2 Open Violations 0 unresolved · 2 paperwork only▸
ECB07/09/2026PSWO AND ECB VIOLATION ISSUED FOR ELECTRICAL WORK IN PROGRESS AT 1ST, 2ND FLOOR AND BASEMENT W/O PERMIT. OBSERVED NEW CABLES IN CEILING AND WALLS FOR LIGHTS, SWITCHES AND OUTLETS. ALSO NEW PANEL BOX INSTALLED.Hearing held — result not yet published$50 proposed
ECB07/09/2026PSWO AND ECB VIOLATION ISSUED FOR PLUMBING WORK IN PROGRESS W/O PERMIT. OBSERVED FROM 1ST FLOOR TO BASEMENT LEVEL NEW WATER AND WASTE LINES INSTALLED IN BATHROOMS AND KITCHEN. STOP ALL PLUMBING WORK., OBTAIN ALHearing held — result not yet published
Two stories - detached, small or mid-size · 3,000 sf lot · 0.53 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.