← Back
Two family brick
2240 CEDAR AVENUE
BRONX · BIN 2015083
💬 Discuss this project
1910Year Built
2Stories
B1Building Class
R5Zoning
4,032 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Two family brick · 2,500 sf lot · 1.61 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Roof1p · 1 filing · 16 docs
Floor 33p · 1 filing · 3 docs
Floor 23p · 1 filing · 3 docs
Floor 14p · 2 filings · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC203/05/2026
FRANKLYN ESTRELLA ARCHITECT PLLC103/31/2022
PIRO STUDIO LLC109/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JANCO BUILDING CONSULTANTS, LLC.203/21/2026
PATRIOT ENERGY SOLUTIONS CORP403/21/2026
FRANKLYN ESTRELLA ARCHITECT PLLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PATRIOT ENERGY SOL COGeneral Contractor303/21/2026
ALBERT MENDOZAGeneral Contractor107/08/2026
IPS PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116203/05/2026
PIRO STUDIO LLC7503109/01/2021
Building Lifecycle
All (21)Filed (4)Permit Issued (3)Violation (2)Objection (3)Special Inspection (9)
03/09/2026
Objection raised — Other
03/05/2026
Filed — Alteration
X01099077-P1
06/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
06/17/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
06/17/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
06/17/2025
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
09/23/2024
Permit issued — Solar
X01099077-I1-SL
08/21/2024
Filed — Alteration
X01099077-I1
08/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
08/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
08/20/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
08/20/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
08/20/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
10/24/2022
Permit issued — General Construction
X00704916-I1-GC
04/18/2022
Objection raised — Other
04/18/2022
Objection resolved — Addressed
03/31/2022
Filed — Alteration
RESTORE TO IT'S ORIGINAL CONDITION, REMOVE EXTERIOR STRUCTURE ATTACHEDTO THE BUILDING, TO CURE VIOLATION 35592236X & 100821CMTFMB01ALL AS PER PLANS FILED HEREWITH.
X00704916-I1
01/05/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/08/2021
Violation issued (ECB, open)
Construction
09/23/2021
Permit issued — Plumbing
X00585818-I1-PL
09/01/2021
Filed — Alteration
Plumbing application to install new bathroom (lav,toilet, shower),new washer/dryer, sink and change boiler in first floor.install new bathroom (lav, toilet, shower) and relocate plumbing fixture(stove, sink, lav, toilet, shower), add new bathtub in second
X00585818-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedPATRIOT ENERGY SOL CO09/23/2024
DOB NOWGeneral ConstructionPermit IssuedALBERT MENDOZA10/24/2022
DOB NOWPlumbingPermit IssuedIPS PLUMBING CORP09/23/2021
1 project · most recent 09/01/2021
Gas Water/Sanitary
FiledStatusContractorScope
09/01/2021Permit IssuedIPS PLUMBING CORPGas, Water/Sanitary
1 project · most recent 08/19/2024
FiledStatusContractorScope
08/19/2024CompleteMAK ELECTRICAL CONTR CORP2 meters
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/17/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
06/17/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
06/17/2025FinalVYACHESLAV NECHAYEVprogress
06/17/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
08/20/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
08/20/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
08/20/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
08/20/2024FinalVYACHESLAV NECHAYEVprogress
08/20/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026X00585818-I1Request digital key ↗
08/17/2026X01099077-P1Request digital key ↗
08/17/2026X01099077-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026X01099077-P1Open ↗
09/01/2026X01099077-P1Open ↗
09/01/2026X01099077-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026X00585818-I1Open ↗
08/24/2026X00704916-I1Open ↗
08/17/2026X01099077-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X01099077-P1Open ↗
08/28/2026X01099077-I1Open ↗
08/28/2026X01099077-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026X00585818-I1Open ↗
08/17/2026X01099077-P1Open ↗
08/17/2026X01099077-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01099077-I1Open ↗