← Back
One story retail building
224 BRIGHTON BEACH AVE
BROOKLYN · BIN 3245032
💬 Discuss this project
1927Year Built
1Stories
K1Building Class
R6Zoning
12,713 sfGross Floor Area
10Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: BRIGHTON 224 LLC · 12,713 sf lot · 1 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction26p · 3 filings · 20 docs
Floor 1Under Construction56p · 5 filings · 20 docs
CellarUnder Construction29p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BW 450 ST MARKS1207/08/2026
LAUNDRY CAPITAL707/08/2026
RW 705 FRANKLIN3507/08/2026
ZKW ENTERPRISES INC.503/22/2026
LUSTAN REALTY203/22/2026
LUSTER REALTY CORP103/22/2026
LUSTAR REALTY203/22/2026
BRISTOL ASSOC403/22/2026
BRISTON ASSOC503/21/2026
224 BRIGHTON BEACH AVENUE103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/17/2020$8.0M—BRISTOL ASSOCIATES LLC. → BRIGHTON 224 LLC$629/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CA ENGINEERING, LLC403/17/2026
NASIR J, KHANZADA LLC510/03/2025
Z & T ENGINEERING, P.C.207/11/2025
ALLEN SHINFELD, P.E. PLLC802/05/2025
ALPHA HOME DESIGN LLC208/09/2024
FANG ARCHITECT402/27/2024
ASR ENGINEERING PC109/29/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHIEL, LLC2003/21/2026
NASIR J. KHANZADA LLC1003/21/2026
FANG ARCHITECT203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE DESIGN & BUILD INCGeneral Contractor607/08/2026
ZKW ENTERPRISES INCGeneral Contractor303/21/2026
NEPTUNE SIGNS AWNINGSScaffold307/08/2026
MEGA ART HOME IMPROVEMENTGeneral Contractor207/08/2026
HIT POINT 7 INCGeneral Contractor207/08/2026
GREGG NY PLUMBING, INCPlumbing207/08/2026
S V PLBG & HTG INCPlumbing106/28/2026
MEDRA EXHAUST SYSTEMS CORGeneral Contractor107/08/2026
HERNANDEZ, LElectrical103/21/2026
JONG HYUN KIMElectrical103/22/2026
M&L SIGNS INCElectrical103/21/2026
EVANS, DWAYNEElectrical103/21/2026
AP PLUMBING & HVAC LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALLEN SHINFELD, P.E. PLLC13051003/17/2026
NASIR J. KHANZADA LLC1527510/03/2025
YAN GAO6619208/09/2024
FANG ARCHITECT5513602/27/2024
Building Lifecycle
All (116)Filed (26)Permit Issued (17)Signed Off (10)Violation (13)Inspection (16)Objection (34)
03/17/2026
Filed — Alteration
NEW PLUMBING WORK TYPE FILED IN CONJUNCTION WITH GC APPLICATION. NEW PLUMBING FIXTURES TO BE FILED AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01127501-P4
02/17/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/03/2026
Filed — Alteration
NEW PLUMBING WORK TYPE FILED IN CONJUNCTION WITH GC APPLICATION. NEW PLUMBING FIXTURES TO BE FILED AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01127501-P3
01/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/26/2025
Permit issued — Plumbing
B01127501-S1-PL
12/19/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/03/2025
Filed — Alteration
PLUMBING FILLING INCONJUNCTION WITH ALT-2 FILLING FOR INTERIOR RENOVATION APPLICATION # B01190971-I1.
B01190971-P2
08/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/22/2025
Signed off — Alteration
NEW PLUMBING WORK TYPE FILED IN CONJUNCTION WITH GC APPLICATION. NEW PLUMBING FIXTURES TO BE FILED AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01127501-I1
07/22/2025
Signed off — Alteration
INSTALLATION OF KITCHEN HOOD AND MECHANICAL EXHAUST SYSTEM FORCOMMERCIAL COOKING AT 1ST FLOOR AS PER PLAN IN CONJUNCTIONWITH FIRE SUPPRESSION (ANSUL) SYSTEM TO BE FILED WITH FDNY.NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01127594-I1
07/11/2025
Filed — Alteration
INSTALLATION OF KITCHEN HOOD AND MECHANICAL EXHAUST SYSTEM FORCOMMERCIAL COOKING AT 1ST FLOOR AS PER PLAN IN CONJUNCTIONWITH FIRE SUPPRESSION (ANSUL) SYSTEM TO BE FILED WITH FDNY.NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01127594-P1
07/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/02/2025
Permit issued — Plumbing
B01190971-S1-PL
06/30/2025
Permit issued — Mechanical Systems
B01190971-S2-MS
05/14/2025
Filed — Alteration
PLUMBING FILLING INCONJUNCTION WITH ALT-2 FILLING FOR INTERIOR RENOVATION APPLICATION # B01190971-I1.
B01190971-P1
05/05/2025
Objection resolved — Addressed
05/01/2025
Objection raised — Admin
04/30/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/22/2025
Filed — Alteration
PLUMBING FILLING INCONJUNCTION WITH ALT-2 FILLING FOR INTERIOR RENOVATION APPLICATION # B01190971-I1.
B01190971-S2
04/04/2025
Objection raised — Structural
04/04/2025
Objection resolved — Addressed
04/04/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/19/2025
Objection resolved — Addressed
03/19/2025
Objection resolved — Addressed
03/19/2025
Objection resolved — Addressed
03/17/2025
Objection raised — Plumbing
03/17/2025
Objection raised — Inspections
03/17/2025
Objection raised — Plumbing
03/14/2025
Objection raised — Structural
03/14/2025
Objection raised — Scope
03/14/2025
Objection raised — Cost
03/14/2025
Objection raised — Fire_Protection
03/10/2025
Filed — Alteration
PLUMBING FILLING INCONJUNCTION WITH ALT-2 FILLING FOR INTERIOR RENOVATION APPLICATION # B01190971-I1.
B01190971-S1
03/07/2025
Filed — Alteration
PLUMBING FILLING INCONJUNCTION WITH ALT-2 FILLING FOR INTERIOR RENOVATION APPLICATION # B01190971-I1.
B01190971-I1
02/11/2025
Signed off — Alteration
FILE PLUMBING WORK FOR AN EATING AND DRINKING ESTABLISHMENT AT CELLAR AND FIRST FLOOR. THIS APPLICATION IS TO SUPERSEDE B00956602-S1 DUE TO FILING ISSUE WITH THE SAME SCOPE OF WORK
B00956602-I1
02/11/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2025
Permit issued — Mechanical Systems
B00956602-I1-MS
02/05/2025
Filed — Alteration
NEW PLUMBING WORK TYPE FILED IN CONJUNCTION WITH GC APPLICATION. NEW PLUMBING FIXTURES TO BE FILED AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01127501-P1
02/05/2025
Filed — Alteration
NEW PLUMBING WORK TYPE FILED IN CONJUNCTION WITH GC APPLICATION. NEW PLUMBING FIXTURES TO BE FILED AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01127501-P2
01/21/2025
Signed off — Alteration
FILE PLUMBING WORK FOR AN EATING AND DRINKING ESTABLISHMENT AT CELLAR AND FIRST FLOOR. THIS APPLICATION IS TO SUPERSEDE B00956602-S1 DUE TO FILING ISSUE WITH THE SAME SCOPE OF WORK
B00956602-S3
01/17/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/25/2024
Permit issued — Plumbing
B01127501-S1-PL
11/18/2024
Permit issued — Mechanical Systems
B01127594-I1-MS
11/18/2024
Permit issued — General Construction
B01127501-I1-GC
11/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/30/2024
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
10/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/28/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
10/18/2024
Filed — Alteration
NEW PLUMBING WORK TYPE FILED IN CONJUNCTION WITH GC APPLICATION. NEW PLUMBING FIXTURES TO BE FILED AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01127501-I1
10/18/2024
Filed — Alteration
INSTALLATION OF KITCHEN HOOD AND MECHANICAL EXHAUST SYSTEM FORCOMMERCIAL COOKING AT 1ST FLOOR AS PER PLAN IN CONJUNCTIONWITH FIRE SUPPRESSION (ANSUL) SYSTEM TO BE FILED WITH FDNY.NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01127594-I1
10/18/2024
Filed — Alteration
NEW PLUMBING WORK TYPE FILED IN CONJUNCTION WITH GC APPLICATION. NEW PLUMBING FIXTURES TO BE FILED AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01127501-S1
08/20/2024
Violation issued (FDNY_ORDER, closed)
08/09/2024
Filed — Alteration
FILE PLUMBING WORK FOR AN EATING AND DRINKING ESTABLISHMENT AT CELLAR AND FIRST FLOOR. THIS APPLICATION IS TO SUPERSEDE B00956602-S1 DUE TO FILING ISSUE WITH THE SAME SCOPE OF WORK
B00956602-P3
07/23/2024
Permit issued — Plumbing
B00956602-S3-PL
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedGREGG NY PLUMBING, INC12/26/2025
DOB NOWPlumbingPermit IssuedS V PLBG & HTG INC07/02/2025
DOB NOWMechanical SystemsPermit IssuedMEDRA EXHAUST SYSTEMS COR06/30/2025
DOB NOWMechanical SystemsSigned-offHIT POINT 7 INC02/10/2025
DOB NOWPlumbingPermit IssuedGREGG NY PLUMBING, INC11/25/2024
DOB NOWMechanical SystemsSigned-offMEGA ART HOME IMPROVEMENT11/18/2024
DOB NOWGeneral ConstructionSigned-offMEGA ART HOME IMPROVEMENT11/18/2024
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG07/23/2024
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC04/11/2024
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC04/11/2024
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC04/11/2024
DOB NOWMechanical SystemsSigned-offHIT POINT 7 INC12/21/2023
DOB NOWSidewalk ShedSigned-offZKW ENTERPRISES INC10/06/2022
DOB NOWGeneral ConstructionSigned-offCORE DESIGN & BUILD INC08/01/2022
DOB NOWConstruction FenceSigned-offCORE DESIGN & BUILD INC08/01/2022
DOB NOWConstruction FenceSigned-offCORE DESIGN & BUILD INC05/03/2022
DOB NOWGeneral ConstructionSigned-offCORE DESIGN & BUILD INC04/11/2022
BISOTISSUEDACE CONSTRUCTION10/26/2007
BISOTISSUEDMONTANA ELECTRICAL DECORATING CO02/13/2004
BISOTISSUEDBABEL DESIGN INC08/22/2003
BISMHISSUEDM & Y SHEET METAL CORP08/07/2000
BISPLISSUEDALJER PLBG & HTG CORP05/11/1999
BISMHISSUEDAIRCRAFT AIR COND CORP05/07/1999
BISOTISSUEDAIRCRAFT AIR COND CORP04/21/1999
2 projects · most recent 10/03/2025
Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/03/2025Permit IssuedMEDRA EXHAUST SYSTEMS CORVentilation Systems
Ventilation
— 56JN95 85 CFM · Exhaust Fan ×1
08/09/2024Signed-offHIT POINT 7 INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin DFH0604D000001SAA 5 tons · Rooftop Unit ×1
DFH0601D000001S 5 tons · Rooftop Unit ×1
Ventilation
Hoodmart N/A 5,400 CFM · Kitchen Exhaust ×1
1 project · most recent 08/09/2024
Sprinkler System
FiledStatusContractorScope
08/09/2024——Sprinkler System
3 projects · most recent 03/17/2026
Gas Water/Sanitary Plumbing-Sprinkler
FiledStatusContractorScope
03/17/2026Permit IssuedGREGG NY PLUMBING, INCGas, Water/Sanitary
10/03/2025Permit IssuedS V PLBG & HTG INCGas, Water/Sanitary
08/09/2024Signed-offAP PLUMBING & HVAC LLCGas, Plumbing-Sprinkler, Water/Sanitary
8 projects · most recent 05/23/2025
General Wiring
FiledStatusContractorScope
05/23/2025CompleteMAC ELECT'L CONTR. INC.General Wiring
03/21/2024CompleteJONG HYUN KIM—
03/21/2024CompleteJONG HYUN KIM—
03/21/2024CompleteJONG HYUN KIM—
01/16/2024CompleteY.S ELECTRICGeneral Wiring
10/06/2022Permit IssuedRICHARD NEU—
05/27/2022CompleteRONART ELECTRIC CO7 meters, 3 new_meters
06/29/2020CompleteKINGS ELECTRIC CO., INC.—
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
02/17/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/19/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/30/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/11/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
10/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/28/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
04/24/2024Pass-Final Sign Permit InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
03/19/2026Energy Code Compliance InspectionsALLEN SHINFELDprogress
03/19/2026Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
03/11/2026Energy Code Compliance InspectionsALLEN SHINFELDprogress
03/11/2026Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
01/21/2026Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
01/21/2026Energy Code Compliance InspectionsALLEN SHINFELDprogress
09/16/2025Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
05/13/2025Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
04/15/2025Mechanical SystemsNasir Khanzadaspecial
04/15/2025FinalNasir Khanzadaprogress
04/14/2025FinalFei Zengprogress
04/14/2025Mechanical SystemsALLEN SHINFELDspecial
04/14/2025Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
04/14/2025Fire-Resistance Rated ConstructionALLEN SHINFELDprogress
04/14/2025Energy Code Compliance InspectionsALLEN SHINFELDprogress
02/05/2025FinalALLEN SHINFELDprogress
02/05/2025Energy Code Compliance InspectionsALLEN SHINFELDprogress
02/05/2025Interior lighting powerALLEN SHINFELDenergy_progress
02/05/2025Maintenance informationALLEN SHINFELDenergy_progress
02/05/2025Lighting controlsALLEN SHINFELDenergy_progress
02/05/2025Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
02/05/2025Fire-Resistance Rated ConstructionALLEN SHINFELDprogress
01/27/2025Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
01/27/2025Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
01/27/2025Energy Code Compliance InspectionsALLEN SHINFELDprogress
Latest 25 of 49.
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/30/2026B00690391-P1Request digital key ↗
08/30/2026B00690391-I1Request digital key ↗
08/30/2026B00661730-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/19/2007310026584Open ↗
▸BISWORK PERMIT APPLICATION1
10/26/2007310026584Open ↗
▸Seals & Professional Certifications68
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/30/2026B00690391-I1Open ↗
08/26/2026B00956602-I1Open ↗
08/26/2026B00956602-P3Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/20/2026B00956602-S1Open ↗
09/20/2026B00956602-S1Open ↗
09/18/2026B01127501-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/20/2026B00956602-S1Open ↗
09/18/2026B01127501-P1Open ↗
09/01/2026B01190971-S2Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/25/2008310026584Open ↗
01/14/2008310026584Open ↗
09/19/2007310026584Open ↗
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
08/30/2026B00690391-I1Open ↗
08/26/2026B00956602-S3Open ↗
08/26/2026B00956602-P3Open ↗
Showing 3 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/19/2007310026584Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00690391-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/25/2008310026584Open ↗
01/18/2008310026584Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/19/2007310026584Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/26/2007310026584Open ↗