RoofUnder Construction31p · 3 filings · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
FIT-OUT OF OCCUPIED ROOF FOR PASSIVE RECREATION. NO CHANGE TO FLOOR AREA. NO CHANGE TO BUILDING ENVELOPE. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
On file for this project
5 documents · 2 drawing sheets
Renovation of a six-story building. Second floor through the sixth floor will be rebuilt with new composite, wood-cold formed steel members while the roof will be reinforced to accommodate a new steel dunnage and the new roof layout.
On file for this project
50 documents
INSTALLING NEW SPLIT SYSTEMS INTO RESIDENTIAL UNITS. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
On file for this project
26 documents
Floor 656p · 5 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Renovation of a six-story building. Second floor through the sixth floor will be rebuilt with new composite, wood-cold formed steel members while the roof will be reinforced to accommodate a new steel dunnage and the new roof layout.
On file for this project
50 documents
INSTALLING NEW SPLIT SYSTEMS INTO RESIDENTIAL UNITS. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
On file for this project
26 documents
PROPOSE TO RENOVATE EXISTING APT UNITS 5 & 6 ON 4TH FLOOR, APT UNITS 7 AND 8 ON 5TH FLOOR, & APT UNITS 9 & 10 ON 6TH FLOOR WITH INTERIOR PARTITION, FINISH WORKS, RELOCATED KITCHENS AND BATHROOMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
17 documents
Latest 3 of 5 filings on this floor.
Floor 556p · 5 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Renovation of a six-story building. Second floor through the sixth floor will be rebuilt with new composite, wood-cold formed steel members while the roof will be reinforced to accommodate a new steel dunnage and the new roof layout.
On file for this project
50 documents
INSTALLING NEW SPLIT SYSTEMS INTO RESIDENTIAL UNITS. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
On file for this project
26 documents
PROPOSE TO RENOVATE EXISTING APT UNITS 5 & 6 ON 4TH FLOOR, APT UNITS 7 AND 8 ON 5TH FLOOR, & APT UNITS 9 & 10 ON 6TH FLOOR WITH INTERIOR PARTITION, FINISH WORKS, RELOCATED KITCHENS AND BATHROOMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
17 documents
Latest 3 of 5 filings on this floor.
Floor 457p · 5 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Renovation of a six-story building. Second floor through the sixth floor will be rebuilt with new composite, wood-cold formed steel members while the roof will be reinforced to accommodate a new steel dunnage and the new roof layout.
On file for this project
50 documents
INSTALLING NEW SPLIT SYSTEMS INTO RESIDENTIAL UNITS. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
On file for this project
26 documents
PROPOSE TO RENOVATE EXISTING APT UNITS 5 & 6 ON 4TH FLOOR, APT UNITS 7 AND 8 ON 5TH FLOOR, & APT UNITS 9 & 10 ON 6TH FLOOR WITH INTERIOR PARTITION, FINISH WORKS, RELOCATED KITCHENS AND BATHROOMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
17 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 354p · 5 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
PROPOSED PLUMBING WORKS IN CONJUNCTION WITH GC # M00802101-I1. WORKS INCLUDE NEW BATHROOMS, KITCHENS FOR COMBINED UNITS (#1 & 2) ON 2ND FLOOR, & UNIT #3 & 4. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
14 documents · 3 drawing sheets
Renovation of a six-story building. Second floor through the sixth floor will be rebuilt with new composite, wood-cold formed steel members while the roof will be reinforced to accommodate a new steel dunnage and the new roof layout.
On file for this project
50 documents · 1 drawing sheet
INSTALLING NEW SPLIT SYSTEMS INTO RESIDENTIAL UNITS. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
On file for this project
26 documents
Latest 3 of 5 filings on this floor.
Floor 248p · 5 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
PROPOSED PLUMBING WORKS IN CONJUNCTION WITH GC # M00802101-I1. WORKS INCLUDE NEW BATHROOMS, KITCHENS FOR COMBINED UNITS (#1 & 2) ON 2ND FLOOR, & UNIT #3 & 4. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
14 documents
Renovation of a six-story building. Second floor through the sixth floor will be rebuilt with new composite, wood-cold formed steel members while the roof will be reinforced to accommodate a new steel dunnage and the new roof layout.
On file for this project
50 documents · 1 drawing sheet
INSTALLING NEW SPLIT SYSTEMS INTO RESIDENTIAL UNITS. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
On file for this project
26 documents
Latest 3 of 5 filings on this floor.
Floor 17p · 3 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Additions/Modifications to existing mechanical system. INSTALLING NEW SPLIT SYSTEMS (2) IN KITCHEN. INSTALLING EXHAUST FAN FOR RESTROOM. INSTALLING NEW SPLIT SYSTEM TO SERVE DINING ROOM. No change to use, egress, or occupancy.
On file for this project
20 documents
Propose new plumbing work includes new piping, fixtures, domestic, and sanitary water line @ cellar and 1st FL as per plan in conjunction with gas application#M00887441. No change in use, egress and occupancy.
On file for this project
9 documents
New Gas lines for a proposed restaurant @ 1st floor. No change in use, egress and occupancy.
On file for this project
15 documents
Cellar24p · 4 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
PROPOSE PLUMBING WORK FILED IN CONJUNCTION WITH GC JOB # M00803681-I1. SCOPE IS AMMENDED HEREWITH TO ADD A NEW GAS METER TO REPLACE EXISTING METER AND TO ADD (2) NEW 75 GALLON HWH TO REPLACE (1) EXISTING HWH. ALL AMENDED SCOPE IS PROPOSED AT CELLAR LEVEL
On file for this project
16 documents
Additions/Modifications to existing mechanical system. INSTALLING NEW SPLIT SYSTEMS (2) IN KITCHEN. INSTALLING EXHAUST FAN FOR RESTROOM. INSTALLING NEW SPLIT SYSTEM TO SERVE DINING ROOM. No change to use, egress, or occupancy.
On file for this project
20 documents
Propose new plumbing work includes new piping, fixtures, domestic, and sanitary water line @ cellar and 1st FL as per plan in conjunction with gas application#M00887441. No change in use, egress and occupancy.
On file for this project
9 documents
Latest 3 of 4 filings on this floor.
Site & exterior4p · 1 filing · 2 docs
ElectricalEquipment
Issued Permit Scope
Sidewalk Shed
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
On file for this project
2 documents · 4 drawing sheets