← Back
BuildNYC
Zoned residential, not Manhattan
224 BEACH 28TH STREET
QUEENS · BIN 4615264
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R5Zoning
0 sfGross Floor Area
0Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Zoned residential, not Manhattan · Owner of record: 204B LLC · 52,380 sf lot · 0 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofWalton DevelopersUnder Construction99p · 1 filing · 20 docs
BulkheadWalton DevelopersUnder Construction1p · 1 filing · 20 docs
Floor 6Walton DevelopersUnder Construction100p · 1 filing · 20 docs
Floor 5Walton DevelopersUnder Construction84p · 1 filing · 20 docs
Floor 4Walton DevelopersUnder Construction81p · 1 filing · 20 docs
Floor 3Walton DevelopersUnder Construction93p · 1 filing · 20 docs
Floor 2Walton DevelopersUnder Construction101p · 1 filing · 20 docs
Floor 1Walton DevelopersUnder Construction109p · 1 filing · 20 docs
Site & exteriorWalton DevelopersUnder Construction101p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Walton Developers3310/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/29/2025$4.5M—BEACH 28 LLC → 204B LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Express Filing1403/21/2026
Advanced Builders Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Innovative Construction NYCGeneral Contractor607/02/2026
CS BridgeScaffold207/08/2026
Prime Piping & HeatingFire Protection207/08/2026
Rightway Plumbing and HeatingFire Protection107/08/2026
Innovative Construction NYCScaffold106/27/2026
N Tech Design of AmericaGeneral Contractor107/08/2026
Best Mechanical ServicesPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161209/04/2026
Shahrish Shuvo Engineering8524110/23/2025
Building Lifecycle
All (145)Filed (17)Permit Issued (14)Signed Off (8)Violation (5)Inspection (8)Objection (60)Special Inspection (30)Tax Incentive (3)
04/01/2027
485-x construction completed
10/08/2026
Signed off — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
Q01261189-S9
10/07/2026
Objection resolved — Resolved
10/05/2026
Objection raised — Other
09/04/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
Q01261189-P8
09/03/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Air barrier continuity plan testing
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Vestibules
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Air barrier — testing
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
09/03/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
09/02/2026
Signed off — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
Q01261189-S4
09/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/01/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
09/01/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/01/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/25/2026
Signed off — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
Q01261189-S3
08/24/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
08/24/2026
Special inspection requirement — Standpipe Systems
SHAHRIAR QUAYYUM
08/24/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/12/2026
Signed off — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
Q01261189-Z2
08/12/2026
Signed off — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
Q01261189-Z3
08/10/2026
Signed off — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
Q01261189-S5
07/31/2026
Signed off — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
Q01261189-S8
07/21/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
Q01261189-P6
07/16/2026
Special inspection requirement — Standpipe Systems
SHAHRIAR QUAYYUM
07/16/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
07/16/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
07/02/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
Q01261189-P5
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/30/2026
Permit issued — General Construction
Q01261189-I1-GC
06/23/2026
Violation issued (ECB, closed)
Unknown
06/23/2026
Violation issued (ECB, closed)
Construction
06/23/2026
Violation issued (ECB, closed)
Unknown
06/23/2026
Violation issued (ECB, open)
Construction
06/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/08/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/20/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
Q01261189-P4
05/20/2026
Permit issued — General Construction
Q01261189-I1-GC
04/30/2026
Permit issued — Support of Excavation
Q01261189-S9-SE
04/24/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/22/2026
485-x registration filed
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedInnovative Construction NYC06/30/2026
DOB NOWGeneral ConstructionPermit IssuedInnovative Construction NYC05/20/2026
DOB NOWSupport of ExcavationSigned-offInnovative Construction NYC04/30/2026
DOB NOWPlumbingPermit IssuedBest Mechanical Services04/20/2026
DOB NOWProtection and Mechanical MethodsSigned-offCS Bridge04/17/2026
DOB NOWSupported ScaffoldPermit IssuedCS Bridge04/17/2026
DOB NOWStandpipePermit IssuedRightway Plumbing and Heating04/14/2026
DOB NOWSprinklersPermit IssuedAmb Mechanical03/31/2026
DOB NOWStandpipePermit IssuedAmb Mechanical03/31/2026
DOB NOWMechanical SystemsSigned-offInnovative Construction NYC02/27/2026
DOB NOWEarth WorkSigned-offInnovative Construction NYC02/25/2026
DOB NOWStructuralSigned-offInnovative Construction NYC02/24/2026
DOB NOWFull DemolitionSigned-offN Tech Design of America01/29/2026
DOB NOWConstruction FenceSigned-offInnovative Construction NYC12/17/2025
1 project · most recent 09/04/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/04/2026Permit IssuedInnovative Construction NYCHeating and Air Conditioning Systems
Heat / Cool
Amana PTH093J30 9,000 BTU · Ptac ×71
PTH153J30 14,400 BTU · Ptac ×36
PTH123J30 11,600 BTU · Ptac ×18
PTH073J30 7,000 BTU · Ptac ×15
Daikin RZA18AAVJU 20,600 BTU · Condensing Unit ×1
1 project · most recent 09/04/2026
Sprinkler System
FiledStatusContractorScope
09/04/2026Permit IssuedRightway Plumbing and HeatingSprinkler System
1 project · most recent 09/04/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/04/2026Permit IssuedRightway Plumbing and HeatingGas, Storm, Water/Sanitary
7 projects · most recent 05/13/2026
General Wiring
FiledStatusContractorScope
05/13/2026Permit IssuedNash Electric Services—
05/01/2026Permit IssuedFirst Quality Electrical1 meters, 1 new_meters
04/14/2026Permit IssuedIntelogic Electric—
12/17/2025CancelledM.R. Electrical ServiceGeneral Wiring
12/11/2025Permit IssuedFirst Quality ElectricalGeneral Wiring
12/11/2025Permit IssuedFirst Quality Electrical—
11/27/2025Permit IssuedHivolts ElectricalGeneral Wiring
1 project · most recent 09/04/2026
Concrete
FiledStatusContractorScope
09/04/2026Permit IssuedInnovative Construction NYCConcrete
1 project · most recent 09/04/2026
Earthwork
FiledStatusContractorScope
09/04/2026Permit IssuedInnovative Construction NYCEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/01/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
09/01/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/01/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/08/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/24/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/24/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
09/03/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
09/03/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
09/03/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
09/03/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
09/03/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
09/03/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
09/03/2026VestibulesSHAHRIAR QUAYYUMenergy_progress
09/03/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
09/03/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
09/03/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
09/03/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
09/03/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
09/03/2026Air barrier continuity plan testingSHAHRIAR QUAYYUMenergy_progress
09/03/2026MeteringSHAHRIAR QUAYYUMenergy_progress
09/03/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
09/03/2026Air barrier — testing SHAHRIAR QUAYYUMenergy_progress
09/03/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
09/03/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
09/03/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)SHAHRIAR QUAYYUMspecial
09/03/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
09/03/2026Exterior Insulation and Finish Systems (EIFS)SHAHRIAR QUAYYUMspecial
08/24/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
08/24/2026Standpipe SystemsSHAHRIAR QUAYYUMspecial
08/24/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
08/24/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
Latest 25 of 81.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/18/2026Q01305493-I1Request digital key ↗
08/17/2026Q01261189-S5Request digital key ↗
08/17/2026Q01261189-Z2Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
02/02/2026440827223Open ↗
01/30/2026440827223Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01261189-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01261189-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01261189-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWSpecial Inspector Seal & Signature18
10/06/2026Q01261189-P8Open ↗
10/06/2026Q01261189-P8Open ↗
10/06/2026Q01261189-P8Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/17/2026Q01261189-S4Open ↗
08/17/2026Q01261189-P3Open ↗
08/17/2026Q01261189-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
10/06/2026Q01261189-P8Open ↗
10/06/2026Q01261189-P8Open ↗
09/23/2026Q01261189-S3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026Q01305493-I1Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWElectric Cut-Off1
08/13/2026Q01305493-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q01305493-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01305493-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01305493-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026Q01261189-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01261189-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01261189-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/17/2026Q01261189-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/17/2026Q01261189-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01305493-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q01305493-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q01261189-P2Open ↗
08/13/2026Q01261189-S4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01261189-S4Open ↗
▸DOB NOWTR5 Test Report1
08/17/2026Q01261189-S4Open ↗
▸Other Documents9
▸DOB NOWAdjoining Owners Notification2
08/17/2026Q01261189-S9Open ↗
08/13/2026Q01261189-S4Open ↗
▸DOB NOWProperty Ownership Certification2
08/18/2026Q01305493-I1Open ↗
08/17/2026Q01261189-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q01305493-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01305493-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01305493-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01261189-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01261189-I1Open ↗