DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB12/01/2024FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB08/02/2024FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB05/02/2024FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
ECB04/25/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#901644.REM:SUBMIT ACCEPTABLE REQUIRED T$1K due
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
ECB04/14/202327-929.1 FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGNPROFESSIONAL IN OFFICE BLDG 100 FT OR MORE IN HEIGHT IN EXISTENCE ON$10K due
DOB02/22/2023FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
DOB12/01/2021FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
DOB06/02/2021FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB02/02/2020FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB11/02/2019FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB09/03/2019FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
DOB08/02/2019FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
ECB07/31/2019FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS/FACADE AND APPURTENANCES. EXP1: NORTH ELEVATION OBSERVED BROKEN WINDOW PANE AT FIRE TOWER. CRACK WINDOW PANE AT BULKHEAD ROOF ALSO AT ROOF CRACK AND DAMAGED JOINT AT$1K due
DOB05/02/2019FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
ECB01/16/2019FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES. NOTE:-EXPOSURE#1 NORTH ELEVATION:-I OBSERVED BROKEN WINDOW PANE ON 16TH FL;SPALLING MASONRY BALCONY BEAMS AT SEVERAL FLOORS. EXPOSURE#4 WEST ELEV.$1K due
ECB07/03/2024A. C. 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORNothing owed — awaiting certificate of correction
ECB12/17/202127-929.1 AC27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OFAUTOMATIC SPRINKLERS&FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BLDG 100' OR MORE IN HT IN EXISTENCE ONothing owed — awaiting certificate of correction
ECB12/03/201927-929.1 A.C. 27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BUILDINNothing owed — awaiting certificate of correction
ECB09/19/2014FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28-302 & THE DEPT OF BLDGS RULES & REGULATNothing owed — awaiting certificate of correction
ECB12/30/2006HAZARDOUS. B4B,BQ9,50A,B. 50A- CHIMNEY CONST OF WRONG MATERIAL. 50B- CHIMNEY MUST EXTEND OVER PEAK OF BLDG B4B-HAZARDOUS CONDITION PRODUCTS OF CONST GOING IN 2 FL WINDOWS BQ9-NO PLANS OR PERMITS W/ DOB APPROVALNothing owed — awaiting certificate of correction