← Back
Two family converted from one family
224-04 145 ROAD
💬 Discuss this project
1925Year Built
2.5Stories
B3Building Class
R3-1Zoning
1,764 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.44 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectrical
Roof5p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT101/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOLOGISTICS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNPOWER CORPORATION, SYSGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802101/11/2024
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Violation (2)Special Inspection (5)
01/18/2024
Permit issued — Solar
Q00988401-I1-SL
01/11/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q00988401-I1
01/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
01/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
01/10/2024
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
01/10/2024
Special inspection requirement — Final
Chun Feng
01/10/2024
Special inspection requirement — Air barrier - visual inspection
Chun Feng
12/12/2008
Violation issued (ECB, closed)
Construction
07/29/1998
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNPOWER CORPORATION, SYS01/18/2024
1 project · most recent 01/07/2024
FiledStatusContractorScope
01/07/2024Permit IssuedBERGER QUALITY ELEC'L CON—
1 project · most recent 01/11/2024
FiledStatusContractorScope
01/11/2024Permit IssuedSUNPOWER CORPORATION, SYS12 panels, 4.8 kw, 2,700 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/10/2024Fire-Resistant Penetrations and JointsChun Fengspecial
01/10/2024Structural Stability – Alterations of existing buildingsChun Fengspecial
01/10/2024Energy Code Compliance InspectionsChun Fengprogress
01/10/2024FinalChun Fengprogress
01/10/2024Air barrier - visual inspectionChun Fengenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026Q00988401-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026Q00988401-I1Open ↗
08/24/2026Q00988401-I1Open ↗
08/24/2026Q00988401-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026Q00988401-I1Open ↗
08/24/2026Q00988401-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026Q00988401-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026Q00988401-I1Open ↗