DOB10/21/2025Unpermitted excavation work has undermined perimeter walls & columns supporting first floor framing remedy: retain nys rdp to perform weekly periodic inspections & provide reports. First reprt due by 11/21/25. Control #376372
DOB04/24/2025Remedy: construct temporary construction fence to protect public. Cons truction fence at expo 1 & 3 approx 40' each and expo 2 & 4 is approx 104' each
DOB04/24/2025Remedy: seal all openings from the cellar level to the 1STFL/ground le vel
DOB12/11/2024At the time of inspection observed excavation has been done throughout the cellar compromising the foundation and building stability. No permit for this work at the time of inspection.
DOB12/11/2024At the time of inspection observed 3 workers busy doing the illegal excavation in the cellar with excavator compromising the foundation and building stability. This unpermitted excavation makes the building unsafe to occupy.
DOB12/11/2024At the time of inspection observed 3 workers excavating in the cellar with the excavator. Approximately 2 feet excavation done compromising the foundation and building stability. Owners to provide professional engineer report about building stability.
DOB12/11/2024At the time of inspection observed three workers working in cellar excavating with excavator. Approximately 2' of excavation done already. No permit for this work at the time of inspection.
DOB12/11/2024Exterior wall has been cut to accommodate two windows at exp. #4 and one window and one entry door at exposure #3. No permit for this work at the time of inspection.
ECB04/22/2025Atoi at above premises observed work in cellar approx. Five feet in depth. Of excavation had been completed. The exterior wall was cut to accommodate two windows at expo #4, and one window and one entry door atNothing owed — awaiting certificate of correction