2022Year Built
4Stories
W3Building Class
R3AZoning
81,849 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
School or academy · Owner of record: FRIENDS OF NEW WORLD PREP, INC. · 60,240 sf lot · 1.36 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof13p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 37p · 1 filing · 20 docs
Floor 28p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Mezzanine5p · 1 filing · 20 docs
Cellar4p · 2 filings · 20 docs
Basement13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW WORLD PREP8507/08/2026
JRM CONSTRUCTION MGMT203/22/2026
118 STREET REALTY LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RAMPULLA ASSOCIATES ARCHITECTS2303/21/2026
BSGNY1003/21/2026
KD DESIGNS303/21/2026
EA DESIGN GROUP603/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
PATUXENT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SISCA NORTHEAST ASSOCIATEGeneral Contractor3407/08/2026
VANQUISH GROUP INCGeneral Contractor807/08/2026
SRCC CORPGeneral Contractor507/08/2026
REGAL RECONSTRUCTION CORP.General Contractor407/08/2026
FLUID MECHANICS CORPFire Protection407/08/2026
FLUID MECHANICS CORPPlumbing307/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor307/08/2026
ADVANCED SCAFFOLD SER.LLCGeneral Contractor303/21/2026
EMPIRE LIC ELECL CONTRSElectrical203/22/2026
EMES SOLAR INCGeneral Contractor104/09/2026
DHS FRACO LLCGeneral Contractor107/08/2026
DONATO, INCPlumbing107/08/2026
DAVID CONSTRUCTING NY, INGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BABYLON ECO-CONSTRUCTION9687108/18/2025
VERTICAL V-NORTHEAST, INC17942005/06/2025
RAMPULLA ASSOCIATES ARCHI429204/14/2025
KZ ENGINEERING, P.C.4665202/07/2024
HANSEN ENGINEERING PC8174401/12/2024
Building Lifecycle
All (243)Filed (43)Permit Issued (50)Signed Off (21)Violation (6)Inspection (13)Objection (80)Special Inspection (30)
06/05/2026
Signed off — Alteration
S01251733-I1
01/23/2026
Signed off — Alteration
mechanical work as per plans
S00463244-S5
10/17/2025
Permit issued — Solar
S01251733-I1-SL
09/11/2025
Signed off — Alteration
mechanical work as per plans
S00463244-S2
08/18/2025
Filed — Alteration
S01251733-I1
08/18/2025
Violation issued (FDNY_NOV, closed)
07/07/2025
Special inspection requirement — Energy Code Compliance Inspections
HUSSEIN SAAD
07/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
HUSSEIN SAAD
07/07/2025
Special inspection requirement — Air barrier - visual inspection
HUSSEIN SAAD
07/07/2025
Special inspection requirement — Final
HUSSEIN SAAD
07/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
HUSSEIN SAAD
06/27/2025
Signed off — Alteration
mechanical work as per plans
S00463244-I1
06/10/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/29/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/27/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
S00671309-I1
05/20/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
BRIAN ARONE
05/19/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN ARONE
05/19/2025
Special inspection requirement — Air barrier — testing
BRIAN ARONE
05/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN ARONE
05/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN ARONE
05/19/2025
Special inspection requirement — Vestibules
BRIAN ARONE
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ARONE
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ARONE
05/19/2025
Special inspection requirement — Protection of exposed foundation insulation
BRIAN ARONE
05/19/2025
Special inspection requirement — Sprayed fire-resistant materials
BRIAN ARONE
05/19/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
leonard rampulla
05/19/2025
Special inspection requirement — Fenestration air leakage
BRIAN ARONE
05/19/2025
Special inspection requirement — Insulation placement and R values
BRIAN ARONE
05/19/2025
Special inspection requirement — Air barrier - visual inspection
BRIAN ARONE
05/16/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/15/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
S00842610-I1
05/15/2025
Signed off — Alteration
INSTALLATION OF BACK UP GENERATOR, FUEL AND EXHAUST PIPING.
S00895612-S2
05/15/2025
Objection resolved — Addressed
05/12/2025
Special inspection requirement — Ventilation and air distribution system
BRIAN ARONE
05/12/2025
Special inspection requirement — Heating Systems
BRIAN ARONE
05/12/2025
Special inspection requirement — Shutoff dampers
BRIAN ARONE
05/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ARONE
05/12/2025
Special inspection requirement — Duct leakage testing, insulation and design
BRIAN ARONE
05/12/2025
Special inspection requirement — Mechanical Systems
BRIAN ARONE
05/12/2025
Special inspection requirement — Final
BRIAN ARONE
05/12/2025
Special inspection requirement — Smoke Control Systems Testing
BRIAN ARONE
05/08/2025
Objection resolved — Addressed
05/06/2025
Filed — Alteration
mechanical work as per plans
S00463244-A1
05/05/2025
Objection raised — Admin
05/02/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/21/2025
Objection resolved — Addressed
04/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/16/2025
Objection raised — Zoning
04/16/2025
Objection raised — Scope
04/14/2025
Filed — Alteration
mechanical work as per plans
S00463244-P9
04/14/2025
Filed — Alteration
mechanical work as per plans
S00463244-P8
04/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ARONE
04/09/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
leonard rampulla
04/03/2025
Signed off — Alteration
INSTALLATION OF BACK UP GENERATOR, FUEL AND EXHAUST PIPING.
S00895612-S1
03/20/2025
Signed off — Alteration
mechanical work as per plans
S00463244-S1
03/13/2025
Filed — Alteration
mechanical work as per plans
S00463244-P7
03/13/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
03/05/2025
Signed off — Alteration
Application filed for underpinning as per plans filed herewith
S00711007-I1
02/25/2025
Permit issued — Foundation
S00711007-I1-FO
Latest 60 of 243 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offEMES SOLAR INC10/17/2025
DOB NOWFoundationSigned-offSISCA NORTHEAST ASSOCIATE02/25/2025
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ02/13/2025
DOB NOWCurb CutPermit IssuedSISCA NORTHEAST ASSOCIATE02/12/2025
DOB NOWCurb CutPermit IssuedSISCA NORTHEAST ASSOCIATE02/12/2025
DOB NOWCurb CutPermit IssuedSISCA NORTHEAST ASSOCIATE02/12/2025
DOB NOWPlumbingSigned-offFLUID MECHANICS CORP12/26/2024
DOB NOWStandpipeSigned-offFLUID MECHANICS CORP11/07/2024
DOB NOWSprinklersSigned-offFLUID MECHANICS CORP11/07/2024
DOB NOWGeneral ConstructionSigned-offSISCA NORTHEAST ASSOCIATE10/15/2024
DOB NOWFoundationSigned-offSISCA NORTHEAST ASSOCIATE09/24/2024
DOB NOWSupported ScaffoldSigned-offADVANCED SCAFFOLD SER.LLC07/25/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC04/09/2024
DOB NOWConstruction FenceSigned-offSISCA NORTHEAST ASSOCIATE03/20/2024
DOB NOWGeneral ConstructionSigned-offSISCA NORTHEAST ASSOCIATE03/13/2024
DOB NOWPlumbingSigned-offFLUID MECHANICS CORP02/28/2024
DOB NOWGeneral ConstructionSigned-offSISCA NORTHEAST ASSOCIATE01/24/2024
DOB NOWMechanical SystemsSigned-offDAVID CONSTRUCTING NY, IN01/22/2024
DOB NOWMechanical SystemsSigned-offSISCA NORTHEAST ASSOCIATE01/03/2024
DOB NOWGeneral ConstructionSigned-offSISCA NORTHEAST ASSOCIATE12/29/2023
DOB NOWGeneral ConstructionSigned-offSISCA NORTHEAST ASSOCIATE11/21/2023
DOB NOWSupported ScaffoldSigned-offSRCC CORP11/15/2023
DOB NOWStructuralSigned-offSISCA NORTHEAST ASSOCIATE11/15/2023
DOB NOWMechanical SystemsSigned-offSISCA NORTHEAST ASSOCIATE11/15/2023
DOB NOWConstruction FenceSigned-offSISCA NORTHEAST ASSOCIATE11/14/2023
DOB NOWFoundationSigned-offSISCA NORTHEAST ASSOCIATE11/14/2023
DOB NOWStandpipeSigned-offFLUID MECHANICS CORP07/20/2023
DOB NOWStandpipeSigned-offFLUID MECHANICS CORP07/20/2023
DOB NOWMechanical SystemsSigned-offSISCA NORTHEAST ASSOCIATE07/19/2023
DOB NOWGeneral ConstructionSigned-offSISCA NORTHEAST ASSOCIATE06/21/2023
DOB NOWSidewalk ShedSigned-offSRCC CORP06/05/2023
DOB NOWSupported ScaffoldSigned-offSRCC CORP05/30/2023
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC04/28/2023
DOB NOWConstruction FenceSigned-offSISCA NORTHEAST ASSOCIATE03/14/2023
DOB NOWSupport of ExcavationSigned-offSISCA NORTHEAST ASSOCIATE02/24/2023
DOB NOWPlumbingSigned-offFLUID MECHANICS CORP02/15/2023
DOB NOWFoundationSigned-offSISCA NORTHEAST ASSOCIATE02/15/2023
DOB NOWStructuralSigned-offSISCA NORTHEAST ASSOCIATE02/03/2023
DOB NOWGeneral ConstructionSigned-offSISCA NORTHEAST ASSOCIATE02/03/2023
DOB NOWConstruction FenceSigned-offSISCA NORTHEAST ASSOCIATE12/12/2022
+ 11 more permits on file
5 projects · most recent 09/05/2024
General Wiring
FiledStatusContractorScope
09/05/2024CompleteB.P. ELECTRIC CORP—
05/24/2023CompleteEMPIRE LIC ELECL CONTRSGeneral Wiring
05/01/2023CompleteNASH ELECTRIC SERVICES IN—
08/03/2022CompleteDIFALZO ELECTRIC NY, INCGeneral Wiring
12/10/2021CompleteV ELECTRIC NY INC1 meters, 1 new_meters
1 project · most recent 06/10/2022
FiledStatusContractorScope
06/10/2022——1 scope_items
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
06/10/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/29/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/02/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/13/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
01/02/2025Pass-Final SD - Up to 9 Requested FloorsPassView ↗
01/02/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
01/22/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/17/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/17/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/27/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 114
DateRequirementInspectorRole
07/07/2025Energy Code Compliance InspectionsHUSSEIN SAADprogress
07/07/2025FinalHUSSEIN SAADprogress
07/07/2025Air barrier - visual inspectionHUSSEIN SAADenergy_progress
07/07/2025Fire-Resistant Penetrations and JointsHUSSEIN SAADspecial
07/07/2025Structural Stability – Alterations of existing buildingsHUSSEIN SAADspecial
05/19/2025Insulation placement and R valuesBRIAN ARONEenergy_progress
05/19/2025Energy Code Compliance InspectionsBRIAN ARONEprogress
05/19/2025Fire-Resistance Rated ConstructionBRIAN ARONEprogress
05/19/2025Sprayed fire-resistant materialsBRIAN ARONEspecial
05/19/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationleonard rampullaspecial
05/19/2025Structural Stability – Alterations of existing buildingsBRIAN ARONEspecial
05/19/2025Fire-Resistant Penetrations and JointsBRIAN ARONEspecial
05/19/2025Subsurface Investigations (Borings/Test Pits)BRIAN ARONEspecial
05/19/2025Air barrier — testing BRIAN ARONEenergy_progress
05/19/2025Air barrier - visual inspectionBRIAN ARONEenergy_progress
05/19/2025VestibulesBRIAN ARONEenergy_progress
05/19/2025Fenestration and door U-factor and product ratingsBRIAN ARONEenergy_progress
05/19/2025Fenestration air leakageBRIAN ARONEenergy_progress
05/19/2025Protection of exposed foundation insulationBRIAN ARONEenergy_progress
05/12/2025Smoke Control Systems TestingBRIAN ARONEspecial
05/12/2025Shutoff dampersBRIAN ARONEenergy_progress
05/12/2025Duct leakage testing, insulation and designBRIAN ARONEenergy_progress
05/12/2025Fire-Resistant Penetrations and JointsBRIAN ARONEspecial
05/12/2025Heating SystemsBRIAN ARONEspecial
05/12/2025Ventilation and air distribution systemBRIAN ARONEenergy_progress
Latest 25 of 114.
▾Documents — 314 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch36
08/25/2026S00592980-I1Request digital key ↗
08/24/2026S00567731-P2Request digital key ↗
08/24/2026S00567731-P1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
08/19/2026S00463244-P3Request digital key ↗
08/15/2026S00463244-I1Request digital key ↗
08/14/2026S00463244-P9Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
08/21/2026S01104232-I1Request digital key ↗
08/20/2026S01109144-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
08/26/2026S00348431-I1Request digital key ↗
08/15/2026S00348431-P1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION10
12/08/2025540197632Open ↗
05/21/2025520460279Open ↗
04/22/2025520460279Open ↗
Showing 3 of 10 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
04/29/2025540197632Open ↗
02/26/2021540197632Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/17/2025520460279Open ↗
▸BISWORK PERMIT APPLICATION1
04/23/2025520460279Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZoning Exhibit form (1-5)3
08/19/2026S00463244-P3Open ↗
08/15/2026S00463244-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/19/2026S00463244-P3Open ↗
08/15/2026S00463244-I1Open ↗
Showing 2 of 3 on file for this type
▸BISZONING DIAGRAM2
08/09/2021520460279Open ↗
08/03/2021520460279Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/09/2021520460279Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/21/2021520460279Open ↗
▸BISVERIFY TAX LOT1
06/13/2025520460279Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/13/2025520460279Open ↗
▸Seals & Professional Certifications135
▸DOB NOWSpecial Inspector Seal & Signature58
09/27/2026S00463244-I1Open ↗
09/27/2026S00463244-I1Open ↗
09/27/2026S00463244-I1Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature43
08/25/2026S00592980-I1Open ↗
08/24/2026S00567731-I1Open ↗
08/24/2026S00567731-P2Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature32
09/27/2026S00463244-I1Open ↗
09/27/2026S00463244-I1Open ↗
09/27/2026S00463244-I1Open ↗
Showing 3 of 32 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/26/2021540197632Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/26/2021540197632Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/19/2026S00463244-P3Open ↗
08/15/2026S00463244-I1Open ↗
Showing 2 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
01/23/2026520460279Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/18/2025520460279Open ↗
▸BISSTREET TREE CHECKLIST1
03/09/2021520460279Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026S00592980-I1Open ↗
08/24/2026S00659820-P1Open ↗
08/24/2026S00659820-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance5
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/09/2021520460279Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
09/11/2025520460279Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/09/2021520460279Open ↗
07/21/2021520460279Open ↗
03/09/2021520460279Open ↗
▸DOB NOWSOIL REPORT3
08/19/2026S00463244-P3Open ↗
08/15/2026S00463244-I1Open ↗
Showing 2 of 3 on file for this type
▸BISSOIL REPORT1
07/01/2021520460279Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
02/26/2021540197632Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs48
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter38
08/25/2026S00592980-I1Open ↗
08/24/2026S00567731-P2Open ↗
08/24/2026S00567731-P1Open ↗
Showing 3 of 38 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
05/21/2025520460279Open ↗
04/22/2025520460279Open ↗
07/22/2021520460279Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/09/2021520460279Open ↗
03/09/2021520460279Open ↗
02/05/2021520460279Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
04/29/2025540197632Open ↗
02/26/2021540197632Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026S01251733-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISINSURANCE: LIABILITY1
04/18/2025520460279Open ↗
▸BISINSURANCE: WORKERS' COMPENSATION1
04/18/2025520460279Open ↗
▸BISINSURANCE: DISABILITY1
04/18/2025520460279Open ↗
▸DOB NOWCertificate of Insurance1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertification by Insurance Broker or Agency1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION4
12/19/2025540197632Open ↗
04/29/2025540197632Open ↗
03/21/2023540197632Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
02/05/2021520460279Open ↗
▸BISEFILING COVER SHEET1
02/05/2021520460279Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/26/2021540197632Open ↗
▸Other Documents22
▸DOB NOWPlot Diagram6
08/19/2026S00463244-P3Open ↗
08/15/2026S00463244-I1Open ↗
Showing 2 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
03/21/2023540197632Open ↗
02/26/2021540197632Open ↗
02/26/2021540197632Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/19/2026S00463244-P3Open ↗
08/15/2026S00463244-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWSite Survey: Initial3
08/15/2026S00463244-I1Open ↗
Showing 1 of 3 on file for this type
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form2
12/19/2025540197632Open ↗
04/29/2025540197632Open ↗
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLOCAL LAW - SUPPPORTING DOCUMENTATION1
03/09/2021520460279Open ↗
▸BISPLOT DIAGRAM1
03/09/2021520460279Open ↗
▸DOB NOWAdditional Insured Authorizations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type