← Back
Two stories - detached, small or mid-size
224-11 92 ROAD
QUEENS · BIN 4230588
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R2AZoning
1,300 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof3p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR104/29/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTURION SOLAR ENERGYGeneral Contractor303/21/2026
BERGER QUALITY ELEC'L CONElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475104/29/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
06/17/2025
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01213927-I1
05/02/2025
Permit issued — Solar
Q01213927-I1-SL
04/29/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01213927-I1
04/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
04/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
04/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
04/22/2025
Special inspection requirement — Final
Andres Arias Londono
04/22/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY05/02/2025
2 projects · most recent 07/29/2026
FiledStatusContractorScope
07/29/2026Permit IssuedMALTA ELECTRIC INC1 meters
04/27/2025CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/22/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
04/22/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
04/22/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
04/22/2025FinalAndres Arias Londonoprogress
04/22/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01213927-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026Q01213927-I1Open ↗
08/31/2026Q01213927-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01213927-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026Q01213927-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01213927-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01213927-I1Open ↗