← Back
One story - permanent living quarter
224-66 76 ROAD
QUEENS · BIN 4165514
💬 Discuss this project
1960Year Built
1Stories
A2Building Class
R2AZoning
1,248 sfGross Floor Area
1Units
One story - permanent living quarter · 4,100 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/13/2021$820K—Private party → Private party$657/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AN SHEN MA ARCHITECT206/07/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FENWA CONSTRUCTIONGeneral Contractor107/08/2026
CROWN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AN SHEN MA ARCHITECT2968206/07/2021
Building Lifecycle
All (24)Filed (2)Permit Issued (2)Signed Off (2)Inspection (7)Special Inspection (11)
11/17/2021
Signed off — Alteration
TO REMOVE EXISTING OIL FURNACE AND INSTALL GAS BOILER & NON-BEARING PARTITIONS IN CELLAR OF EXISTING 1 STORY 1 FAMILY DWELLING. FILED IN CONJUNCTION W/ PLUMBING #Q00526195. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00526134-I1
11/12/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/11/2021
Signed off — Alteration
Q00526195-I1
08/25/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/25/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/19/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/09/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/01/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/28/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/16/2021
Permit issued — Plumbing
Q00526195-I1-PL
06/07/2021
Filed — Alteration
Q00526195-I1
06/07/2021
Permit issued — General Construction
Q00526134-I1-GC-CX
05/26/2021
Filed — Alteration
TO REMOVE EXISTING OIL FURNACE AND INSTALL GAS BOILER & NON-BEARING PARTITIONS IN CELLAR OF EXISTING 1 STORY 1 FAMILY DWELLING. FILED IN CONJUNCTION W/ PLUMBING #Q00526195. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00526134-I1
05/25/2021
Special inspection requirement — HVAC-R and service water heating system controls
AN MA
05/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
05/20/2021
Special inspection requirement — Heating Systems
AN MA
05/20/2021
Special inspection requirement — Final
AN MA
05/20/2021
Special inspection requirement — Energy Code Compliance Inspections
AN MA
05/20/2021
Special inspection requirement — Fire-Resistance Rated Construction
AN MA
05/20/2021
Special inspection requirement — Permanent certificate
AN MA
05/20/2021
Special inspection requirement — Interior lighting power
AN MA
05/20/2021
Special inspection requirement — Ventilation and air distribution system
AN MA
05/20/2021
Special inspection requirement — Mechanical Systems
AN MA
05/20/2021
Special inspection requirement — Maintenance information
AN MA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCROWN PLUMBING INC06/16/2021
DOB NOWGeneral ConstructionSigned-offFENWA CONSTRUCTION06/07/2021
BISOTISSUEDEMPOWER CES LLC11/16/2022
1 project · most recent 03/15/2023
FiledStatusContractorScope
03/15/2023CompleteISLAND ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/12/2021Pass-Final General Construction Non-Directive 14PassView ↗
08/25/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/25/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/19/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/09/2021Fail-Final General Construction Non-Directive 14FailView ↗
07/01/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/28/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
05/25/2021HVAC-R and service water heating system controlsAN MAenergy_progress
05/20/2021Fire-Resistant Penetrations and JointsAN MAspecial
05/20/2021Heating SystemsAN MAspecial
05/20/2021FinalAN MAprogress
05/20/2021Energy Code Compliance InspectionsAN MAprogress
05/20/2021Fire-Resistance Rated ConstructionAN MAprogress
05/20/2021Permanent certificateAN MAenergy_progress
05/20/2021Interior lighting powerAN MAenergy_progress
05/20/2021Ventilation and air distribution systemAN MAenergy_progress
05/20/2021Mechanical SystemsAN MAspecial
05/20/2021Maintenance informationAN MAenergy_progress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026Q00526134-I1Request digital key ↗
08/27/2026Q00526195-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
11/02/2022440753427Open ↗
▸BISWORK PERMIT APPLICATION1
11/16/2022440753427Open ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026Q00526134-I1Open ↗
08/29/2026Q00526134-I1Open ↗
08/29/2026Q00526134-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026Q00526134-I1Open ↗
08/27/2026Q00526195-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/02/2022440753427Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026Q00526134-I1Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
11/02/2022440753427Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026Q00526134-I1Open ↗
08/27/2026Q00526195-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/02/2022440753427Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/06/2023440753427Open ↗
11/16/2022440753427Open ↗
11/02/2022440753427Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00526195-I1Open ↗
08/13/2026Q00526134-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/06/2023440753427Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
11/02/2022440753427Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
04/06/2023440753427Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/06/2023440753427Open ↗
11/16/2022440753427Open ↗
11/02/2022440753427Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISFINAL ELECTRICAL SIGNOFF1
04/07/2023440753427Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/07/2023440753427Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW31
04/06/2023440753427Open ↗
▸BISCOST AFFIDAVIT1
11/02/2022440753427Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/02/2022440753427Open ↗
▸Other Documents1
▸BISTax Abatement Miscellaneous1
04/07/2023440753427Open ↗