Walk-up apt, over six families with stores
224 8TH AVENUE
MANHATTAN · BIN 1014061
💬 Discuss this project
1910Year Built
6Stories
C7Building Class
C1-6AZoning
16,479 sfGross Floor Area
25Units
Rent Stabilized1 Active Violation ▸FISP: SWARMP
Walk-up apt, over six families with stores · Owner of record: 224-30 Eighth Ave · 4,000 sf lot · 4.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 6Cosmetic work at lobby and hallways34p · 5 filings · 20 docs
Floor 5Cosmetic work at lobby and hallways47p · 6 filings · 20 docs
Floor 4Cosmetic work at lobby and hallways5p · 1 filing · 3 docs
Floor 3Cosmetic work at lobby and hallways23p · 3 filings · 20 docs
Floor 2Cosmetic work at lobby and hallways34p · 3 filings · 20 docs
Floor 1Panda Nail Salon, Oasis Men's Spa12p · 5 filings · 20 docs
CellarPanda Nail Salon6p · 3 filings · 20 docs
Sub-BasementOasis Men's Spa1p · 1 filing · 2 docs
Site & exteriorInstallation of sidewalk shed12p · 3 filings · 11 docs
Filed — no permit issuedWall sign installation2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
224 Eighth Ave1203/22/2026
Oasis Men's Spa503/22/2026
Livingston303/21/2026
224 8th Ave103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HWL Engineering502/09/2026
Rise Architecture NJ1307/11/2024
Huan Design107/07/2024
New York & Company206/10/2024
Syed Engineering207/30/2020
Asif Jamil, RA111/21/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jack Jaffa & Associates2603/21/2026
HWL Engineering803/21/2026
New York & Company203/21/2026
ZL Building Associate203/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZL Building AssociateGeneral Contractor707/08/2026
Tri ContractingGeneral Contractor603/21/2026
Sabet Development CompanyGeneral Contractor507/08/2026
Rock Group NYScaffold407/08/2026
Kings Group NYScaffold407/08/2026
Kle ConstructionGeneral Contractor303/21/2026
Wasoff Plumbing & Utility CoPlumbing207/08/2026
CBB PlumbingPlumbing207/08/2026
Orbit Plumbing & HeatingPlumbing207/08/2026
High Quality Electric ofElectrical103/22/2026
Electrical Power Light & MechanicalElectrical103/22/2026
Danube Electric CoElectrical103/22/2026
Electrical Power Light & MechanicalElectrical103/21/2026
New Century Electrical ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HWL Engineering3894402/12/2025
Biz Designs63121307/11/2024
Huan Design7669107/07/2024
AZ Professional Engineering766606/28/2024
New York Engineering Associates851206/10/2024
Building Lifecycle
All (178)Filed (23)Permit Issued (20)Signed Off (17)Facade (FISP) (3)Violation (60)Inspection (15)Objection (10)Special Inspection (30)
08/08/2026
Violation issued (HPD, open)
C
03/25/2026
Objection resolved — Resolved
03/25/2026
Objection resolved — Resolved
03/25/2026
Objection resolved — Resolved
03/25/2026
Objection resolved — Resolved
03/25/2026
Objection resolved — Resolved
02/25/2026
Objection raised — Other
02/25/2026
Objection raised — Other
02/25/2026
Objection raised — Zoning
02/25/2026
Objection raised — Other
02/25/2026
Objection raised — Other
02/09/2026
Filed — Alteration
M01357086-I1
02/07/2026
Special inspection requirement — Final
01/27/2026
Signed off — Alteration
M01047685-I1
12/24/2025
Violation issued (ECB, closed)
Construction
10/15/2025
Signed off — Alteration
3 pedicure chair for Nail Salon Plumbing work pertaining of initial filing
M01175111-S1
10/15/2025
Signed off — Alteration
3 pedicure chair for Nail Salon Plumbing work pertaining of initial filing
M01175111-I1
10/02/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/12/2025
Violation issued (ECB, closed)
Zoning
08/12/2025
Violation issued (ECB, closed)
Construction
08/12/2025
Violation issued (ECB, closed)
Construction
06/25/2025
Permit issued — Mechanical Systems
M01175111-I1-MS
05/27/2025
Violation issued (HPD, closed)
B
05/27/2025
Violation issued (HPD, closed)
C
03/28/2025
Violation issued (HPD, closed)
B
03/28/2025
Violation issued (HPD, closed)
B
03/21/2025
Violation issued (HPD, closed)
B
03/21/2025
Violation issued (HPD, closed)
B
03/21/2025
Violation issued (HPD, closed)
C
03/21/2025
Violation issued (HPD, closed)
C
03/21/2025
Violation issued (HPD, closed)
A
03/21/2025
Violation issued (HPD, closed)
B
03/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/20/2025
Permit issued — General Construction
M01175111-I1-GC
02/20/2025
Permit issued — Plumbing
M01175111-S1-PL
02/12/2025
Filed — Alteration
3 pedicure chair for Nail Salon Plumbing work pertaining of initial filing
M01175111-S1
02/12/2025
Filed — Alteration
3 pedicure chair for Nail Salon Plumbing work pertaining of initial filing
M01175111-I1
02/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
WANLONG HE
02/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
WANLONG HE
02/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WANLONG HE
02/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WANLONG HE
02/01/2025
Special inspection requirement — Final
WANLONG HE
02/01/2025
Special inspection requirement — Mechanical Systems
WANLONG HE
01/29/2025
Cycle 9 facade report submitted
01/21/2025
Cycle 9 facade report signed — SWARMP
01/08/2025
Cycle 9 facade inspection completed
12/27/2024
Signed off — Alteration
Interior renovation as shown on plans filed herewith.
M01003653-I1
12/22/2024
Violation issued (HPD, closed)
C
12/20/2024
Signed off — Alteration
Install plumbing fixtures for proposed Nail Salon as shown on plan
M01094873-I1
12/20/2024
Signed off — Alteration
Install plumbing fixtures for proposed Nail Salon as shown on plan
M01094873-S1
12/20/2024
Violation issued (HPD, closed)
C
12/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/02/2024
Violation issued (HPD, closed)
A
11/30/2024
Violation issued (HPD, closed)
C
11/27/2024
Signed off — Alteration
Interior renovation as shown on plans filed herewith.
M00899783-I1
11/12/2024
Signed off — Alteration
Installation, relocation and removal on plumbing fixtures as shown on plans filed herewith.
M00899829-I1
10/02/2024
Permit issued — General Construction
M01003653-I1-GC
09/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 178 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offZL Building Associate06/25/2025
DOB NOWGeneral ConstructionSigned-offZL Building Associate02/20/2025
DOB NOWPlumbingSigned-offWasoff Plumbing & Utility Co02/20/2025
DOB NOWGeneral ConstructionSigned-offSabet Development Company10/02/2024
DOB NOWGeneral ConstructionSigned-offZL Building Associate08/27/2024
DOB NOWPlumbingSigned-offWasoff Plumbing & Utility Co08/27/2024
DOB NOWGeneral ConstructionSigned-offKle Construction07/11/2024
DOB NOWBoiler EquipmentSigned-offAce-Atlas Plumbing & Heating06/14/2024
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating04/18/2024
DOB NOWGeneral ConstructionSigned-offSabet Development Company02/20/2024
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating02/15/2024
DOB NOWGeneral ConstructionSigned-offSabet Development Company11/16/2023
DOB NOWPlumbingSigned-offCBB Plumbing09/08/2023
DOB NOWGeneral ConstructionSigned-offTri Contracting09/07/2023
DOB NOWGeneral ConstructionSigned-offTri Contracting09/06/2023
DOB NOWPlumbingSigned-offCBB Plumbing09/05/2023
DOB NOWSupported ScaffoldSigned-offKings Group NY08/07/2020
DOB NOWSidewalk ShedSigned-offKings Group NY08/07/2020
DOB NOWSidewalk ShedSigned-offRock Group NY05/19/2020
DOB NOWSidewalk ShedSigned-offRock Group NY11/21/2018
BISOTISSUEDTotal NY Construction08/27/2021
BISOTISSUEDRDT Home Inprovement08/19/2020
BISOTISSUEDTotal NY Construction08/12/2020
BISPLISSUEDAccurate Mechanical05/16/2008
BISEQISSUEDReliable Construction # 104/14/2008
BISMHISSUEDReliable Construction # 104/14/2008
BISFSRE-ISSUEDJack Piccini04/07/2004
BISEQISSUEDOriental Construction03/01/2002
BISOTISSUEDOriental Construction10/04/2001
BISOTISSUEDFous Onstrution Orp01/31/2001
BISOTISSUEDOwner Same05/13/1998
BISFBISSUEDStar Industrial Service Co08/09/1995
BISOTISSUEDNortheast Concepts03/23/1995
BISOTISSUEDSeptet Associates06/12/1991
BIS—ISSUEDHuey Engineering Service06/11/1991
16 projects · most recent 09/21/2026
General Wiring
FiledStatusContractorScope
09/21/2026CompleteElectrical Power Light & MechanicalGeneral Wiring
09/23/2025Permit IssuedNew Century Electrical Contracting26 meters
03/21/2025Permit IssuedElectrical Power Light & Mechanical23 meters, 3 new_meters
10/31/2024CompleteElectrical Power Light & MechanicalGeneral Wiring
04/03/2024CompleteElectrical Power Light & MechanicalGeneral Wiring
03/18/2024CompleteKings Electric CoGeneral Wiring
11/16/2023Permit IssuedDanube Electric CoGeneral Wiring
11/16/2023Permit IssuedDanube Electric CoGeneral Wiring
11/16/2023Permit IssuedDanube Electric CoGeneral Wiring
11/16/2023Permit IssuedDanube Electric CoGeneral Wiring
11/16/2023Permit IssuedDanube Electric CoGeneral Wiring
11/16/2023Permit IssuedDanube Electric CoGeneral Wiring
11/16/2023Permit IssuedDanube Electric CoGeneral Wiring
11/16/2023Permit IssuedDanube Electric CoGeneral Wiring
12/15/2020Permit IssuedHigh Quality Electric of—
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
10/02/2025Pass-Final Boiler Equipment InspectionPassView ↗
09/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/13/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/21/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
02/07/2026Final—progress
02/12/2025Tenant Protection Plan ComplianceWANLONG HEspecial
02/12/2025Tenant Protection Plan ComplianceWANLONG HEspecial
02/10/2025Fire-Resistant Penetrations and JointsWANLONG HEspecial
02/10/2025Fire-Resistant Penetrations and JointsWANLONG HEspecial
02/01/2025FinalWANLONG HEprogress
02/01/2025Mechanical SystemsWANLONG HEspecial
08/20/2024Tenant Protection Plan ComplianceWANLONG HEspecial
08/20/2024Tenant Protection Plan ComplianceWANLONG HEspecial
08/18/2024Fire-Resistant Penetrations and JointsWANLONG HEspecial
08/18/2024Fire-Resistant Penetrations and JointsWANLONG HEspecial
08/12/2024FinalWANLONG HEprogress
07/15/2024Fire-Resistant Penetrations and JointsJeff Akermanspecial
07/15/2024Tenant Protection Plan ComplianceJeff Akermanspecial
07/11/2024Fire-Resistant Penetrations and JointsJeff Akermanspecial
07/11/2024Tenant Protection Plan Compliance—special
07/01/2024Fire-Resistant Penetrations and JointsJeff Akermanspecial
07/01/2024Structural Stability – Alterations of existing buildingsVIJAY KUMARspecial
07/01/2024Tenant Protection Plan ComplianceJeff Akermanspecial
07/01/2024FinalSHIMON GREENEBAUMprogress
07/01/2024Fire-Resistance Rated ConstructionJeff Akermanprogress
07/01/2024Energy Code Compliance InspectionsJeff Akermanprogress
07/01/2024Air barrier - visual inspectionJeff Akermanenergy_progress
07/01/2024Fenestration air leakageJeff Akermanenergy_progress
07/01/2024Lighting in dwelling unitsJeff Akermanenergy_progress
Latest 25 of 86.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Panda Nail SalonPersonal servicesCellar, Floor 1
Project M01175111 Alteration · LOC Issued · 02/12/2025
Oasis Men's SpaPersonal servicesSub-basement, Floor 1
Project M01076833 Alteration · LOC Issued · 07/07/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 207 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch21
09/06/2026M00098302-I1Request digital key ↗
08/29/2026M00899829-I1Request digital key ↗
08/29/2026M00899829-P1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00373915-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00373917-I1Request digital key ↗
▸Applications & Permits21
▸BISWORK PERMIT APPLICATION12
08/27/2021140916141Open ↗
07/13/2021140916141Open ↗
08/19/2020140930410Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
08/02/2022140916141Open ↗
07/01/2022140916141Open ↗
07/06/2021140916141Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications92
▸DOB NOWSpecial Inspector Seal & Signature30
09/23/2026M01048390-I1Open ↗
09/01/2026M00899783-P1Open ↗
09/01/2026M00899783-P1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/23/2026M01048390-I1Open ↗
09/02/2026M00098302-I1Open ↗
09/02/2026M00098302-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/06/2026M01048390-I1Open ↗
09/04/2026M00373917-I1Open ↗
08/29/2026M00899829-P1Open ↗
Showing 3 of 24 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/02/2020140930410Open ↗
07/16/2020140916141Open ↗
07/14/2020140921224Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/02/2020140930410Open ↗
07/16/2020140916141Open ↗
07/14/2020140921224Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/02/2020140930410Open ↗
07/16/2020140916141Open ↗
07/14/2020140921224Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/16/2009110220378Open ↗
03/20/2008110220378Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/20/2008110220378Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/20/2008110220378Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
07/09/2008110220378Open ↗
06/10/2008110220378Open ↗
▸BISSCHEDULE B - PLUMBING1
03/20/2008110220378Open ↗
▸BISEQUIPMENT USE PERMITS1
09/17/2009110220378Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES3
08/02/2020140930410Open ↗
07/16/2020140916141Open ↗
07/14/2020140921224Open ↗
▸DOB NOWTenant Protection Plan2
09/04/2026M00373917-I1Open ↗
08/13/2026M00373915-I1Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/06/2026M01048390-I1Open ↗
08/29/2026M00899829-P1Open ↗
08/29/2026M00899829-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/20/2008110220378Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
08/02/2020140930410Open ↗
07/16/2020140916141Open ↗
07/14/2020140921224Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/09/2020140930410Open ↗
08/02/2020140930410Open ↗
07/14/2020140921224Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
08/26/2022140916141Open ↗
11/09/2020140930410Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M01047685-I1Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY9
08/26/2022140916141Open ↗
08/26/2022140916141Open ↗
06/30/2022140916141Open ↗
Showing 3 of 9 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
07/15/2020140921224Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/29/2022140916141Open ↗
11/09/2020140930410Open ↗
09/16/2009110220378Open ↗
▸BISFINAL1
07/15/2020140921224Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/20/2008110220378Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT10
08/26/2022140916141Open ↗
11/09/2020140930410Open ↗
08/02/2020140930410Open ↗
Showing 3 of 10 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST2
08/27/2021140916141Open ↗
07/22/2020140921224Open ↗
▸Filing & Intake Forms9
▸BISEFILING JOB APPLICATION COVER SHEET3
08/02/2020140930410Open ↗
07/16/2020140916141Open ↗
07/14/2020140921224Open ↗
▸BISBOROUGH INTAKE FORM3
07/13/2021140916141Open ↗
08/05/2020140930410Open ↗
07/20/2020140921224Open ↗
▸BISADDITIONAL INFORMATION2
08/02/2022140916141Open ↗
07/06/2021140916141Open ↗
▸BISEFILING COVER SHEET1
03/20/2008110220378Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/16/2009110220378Open ↗