← Back
STATEN ISLAND
224 ALBEE AVENUE
STATEN ISLAND · BIN 5177547
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 20 docs
Floor 3Under Construction15p · 1 filing · 20 docs
Floor 2Under Construction18p · 2 filings · 20 docs
Floor 1Under Construction17p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A TECH ENGINEERING NYC, PLLC.308/06/2026
THINK DESIGN ARCHITECTURE203/27/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIGHTWAY RENOVATIONS CORPGeneral Contractor408/06/2026
PERCIBALLI INDUSTRIES INC.General Contractor107/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738308/06/2026
Building Lifecycle
All (57)Filed (5)Permit Issued (4)Objection (18)Special Inspection (30)
08/06/2026
Filed — Full Demolition
FILING FOR MECHANICAL EQUIPMENT FOR PROPOSED DEMOLITION
S01335639-P1
08/05/2026
Permit issued — Mechanical Systems
S01376802-I1-MS
08/05/2026
Permit issued — General Construction
S01376802-I1-FO
08/05/2026
Permit issued — General Construction
S01376802-I1-GC
08/05/2026
Permit issued — General Construction
S01376802-I1-ST
08/05/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
anthony santoro
08/05/2026
Special inspection requirement — Demolition
anthony santoro
06/24/2026
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
06/24/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
anthony santoro
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
06/24/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
06/24/2026
Special inspection requirement — Subgrade Inspections
anthony santoro
06/24/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
anthony santoro
06/24/2026
Special inspection requirement — Metering
anthony santoro
06/24/2026
Special inspection requirement — Lighting controls
anthony santoro
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
06/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
06/24/2026
Special inspection requirement — Structural Wood Frame
anthony santoro
06/24/2026
Special inspection requirement — Maintenance information
anthony santoro
06/24/2026
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
06/24/2026
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
06/24/2026
Special inspection requirement — Interior lighting power
anthony santoro
06/24/2026
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
04/22/2026
Objection raised — Inspections
04/22/2026
Objection raised — Structural
04/22/2026
Objection raised — Accessibility
04/22/2026
Objection raised — Structural
04/22/2026
Objection raised — Zoning
04/22/2026
Objection raised — Zoning
04/22/2026
Objection raised — Zoning
04/22/2026
Objection raised — Other
04/22/2026
Objection raised — Fire_Protection
04/22/2026
Objection raised — Energy
04/22/2026
Objection raised — Zoning
04/22/2026
Objection raised — Other
04/22/2026
Objection raised — Structural
04/22/2026
Objection raised — Scope
04/22/2026
Objection raised — Fire_Protection
04/22/2026
Objection raised — Structural
03/27/2026
Filed — New Building
APPLICATION FILED FOR THE CONSTRUCCTION OF SEMI-ATTACHED 2-FAMILY, 3-STORY RESIDENCE ONE (1) ZONING LOT WITH (4) TAX LOTS. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01376802-S1
03/26/2026
Filed — New Building
APPLICATION FILED FOR THE CONSTRUCCTION OF SEMI-ATTACHED 2-FAMILY, 3-STORY RESIDENCE ONE (1) ZONING LOT WITH (4) TAX LOTS. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01376802-I1
03/24/2026
Special inspection requirement — Fenestration areas
anthony santoro
03/24/2026
Special inspection requirement — Air barrier — testing
anthony santoro
03/24/2026
Special inspection requirement — Insulation placement and R values
anthony santoro
03/24/2026
Special inspection requirement — Air barrier - visual inspection
anthony santoro
03/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
03/24/2026
Special inspection requirement — Fenestration air leakage
anthony santoro
03/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
03/24/2026
Special inspection requirement — Permanent certificate
anthony santoro
03/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
03/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
03/24/2026
Special inspection requirement — Ventilation and air distribution system
anthony santoro
03/23/2026
Special inspection requirement — Footing and Foundation
anthony santoro
01/21/2026
Filed — Full Demolition
FILING FOR MECHANICAL EQUIPMENT FOR PROPOSED DEMOLITION
S01335639-S1
01/21/2026
Objection resolved — Addressed
01/16/2026
Objection raised — Other
12/30/2025
Filed — Full Demolition
FILING FOR MECHANICAL EQUIPMENT FOR PROPOSED DEMOLITION
S01335639-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedRIGHTWAY RENOVATIONS CORP08/05/2026
DOB NOWGeneral ConstructionPermit IssuedRIGHTWAY RENOVATIONS CORP08/05/2026
DOB NOWGeneral ConstructionPermit IssuedRIGHTWAY RENOVATIONS CORP08/05/2026
DOB NOWGeneral ConstructionPermit IssuedRIGHTWAY RENOVATIONS CORP08/05/2026
BIS—ISSUEDWILLIAM L ST. LAURENT07/03/2008
BIS—ISSUEDWILLIAM L ST. LAURENT07/03/2007
BIS—ISSUEDWILLIAM L ST. LAURENT07/07/2006
BIS—ISSUEDN/A08/03/2004
1 project · most recent 03/27/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/27/2026Permit IssuedRIGHTWAY RENOVATIONS CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Gree MULTI18HP230V1C0 10,000 BTU · Heat Pump Outdoor ×1
Rheem ×1
1 project · most recent 03/27/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/27/2026——Storm, Water/Sanitary
1 project · most recent 07/08/2026
General Wiring
FiledStatusContractorScope
07/08/2026Permit IssuedLMS ELECTRICAL CORPGeneral Wiring
1 project · most recent 03/27/2026
Wood
FiledStatusContractorScope
03/27/2026Permit IssuedRIGHTWAY RENOVATIONS CORPWood
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
08/05/2026Structural Stability – Alterations of existing Buildingsanthony santorospecial
08/05/2026Demolitionanthony santorospecial
06/24/2026Electric vehicle service equipment requirementsanthony santoroenergy_progress
06/24/2026Excavations - Sheeting, Shoring, and Bracinganthony santorospecial
06/24/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
06/24/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
06/24/2026Subgrade Inspectionsanthony santorospecial
06/24/2026Subsurface Conditions – Fill Placement & In-Place Densityanthony santorospecial
06/24/2026Meteringanthony santoroenergy_progress
06/24/2026Lighting controlsanthony santoroenergy_progress
06/24/2026Energy Code Compliance Inspectionsanthony santoroprogress
06/24/2026Fire-Resistance Rated Constructionanthony santoroprogress
06/24/2026Structural Wood Frameanthony santoroprogress
06/24/2026Maintenance informationanthony santoroenergy_progress
06/24/2026Duct leakage testing, insulation and designanthony santoroenergy_progress
06/24/2026Protection of exposed foundation insulationanthony santoroenergy_progress
06/24/2026Interior lighting poweranthony santoroenergy_progress
06/24/2026Concrete - Cast-In-Placeanthony santorospecial
03/24/2026Fenestration areasanthony santoroenergy_progress
03/24/2026Air barrier — testing anthony santoroenergy_progress
03/24/2026Insulation placement and R valuesanthony santoroenergy_progress
03/24/2026Air barrier - visual inspectionanthony santoroenergy_progress
03/24/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
03/24/2026Fenestration air leakageanthony santoroenergy_progress
03/24/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
Latest 25 of 35.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026S01335639-I1Request digital key ↗
08/17/2026S01335639-S1Request digital key ↗
08/17/2026S01335639-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026S01376802-I1Open ↗
08/13/2026S01376802-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01376802-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026S01376802-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWSpecial Inspector Seal & Signature12
09/26/2026S01335639-P1Open ↗
09/26/2026S01335639-P1Open ↗
08/26/2026S01335639-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026S01335639-S1Open ↗
08/17/2026S01335639-I1Open ↗
08/17/2026S01335639-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026S01376802-I1Open ↗
08/22/2026S01376802-I1Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWElectric Cut-Off1
08/17/2026S01335639-I1Open ↗
▸DOB NOWWater Cut-Off1
08/17/2026S01335639-I1Open ↗
▸DOB NOWGas Cut-Off1
08/17/2026S01335639-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/17/2026S01335639-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026S01376802-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/17/2026S01376802-I1Open ↗
08/13/2026S01376802-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026S01376802-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026S01335639-I1Open ↗
08/17/2026S01335639-P1Open ↗
▸DOB NOWRodent Control1
08/17/2026S01335639-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01376802-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S01376802-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S01376802-I1Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification3
08/17/2026S01335639-I1Open ↗
08/17/2026S01335639-P1Open ↗
08/17/2026S01376802-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/17/2026S01335639-I1Open ↗
▸DOB NOWStructure Photographs1
08/17/2026S01335639-P1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01376802-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01376802-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/17/2026S01335639-I1Open ↗