← Back
One story - permanent living quarter
224-40 76 AVENUE
QUEENS · Oakland Gardens-Hollis Hills · BIN 4165474
💬 Discuss this project
1960Year Built
1Stories
A2Building Class
R2AZoning
1,752 sfGross Floor Area
1Units
One story - permanent living quarter · 6,400 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/11/2025$908K—— → —$518/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HT ASSOCIATES306/17/2026
Building Lifecycle
All (58)Filed (3)Objection (26)Special Inspection (29)
08/19/2026
Special inspection requirement — Wood – Prefabricated I-Joists
08/18/2026
Objection resolved — Resolved
08/18/2026
Objection resolved — Resolved
08/18/2026
Objection resolved — Resolved
08/18/2026
Objection resolved — Resolved
08/18/2026
Objection resolved — Resolved
08/14/2026
Objection resolved — Resolved
07/23/2026
Objection resolved — Resolved
07/23/2026
Objection resolved — Resolved
07/23/2026
Objection resolved — Resolved
07/23/2026
Objection resolved — Resolved
07/23/2026
Objection resolved — Resolved
07/23/2026
Objection resolved — Resolved
07/17/2026
Objection raised — Fire_Protection
07/17/2026
Objection raised — Zoning
07/17/2026
Objection raised — Zoning
07/17/2026
Objection raised — Fire_Protection
07/17/2026
Objection raised — Zoning
07/17/2026
Objection raised — Scope
07/17/2026
Objection raised — Scope
07/17/2026
Objection raised — Energy
07/17/2026
Objection resolved — Addressed
07/17/2026
Objection raised — Inspections
07/17/2026
Objection raised — Structural
07/17/2026
Objection raised — Other
07/17/2026
Objection raised — Admin
07/17/2026
Objection raised — Scope
06/17/2026
Filed — Alteration
INSTALL 8'-0" HEIGHT CONSTRUCTION FENCE AS PER PLAN. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01415354-I1
06/17/2026
Filed — Full Demolition
PROPOSED NON-MECHANICAL FULL DEMOLITION OF EXISTING 1-STORY BUILDING.
Q01415340-I1
06/17/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
06/17/2026
Special inspection requirement — Demolition
06/15/2026
Filed — New Building
APPLICATION FILED HEREWITH TO PROPOSED NEW 2.5 STORY, SINGLE FAMILY DWELLING AND OBTAIN NEW C OF O.
Q01411134-I1
06/15/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
06/15/2026
Special inspection requirement — Structural Wood Frame
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/04/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
06/04/2026
Special inspection requirement — Structural Steel - High Strength Bolting
06/04/2026
Special inspection requirement — Structural Steel - Welding
06/04/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/04/2026
Special inspection requirement — Permanent certificate
06/04/2026
Special inspection requirement — Structural Steel - Details
06/04/2026
Special inspection requirement — Subgrade Inspections
06/04/2026
Special inspection requirement — Concrete - Cast-In-Place
06/04/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/04/2026
Special inspection requirement — Metering
06/04/2026
Special inspection requirement — Air barrier - visual inspection
06/04/2026
Special inspection requirement — Energy Code Compliance Inspections
06/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/04/2026
Special inspection requirement — Electric vehicle service equipment requirements
06/04/2026
Special inspection requirement — Insulation placement and R values
06/04/2026
Special inspection requirement — Fenestration areas
06/04/2026
Special inspection requirement — Air barrier — testing
06/04/2026
Special inspection requirement — Fenestration air leakage
06/04/2026
Special inspection requirement — Maintenance information
06/04/2026
Special inspection requirement — Interior lighting power
06/02/2026
Special inspection requirement — Footing and Foundation
06/02/2026
Special inspection requirement — Final
Nothing on file for this building.
1 project · most recent 06/15/2026
Steel Concrete Wood
FiledStatusContractorScope
06/15/2026——Steel, Concrete, Wood
1 project · most recent 06/17/2026
Fence
FiledStatusContractorScope
06/17/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
08/19/2026Wood – Prefabricated I-Joists—special
06/17/2026Structural Stability – Alterations of existing Buildings—special
06/17/2026Demolition—special
06/15/2026Subsurface Conditions – Fill Placement & In-Place Density—special
06/15/2026Structural Wood Frame—progress
06/04/2026Fire-Resistant Penetrations and Joints—special
06/04/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
06/04/2026Structural Steel - High Strength Bolting—special
06/04/2026Structural Steel - Welding—special
06/04/2026Subsurface Investigations (Borings/Test Pits)—special
06/04/2026Permanent certificate—energy_progress
06/04/2026Structural Steel - Details—special
06/04/2026Subgrade Inspections—special
06/04/2026Concrete - Cast-In-Place—special
06/04/2026Excavations - Sheeting, Shoring, and Bracing—special
06/04/2026Metering—energy_progress
06/04/2026Air barrier - visual inspection—energy_progress
06/04/2026Energy Code Compliance Inspections—progress
06/04/2026Fire-Resistance Rated Construction—progress
06/04/2026Fenestration and door U-factor and product ratings—energy_progress
06/04/2026Electric vehicle service equipment requirements—energy_progress
06/04/2026Insulation placement and R values—energy_progress
06/04/2026Fenestration areas—energy_progress
06/04/2026Air barrier — testing —energy_progress
06/04/2026Fenestration air leakage—energy_progress
Latest 25 of 29.
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026Q01415354-I1Request digital key ↗
08/16/2026Q01415340-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026Q01415354-I1Open ↗
08/16/2026Q01415340-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/16/2026Q01415340-I1Open ↗
▸DOB NOWStructure Photographs1
08/16/2026Q01415340-I1Open ↗