Condo, residential unit in walk-up building
224 22ND STREET
BROOKLYN · BIN 3342375
💬 Discuss this project
1995Year Built
4Stories
R2Building Class
R6BZoning
9,054 sfGross Floor Area
14Units
Rent Stabilized3 Active Violations ▸FDNY Report ↗
Condo, residential unit in walk-up building · 5,008 sf lot · 1.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction11p · 1 filing · 20 docs
Floor 4Under Construction24p · 1 filing · 20 docs
Floor 3Under Construction24p · 1 filing · 20 docs
Floor 2Under Construction26p · 1 filing · 20 docs
Floor 1Unit 1A, Unit 1BUnder Construction42p · 1 filing · 20 docs
Site & exteriorProposed temporary wooden fenceUnder Construction3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
224 22 St503/22/2026
224 22 Street203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
E4P Consulting Engineering609/25/2026
Celin Munoz Consulting Engineering803/09/2026
Kit Middleton Architect204/14/2025
PS Engineers104/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PS Engineers203/21/2026
Kit Middleton Architect P3003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WKR ConstructionGeneral Contractor1107/08/2026
CNJ PlumbingPlumbing507/08/2026
WKR ConstructionScaffold404/09/2026
Village P & H NYPlumbing107/08/2026
Village P & H NYFire Protection106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ryan Special Engineering20181109/25/2026
Kadan5956803/09/2026
Building Lifecycle
All (182)Filed (17)Permit Issued (20)Violation (41)Inspection (1)Objection (73)Special Inspection (30)
09/25/2026
Filed — Alteration
Demolition and shoring drawings for CMU bearing walls at first floor existing of 4 story residential structure. Steel frame stabilization system. Repair of existing internal bearing walls all floors. The building will be vacated during construction.
B00846046-P9
09/09/2026
Objection resolved — Addressed
07/16/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/14/2026
Special inspection requirement — Post-installed Anchors
William Ryan
07/14/2026
Special inspection requirement — Sprinkler Systems
William Ryan
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
06/04/2026
Permit issued — Plumbing
B00846046-S4-PL
05/19/2026
Permit issued — Mechanical Systems
B00846046-Z2-MS
04/10/2026
Permit issued — Foundation
B00846046-S6-FO
03/25/2026
Permit issued — Structural
B00846046-S5-ST
03/20/2026
Objection raised — Scope
03/20/2026
Objection raised — Structural
03/11/2026
Permit issued — General Construction
B00846046-I1-GC
03/11/2026
Permit issued — Construction Fence
B01031145-I1-FN
03/09/2026
Filed — Alteration
Demolition and shoring drawings for CMU bearing walls at first floor existing of 4 story residential structure. Steel frame stabilization system. Repair of existing internal bearing walls all floors. The building will be vacated during construction.
B00846046-P8
03/09/2026
Filed — Alteration
Demolition and shoring drawings for CMU bearing walls at first floor existing of 4 story residential structure. Steel frame stabilization system. Repair of existing internal bearing walls all floors. The building will be vacated during construction.
B00846046-P7
02/26/2026
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE OZAETA
02/26/2026
Special inspection requirement — Structural Cold-Formed Steel
GEORGE OZAETA
02/26/2026
Special inspection requirement — Structural Steel - Details
GEORGE OZAETA
02/26/2026
Special inspection requirement — Structural Wood Frame
GEORGE OZAETA
02/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE OZAETA
02/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
02/26/2026
Special inspection requirement — Sprayed fire-resistant materials
William Ryan
02/26/2026
Special inspection requirement — Structural Steel - Welding
GEORGE OZAETA
02/26/2026
Special inspection requirement — Masonry
GEORGE OZAETA
02/26/2026
Special inspection requirement — Final
GEORGE OZAETA
01/28/2026
Objection resolved — Addressed
01/28/2026
Objection resolved — Addressed
01/23/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
STEPHEN LAWNICZAK
01/23/2026
Special inspection requirement — Final
GEORGE OZAETA
01/23/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE OZAETA
01/23/2026
Special inspection requirement — Footing and Foundation
GEORGE OZAETA
01/23/2026
Special inspection requirement — Deep Foundation Elements
Daniel Hurley
01/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE OZAETA
01/23/2026
Special inspection requirement — Helical Piles Foundation (BB # 2014-020)
Daniel Hurley
09/04/2025
Permit issued — Boiler Equipment
B00846046-S9-BE
09/04/2025
Permit issued — Boiler Equipment
B00846046-Z1-BE
07/01/2025
Permit issued — Plumbing
B00846046-S4-EW-SP
07/01/2025
Permit issued — Plumbing
B00846046-S4-PL
05/07/2025
Objection raised — Scope
05/07/2025
Objection raised — Scope
05/07/2025
Objection raised — Scope
05/07/2025
Objection raised — Other
05/07/2025
Objection raised — Cost
05/07/2025
Objection raised — Other
05/07/2025
Objection raised — Scope
04/14/2025
Filed — Alteration
Demolition and shoring drawings for CMU bearing walls at first floor existing of 4 story residential structure. Steel frame stabilization system. Repair of existing internal bearing walls all floors. The building will be vacated during construction.
B00846046-P1
04/11/2025
Filed — Alteration
Demolition and shoring drawings for CMU bearing walls at first floor existing of 4 story residential structure. Steel frame stabilization system. Repair of existing internal bearing walls all floors. The building will be vacated during construction.
B00846046-P4
04/11/2025
Filed — Alteration
Demolition and shoring drawings for CMU bearing walls at first floor existing of 4 story residential structure. Steel frame stabilization system. Repair of existing internal bearing walls all floors. The building will be vacated during construction.
B00846046-P6
04/10/2025
Permit issued — Construction Fence
B01031145-I1-FN
04/10/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
STEPHEN LAWNICZAK
04/10/2025
Special inspection requirement — Final
GEORGE OZAETA
04/10/2025
Special inspection requirement — Footing and Foundation
GEORGE OZAETA
04/10/2025
Special inspection requirement — Concrete - Cast-In-Place
GEORGE OZAETA
04/10/2025
Special inspection requirement — Deep Foundation Elements
Daniel Hurley
04/10/2025
Special inspection requirement — Helical Piles Foundation (BB # 2014-020)
Daniel Hurley
04/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE OZAETA
04/08/2025
Permit issued — Foundation
B00846046-S6-FO
03/19/2025
Special inspection requirement — Structural Wood Frame
GEORGE OZAETA
03/19/2025
Special inspection requirement — Final
GEORGE OZAETA
Latest 60 of 182 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCNJ Plumbing06/04/2026
DOB NOWMechanical SystemsPermit IssuedWKR Construction05/19/2026
DOB NOWFoundationPermit IssuedWKR Construction04/10/2026
DOB NOWStructuralPermit IssuedWKR Construction03/25/2026
DOB NOWGeneral ConstructionPermit IssuedWKR Construction03/11/2026
DOB NOWConstruction FencePermit IssuedWKR Construction03/11/2026
DOB NOWBoiler EquipmentPermit IssuedCNJ Plumbing09/04/2025
DOB NOWBoiler EquipmentPermit IssuedCNJ Plumbing09/04/2025
DOB NOWSprinklersPermit IssuedVillage P & H NY07/01/2025
DOB NOWPlumbingPermit IssuedVillage P & H NY07/01/2025
DOB NOWConstruction FencePermit IssuedWKR Construction04/10/2025
DOB NOWFoundationPermit IssuedWKR Construction04/08/2025
DOB NOWStructuralPermit IssuedWKR Construction03/13/2025
DOB NOWGeneral ConstructionPermit IssuedWKR Construction03/13/2025
DOB NOWBoiler EquipmentPermit IssuedCNJ Plumbing09/03/2024
DOB NOWBoiler EquipmentPermit IssuedCNJ Plumbing09/03/2024
DOB NOWConstruction FencePermit IssuedWKR Construction04/15/2024
DOB NOWFoundationPermit IssuedWKR Construction03/20/2024
DOB NOWStructuralPermit IssuedWKR Construction03/19/2024
DOB NOWGeneral ConstructionPermit IssuedWKR Construction03/13/2024
BISOTISSUED2260 Mag07/12/2019
BISCCISSUEDThomas Reyes Int11/25/2002
BISPLISSUEDMainland PLG Heating03/02/2000
BISSPISSUEDPasquale Quaratino11/03/1999
BIS—RE-ISSUEDG & R General Construction11/14/1995
BISEQRE-ISSUEDG & R General Construction11/14/1995
1 project · most recent 09/25/2026
Sprinkler System
FiledStatusContractorScope
09/25/2026Permit IssuedParamount ServicesSprinkler System
1 project · most recent 09/25/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/25/2026Permit IssuedCNJ PlumbingGas, Storm, Water/Sanitary
1 project · most recent 09/25/2026
Steel Masonry
FiledStatusContractorScope
09/25/2026Permit IssuedCNJ PlumbingSteel, Masonry
1 project · most recent 04/13/2024
Fence
FiledStatusContractorScope
04/13/2024Permit IssuedWKR ConstructionFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/16/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
07/14/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
07/14/2026Sprinkler SystemsWilliam Ryanspecial
07/14/2026Post-installed AnchorsWilliam Ryanspecial
02/26/2026Structural Steel - DetailsGEORGE OZAETAspecial
02/26/2026Structural Steel - High Strength BoltingGEORGE OZAETAspecial
02/26/2026Structural Steel - WeldingGEORGE OZAETAspecial
02/26/2026FinalGEORGE OZAETAprogress
02/26/2026Structural Wood FrameGEORGE OZAETAprogress
02/26/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
02/26/2026MasonryGEORGE OZAETAspecial
02/26/2026Sprayed fire-resistant materialsWilliam Ryanspecial
02/26/2026Structural Cold-Formed SteelGEORGE OZAETAspecial
02/26/2026Structural Stability – Alterations of existing buildingsGEORGE OZAETAspecial
01/23/2026Deep Foundation ElementsDaniel Hurleyspecial
01/23/2026Structural Stability – Alterations of existing buildingsGEORGE OZAETAspecial
01/23/2026Subsurface Investigations (Borings/Test Pits)STEPHEN LAWNICZAKspecial
01/23/2026FinalGEORGE OZAETAprogress
01/23/2026Footing and FoundationGEORGE OZAETAprogress
01/23/2026Concrete - Cast-In-PlaceGEORGE OZAETAspecial
01/23/2026Helical Piles Foundation (BB # 2014-020)Daniel Hurleyspecial
04/10/2025Footing and FoundationGEORGE OZAETAprogress
04/10/2025Subsurface Investigations (Borings/Test Pits)STEPHEN LAWNICZAKspecial
04/10/2025Structural Stability – Alterations of existing buildingsGEORGE OZAETAspecial
04/10/2025Helical Piles Foundation (BB # 2014-020)Daniel Hurleyspecial
04/10/2025Deep Foundation ElementsDaniel Hurleyspecial
Latest 25 of 74.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/26/2026B00846046-P8Request digital key ↗
08/26/2026B00846046-Z2Request digital key ↗
08/26/2026B00846046-P3Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
04/01/2024321746642Open ↗
05/30/2018321746642Open ↗
▸Seals & Professional Certifications58
▸DOB NOWSpecial Inspector Seal & Signature24
10/05/2026B00846046-P9Open ↗
09/23/2026B00846046-S9Open ↗
09/23/2026B00846046-Z1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/26/2026B00846046-P2Open ↗
08/26/2026B00846046-P7Open ↗
08/26/2026B00846046-P4Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026B00846046-S9Open ↗
09/23/2026B00846046-Z1Open ↗
09/02/2026B00846046-P6Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/30/2018321746642Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/30/2018321746642Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/30/2018321746642Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
05/30/2018321746642Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/26/2026B00846046-P8Open ↗
08/26/2026B00846046-P4Open ↗
08/26/2026B00846046-P3Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/30/2018321746642Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/30/2018321746642Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT4
08/13/2026B00846046-P3Open ↗
08/13/2026B00846046-P7Open ↗
08/13/2026B00846046-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00846046-S6Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/30/2018321746642Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/31/2018321746642Open ↗