open ↗
08/28/2026B00973233-I1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/04/2020340770785Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/06/2020340770785Open ↗
▸Trade Schedules & Equipment3
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
11/11/2025321589651Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
11/11/2025321589651Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
12/18/2020321589651Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
12/18/2020321589651Open ↗
04/20/2020321589651Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/18/2022321589651Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
10/06/2020340770785Open ↗
▸BISSTREET TREE SIGNOFF1
11/10/2025321589651Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/16/2022340770785Open ↗
▸Energy Compliance13
▸BISAIR SEALING AND INSULATION - VISUAL1
11/11/2025321589651Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
12/18/2020321589651Open ↗
▸BISINTERIOR LIGHTING POWER1
11/11/2025321589651Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/11/2025321589651Open ↗
▸BISFENESTRATION AREAS1
11/11/2025321589651Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
11/11/2025321589651Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/16/2021321589651Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/11/2025321589651Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/10/2025321589651Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/10/2025321589651Open ↗
▸BISLIGHTING CONTROLS1
11/11/2025321589651Open ↗
▸BISEXTERIOR LIGHTING POWER1
11/11/2025321589651Open ↗
▸BISFENESTRATION AIR LEAKAGE1
11/11/2025321589651Open ↗
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY7
12/19/2025321589651Open ↗
07/16/2021321589651Open ↗
12/21/2020321589651Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
12/21/2020321589651Open ↗
04/20/2020321589651Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
12/19/2025321589651Open ↗
12/05/2022321589651Open ↗
▸BISDEEP FOUNDATIONS / PILES2
11/19/2025321589651Open ↗
11/18/2022321589651Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
11/10/2025321589651Open ↗
11/18/2022321589651Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
12/21/2020321589651Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
11/18/2022321589651Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/10/2025321589651Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/10/2025321589651Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/19/2025321589651Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
12/03/2025321589651Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
11/19/2025321589651Open ↗
▸BISSOIL REPORT1
09/03/2020321589651Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
12/05/2022321589651Open ↗
▸Approvals, Objections & Sign-offs9
▸BISSCHEDULE A - OCCUPANCY / USE7
10/08/2025321589651Open ↗
10/06/2025321589651Open ↗
03/24/2022321589651Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/21/2020321589651Open ↗
12/18/2020321589651Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION9
11/25/2025321589651Open ↗
04/18/2022321589651Open ↗
04/18/2022321589651Open ↗
Showing 3 of 9 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/06/2020340770785Open ↗
▸BISEFILING COVER SHEET1
04/30/2020321589651Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/04/2020340770785Open ↗
▸Other Documents14
▸BISBPP - SUPPORTING DOCUMENTATION8
10/06/2020340770785Open ↗
10/06/2020340770785Open ↗
10/06/2020340770785Open ↗
Showing 3 of 8 on file for this type
▸BISSHUTOFF DAMPERS1
11/11/2025321589651Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
09/03/2020321589651Open ↗
▸BISMAINTENANCE INFORMATION1
11/11/2025321589651Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
11/11/2025321589651Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
11/11/2025321589651Open ↗
▸BISPLOT DIAGRAM1
12/18/2020321589651Open ↗