Large suburban residence
224 RENSSELAER AVENUE
STATEN ISLAND · BIN 5175547
💬 Discuss this project
2023Year Built
2Stories
A3Building Class
R3XZoning
5,227 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Large suburban residence · 8,000 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNew 2 Story 2 Family Residence1p · 1 filing · 20 docs
Floor 2New 2 Story 2 Family Residence49p · 2 filings · 20 docs
Floor 1Zoning and curb work50p · 4 filings · 20 docs
CellarNew 2 Story 2 Family Residence37p · 1 filing · 20 docs
BasementNew 2 Story 2 Family Residence47p · 2 filings · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Think Design Architecture1104/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Porto ConstructionGeneral Contractor807/08/2026
Paul Toth ExcavationScaffold307/08/2026
Porto ConstructionScaffold207/08/2026
Charles J. Dehart JR P&HPlumbing207/08/2026
JFR ConstructionPlumbing107/08/2026
Paul Toth ExcavationGeneral Contractor206/28/2022
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738604/23/2026
Building Lifecycle
07/06/2026
Signed off — New Building
Application is filed for the construction of a new (2) story (zoning), (3) story (code) (2) family residential building with built in 2 car garage on a 1 zoning lot W/ 1 tax lots. All work as per plans submitted herewith. New c/o to be issued
S00687094-I1
05/15/2026
Special inspection requirement — Masonry
anthony santoro
05/15/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
05/15/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
anthony santoro
69 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offPorto Construction04/08/2025
DOB NOWCurb CutSigned-offPorto Construction04/08/2025
DOB NOWPlumbingSigned-offCharles J. Dehart JR P&H11/04/2024
DOB NOWPlumbingSigned-offJFR Construction06/17/2024
DOB NOWGeneral ConstructionPermit IssuedPorto Construction08/10/2023
DOB NOWConstruction FenceSigned-offPorto Construction08/09/2023
DOB NOWPlumbingSigned-offCharles J. Dehart JR P&H04/04/2023
DOB NOWGeneral ConstructionPermit IssuedPorto Construction03/21/2023
DOB NOWConstruction FenceSigned-offPaul Toth Excavation05/27/2022
DOB NOWConstruction FenceSigned-offPaul Toth Excavation04/08/2022
BISEQISSUEDPaul Toth Excavation06/28/2022
BIS—ISSUEDPaul Toth Excavation06/28/2022
1 project · most recent 04/23/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
04/23/2026Permit IssuedPorto ConstructionAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 04/23/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/23/2026Signed-offCharles J. Dehart JR P&HGas, Storm, Water/Sanitary
1 project · most recent 12/28/2024
General Wiring
FiledStatusContractorScope
12/28/2024CompleteRidge ElectricGeneral Wiring
1 project · most recent 04/23/2026
Concrete Wood
FiledStatusContractorScope
04/23/2026Signed-offCharles J. Dehart JR P&HConcrete, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/15/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
11/12/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/05/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/21/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2023No Access-Final PL - Up to 9 Requested FloorsNo AccessView ↗
11/09/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 138
DateRequirementInspectorRole
05/15/2026Concrete - Cast-In-Placeanthony santorospecial
05/15/2026Masonryanthony santorospecial
05/15/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
05/15/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
05/15/2026Subsurface Conditions – Fill Placement & In-Place Densityanthony santorospecial
05/15/2026Mechanical Systemsanthony santorospecial
05/15/2026Subgrade Inspectionsanthony santorospecial
05/15/2026Energy Code Compliance Inspectionsanthony santoroprogress
05/15/2026Structural Wood Frameanthony santoroprogress
05/15/2026Fire-Resistance Rated Constructionanthony santoroprogress
05/15/2026Finalanthony santoroprogress
05/15/2026Footing and Foundationanthony santoroprogress
05/15/2026Interior lighting poweranthony santoroenergy_progress
05/15/2026Permanent certificateanthony santoroenergy_progress
05/15/2026Ventilation and air distribution systemanthony santoroenergy_progress
05/15/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
05/15/2026Air barrier - visual inspectionanthony santoroenergy_progress
05/15/2026Protection of exposed foundation insulationanthony santoroenergy_progress
05/15/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
05/15/2026Insulation placement and R valuesanthony santoroenergy_progress
05/15/2026Maintenance informationanthony santoroenergy_progress
05/15/2026Duct leakage testing, insulation and designanthony santoroenergy_progress
05/15/2026Meteringanthony santoroenergy_progress
05/15/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
05/15/2026Fireplacesanthony santoroenergy_progress
Latest 25 of 138.
141 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account