← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
2241 FREDERICK DOUGLASS BOULEVARD
MANHATTAN · BIN 1086186
💬 Discuss this project
2003Year Built
8Stories
RMBuilding Class
R8AZoning
100,359 sfGross Floor Area
76Units
LL97 CoveredRent Stabilized46 Active Violations 43 unresolved · 3 paperwork only 12 old, status unconfirmed ▸FISP: UNSAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Kyrous Realty Group · 20,570 sf lot · 4.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofOutrigger system installation for facade repairsUnder Construction2p · 3 filings · 20 docs
Floor 7Arriet Tubman Garden Condo.1p · 1 filing · 5 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Spear Physical Therapy68p · 5 filings · 20 docs
CellarNHE Management Associates, LLC1p · 1 filing · 11 docs
Site & exteriorSpearUnder Construction21p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HT Commerical Realty5703/21/2026
NYC Department of Housing Preservation and Development1303/21/2026
Harriet Tubman Gardens Condos703/21/2026
HT Development403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates803/21/2026
Boyd Consulting403/21/2026
Melanie Rivera103/21/2026
Just Architecture203/21/2026
Reliable Expediting103/21/2026
Xinos Construction203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold507/08/2026
Agir Electrical Ltd D/B/AElectrical303/21/2026
Xinos ConstructionScaffold307/10/2026
L.S. Sign Cospecialty_contractor207/08/2026
LW Interior RemodelingGeneral Contractor204/09/2026
Xinos ConstructionGeneral Contractor207/29/2026
Bruche Mechanical NYFire Protection107/08/2026
DNA Plumbing ContractorsPlumbing107/08/2026
Orbit SprinklerFire Protection107/08/2026
Peter A Frankini P & HPlumbing107/08/2026
Plumbing P & HPlumbing107/08/2026
Tower ElectricElectrical103/21/2026
Top Plumbing and HeatingPlumbing107/08/2026
Farella MichaelElectrical103/21/2026
LTC Electrical ContractingElectrical103/21/2026
Farella ElectricElectrical103/21/2026
P & Z ElectricElectrical103/21/2026
MCC ContractorGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Queens Engineering8898608/04/2026
Antonucci & Associates, A2115306/30/2026
Norman C. Lok818204/28/2026
Spivak Architects6957412/18/2025
Catalpa Special Inspectio2004612/18/2025
MEP Inspections1102212/16/2025
Momentum Design Consultan9893106/05/2025
Building Lifecycle
All (169)Filed (24)Permit Issued (22)Signed Off (8)Facade (FISP) (7)Violation (60)Inspection (14)Objection (4)Special Inspection (30)
10/08/2026
Permit issued — Suspended Scaffold
M01314319-I1-SC
08/04/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01170243-P3
08/04/2026
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
08/03/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
08/03/2026
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
07/29/2026
Filed — Alteration
OUTRIGGERS SYSTEM AND HOIST INSTALLATION FOR FACADE REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01314319-P1
07/28/2026
Permit issued — General Construction
M01230729-I1-GC-CX
07/24/2026
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
07/24/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
07/08/2026
Permit issued — Supported Scaffold
M01170243-I1-SF
06/30/2026
Filed — Alteration
PROPOSED FACADE REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01230729-P2
06/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
Mohammed Baban
06/30/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Robert Antonucci
06/30/2026
Special inspection requirement — Structural Steel - Details
Robert Antonucci
06/30/2026
Special inspection requirement — Post-installed Anchors
Robert Antonucci
06/30/2026
Special inspection requirement — Final
Robert Antonucci
06/30/2026
Special inspection requirement — Structural Steel - Welding
Robert Antonucci
06/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Robert Antonucci
06/30/2026
Special inspection requirement — Masonry
Robert Antonucci
06/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/24/2026
Special inspection requirement — Structural Steel - Welding
Robert Antonucci
06/24/2026
Special inspection requirement — Final
Robert Antonucci
06/24/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Robert Antonucci
06/24/2026
Special inspection requirement — Post-installed Anchors
Robert Antonucci
06/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Robert Antonucci
06/24/2026
Special inspection requirement — Structural Steel - Details
Robert Antonucci
06/24/2026
Special inspection requirement — Masonry
Robert Antonucci
05/19/2026
Signed off — Alteration
INSTALLATION OF (1) HEAT PUMP SCHEDULE.
M01299579-S1
05/16/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/16/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/11/2026
Permit issued — General Construction
M01386301-I1-GC
05/11/2026
Permit issued — General Construction
M01386302-I1-GC
04/28/2026
Filed — Alteration
TWO NON-ILLUMINATED NON-ADVERTISING ACCESSORY AWNINGS - SPEAR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01386301-I1
04/28/2026
Filed — Alteration
TWO NON-ILLUMINATED NON-ADVERTISING ACCESSORY AWNINGS - SPEAR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01386302-I1
04/28/2026
Special inspection requirement — Final
GHANENDRA MISHRA
04/24/2026
Signed off — Alteration
M01299687-I1
04/15/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/14/2026
Signed off — Alteration
INSTALLATION OF (1) HEAT PUMP SCHEDULE.
M01299579-S2
04/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
NORMAN LOK
04/10/2026
Signed off — Alteration
INSTALLATION OF (1) HEAT PUMP SCHEDULE.
M01299579-I1
04/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/10/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/12/2026
Permit issued — Sidewalk Shed
M00679233-I1-SH
01/05/2026
Permit issued — Plumbing
M01299579-S2-PL
12/26/2025
Permit issued — Mechanical Systems
M01299579-S1-MS
12/22/2025
Permit issued — General Construction
M01299579-I1-GC
12/22/2025
Permit issued — Sprinklers
M01299687-I1-EW-SP
12/18/2025
Filed — Alteration
INSTALLATION OF (1) HEAT PUMP SCHEDULE.
M01299579-S1
12/16/2025
Filed — Alteration
M01299687-I1
12/16/2025
Filed — Alteration
INSTALLATION OF (1) HEAT PUMP SCHEDULE.
M01299579-S2
12/16/2025
Filed — Alteration
INSTALLATION OF (1) HEAT PUMP SCHEDULE.
M01299579-I1
12/16/2025
Special inspection requirement — Lighting controls
Howard Spivak
12/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
Howard Spivak
12/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Howard Spivak
12/16/2025
Special inspection requirement — Interior lighting power
Howard Spivak
12/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
Howard Spivak
12/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
Howard Spivak
Latest 60 of 169 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction10/08/2026
DOB NOWGeneral ConstructionPermit IssuedXinos Construction07/28/2026
DOB NOWSupported ScaffoldPermit IssuedXinos Construction07/08/2026
DOB NOWGeneral ConstructionPermit IssuedL.S. Sign Co05/11/2026
DOB NOWGeneral ConstructionPermit IssuedL.S. Sign Co05/11/2026
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding01/12/2026
DOB NOWPlumbingSigned-offTop Plumbing and Heating01/05/2026
DOB NOWMechanical SystemsSigned-offLW Interior Remodeling12/26/2025
DOB NOWGeneral ConstructionSigned-offLW Interior Remodeling12/22/2025
DOB NOWSprinklersSigned-offOrbit Sprinkler12/22/2025
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction11/07/2025
DOB NOWGeneral ConstructionPermit IssuedXinos Construction06/20/2025
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding01/31/2025
DOB NOWSupported ScaffoldPermit IssuedXinos Construction01/24/2025
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding02/06/2024
DOB NOWSprinklersSigned-offBruche Mechanical NY10/24/2023
DOB NOWPlumbingSigned-offDNA Plumbing Contractors05/16/2023
DOB NOWPlumbingSigned-offPlumbing P & H03/15/2023
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding02/10/2023
DOB NOWGeneral ConstructionSigned-offMCC Contractor01/30/2023
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding02/14/2022
DOB NOWPlumbingSigned-offPeter A Frankini P & H08/27/2021
BISOTISSUEDDNA Plumbing Contractors06/01/2023
BISEQISSUEDEverest Scaffolding04/08/2021
BISOTISSUEDKnockout Renovations Services04/05/2021
BISPLISSUEDProcore Mechanical07/10/2020
BISOTISSUEDCreo Projects07/01/2020
BISPLISSUEDProto P & H Services08/01/2019
BISOTISSUEDCrafted Interiors Design06/07/2019
BISSPISSUEDBruche Mechanical NY03/18/2019
BISPLISSUEDPlumbing P & H02/21/2019
BIS—ISSUEDUgb Construction02/08/2019
BISEQISSUEDEverest Scaffolding08/06/2018
BISPLISSUEDD.D.S. Mechanical PBG & Heating05/04/2018
BISOTISSUEDGlobal Green Energy09/05/2017
BISEQISSUEDEverest Scaffolding08/11/2017
BISSPISSUEDDDS Mechanical FPS09/27/2016
BISSPISSUEDDDS Mechanical FPS09/27/2016
BISEQISSUEDEverest Scaffolding08/08/2016
BISSPISSUEDTMS Plumbing & Heating08/04/2016
+ 32 more permits on file
1 project · most recent 12/18/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/18/2025Signed-offLW Interior RemodelingHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PURY-EP72TNU-A1 80,000 BTU · Vrf Outdoor ×1
8 projects · most recent 04/30/2026
General Wiring
FiledStatusContractorScope
04/30/2026CompleteLTC Electrical ContractingGeneral Wiring
01/08/2026CompleteP & Z ElectricGeneral Wiring
07/23/2025Permit IssuedTower Electric—
04/30/2024Permit IssuedBorowide Elect'l Contractors—
01/16/2024CompleteMechanical Construction SystemsGeneral Wiring
02/17/2023CompleteJoseph Weinstein ElectricGeneral Wiring
11/01/2021CompletePaul VerardiGeneral Wiring
01/28/2021Permit IssuedEssex ElectricGeneral Wiring
1 project · most recent 06/30/2026
FiledStatusContractorScope
06/30/2026Permit IssuedXinos Construction3 scope_items
2 projects · most recent 07/29/2026
Suspended Scaffold Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/29/2026Permit IssuedXinos ConstructionSuspended Scaffold
12/18/2025Signed-offTop Plumbing and HeatingTenant Protection Plan 72 Hour
1 project · most recent 07/29/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/29/2026Permit IssuedXinos ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
04/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/06/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/02/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/25/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/27/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
08/04/2026Post-installed AnchorsANDREAS CHRISTOFOROUspecial
08/03/2026Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
08/03/2026Post-installed AnchorsANDREAS CHRISTOFOROUspecial
07/24/2026Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
07/24/2026Post-installed AnchorsANDREAS CHRISTOFOROUspecial
06/30/2026Structural Steel - High Strength BoltingRobert Antonuccispecial
06/30/2026Structural Steel - DetailsRobert Antonuccispecial
06/30/2026MasonryRobert Antonuccispecial
06/30/2026FinalRobert Antonucciprogress
06/30/2026Tenant Protection Plan ComplianceMohammed Babanspecial
06/30/2026Structural Stability – Alterations of existing buildingsRobert Antonuccispecial
06/30/2026Structural Steel - WeldingRobert Antonuccispecial
06/30/2026Post-installed AnchorsRobert Antonuccispecial
06/29/2026Tenant Protection Plan Compliance—special
06/24/2026FinalRobert Antonucciprogress
06/24/2026Structural Steel - WeldingRobert Antonuccispecial
06/24/2026Structural Steel - High Strength BoltingRobert Antonuccispecial
06/24/2026Structural Steel - DetailsRobert Antonuccispecial
06/24/2026Structural Stability – Alterations of existing buildingsRobert Antonuccispecial
06/24/2026Post-installed AnchorsRobert Antonuccispecial
06/24/2026MasonryRobert Antonuccispecial
04/28/2026FinalGHANENDRA MISHRAprogress
04/13/2026Tenant Protection Plan ComplianceNORMAN LOKspecial
12/16/2025HVAC-R and service water heating equipmentHoward Spivakenergy_progress
12/16/2025Lighting controlsHoward Spivakenergy_progress
Latest 25 of 64.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
SpearUnknown—
Project M01386301 Alteration · Permit Entire · 04/28/2026
Project M01386302 Alteration · Permit Entire · 04/28/2026
Spear Physical TherapyMedical / HealthcareFloor 1
Project M01299579 Alteration · LOC Issued · 12/16/2025
Project M01299687 Alteration · LOC Issued · 12/16/2025
Arriet Tubman Garden CondoResidentialFloor 7
Project M00377822 Alteration · LOC Issued · 08/12/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 472 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch23
09/02/2026M00787381-I1Request digital key ↗
09/01/2026M00679233-I1Request digital key ↗
09/01/2026M00679233-P1Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00377822-I1Request digital key ↗
▸Applications & Permits63
▸BISPLAN / WORK APPROVAL APPLICATION33
02/19/2025122707936Open ↗
10/09/2024122707936Open ↗
02/08/2024140932506Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION27
06/01/2023140932506Open ↗
04/08/2021140532234Open ↗
04/06/2021140932506Open ↗
Showing 3 of 27 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLL114/19 PERMIT RESTRICTION1
10/14/2020140932506Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/01/2022122707936Open ↗
▸BISVERIFY TAX LOT1
04/22/2022122707936Open ↗
▸Seals & Professional Certifications130
▸DOB NOWSpecial Inspector Seal & Signature39
09/25/2026M01170243-P1Open ↗
09/23/2026M01299579-S1Open ↗
09/23/2026M01170243-I1Open ↗
Showing 3 of 39 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION35
03/26/2020123782781Open ↗
03/26/2020123782781Open ↗
10/22/2019140846912Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/01/2026M00679233-P2Open ↗
09/01/2026M00679233-I1Open ↗
09/01/2026M00679233-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026M01299579-S1Open ↗
09/23/2026M01299579-S1Open ↗
09/01/2026M01230729-P1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
02/14/2019123680383Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/14/2019123680383Open ↗
Showing 1 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
08/25/2020140934050Open ↗
08/13/2020140932506Open ↗
05/09/2019140846912Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/25/2020140934050Open ↗
08/13/2020140932506Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
01/10/2020123782781Open ↗
05/30/2019123782781Open ↗
04/02/2019123417374Open ↗
Showing 3 of 9 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
05/23/2019123408008Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING1
05/09/2019140846912Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
08/01/2022122707936Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes6
10/02/2020140934050Open ↗
09/28/2020140932506Open ↗
05/30/2019123782781Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST4
05/30/2019123782781Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00377822-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/21/2026M01230729-P2Open ↗
08/21/2026M01230729-I1Open ↗
08/13/2026M01299579-S2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/28/2018122707936Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance30
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
03/26/2020123782781Open ↗
10/22/2019140846912Open ↗
08/09/2019123417374Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
10/30/2020123782781Open ↗
10/22/2019140846912Open ↗
08/09/2019123417374Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/30/2020123782781Open ↗
05/21/2019140846912Open ↗
05/09/2019140846912Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/25/2024140932506Open ↗
08/01/2022122707936Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/25/2020140934050Open ↗
08/13/2020140932506Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00787381-I1Open ↗
08/13/2026M00787380-I1Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/25/2024140932506Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
08/25/2020140934050Open ↗
▸BISLIGHTING CONTROLS1
01/25/2024140932506Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY11
01/26/2024140932506Open ↗
01/25/2024140932506Open ↗
03/08/2022140532234Open ↗
Showing 3 of 11 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
05/03/2019122707936Open ↗
▸Approvals, Objections & Sign-offs71
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST42
03/07/2024140932506Open ↗
03/10/2022140532234Open ↗
11/09/2020122707936Open ↗
Showing 3 of 42 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
03/26/2020123782781Open ↗
08/05/2019140532234Open ↗
08/05/2019140532234Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
11/28/2022122707936Open ↗
08/02/2022122707936Open ↗
05/17/2019122707936Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER3
06/01/2023140932506Open ↗
Showing 1 of 3 on file for this type
▸BISSHED LETTER3
04/08/2021140532234Open ↗
Showing 1 of 3 on file for this type
▸BISFINAL2
01/25/2024140932506Open ↗
03/08/2022140532234Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT24
10/30/2020123782781Open ↗
08/25/2020140934050Open ↗
08/13/2020140932506Open ↗
Showing 3 of 24 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/25/2024140932506Open ↗
▸BISOK TO ISSUE ONE TIME TCO PENDING RESOLITION OF OPEN FACADE VIOLATION - AFFIDAVIT ATTACHED1
01/22/2024122707936Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
10/14/2020140932506Open ↗
▸BISOK TO ISSUE TCO PENDING RESOLITION OFOPEN FACADE VIOLATION - AFFIDAVIT ATTACHED1
09/11/2025122707936Open ↗
▸Filing & Intake Forms67
▸BISBOROUGH INTAKE FORM38
06/01/2023140932506Open ↗
04/07/2021140532234Open ↗
04/06/2020123782781Open ↗
Showing 3 of 38 on file for this type
▸BISADDITIONAL INFORMATION15
03/20/2025122707936Open ↗
10/29/2024122707936Open ↗
12/29/2022122707936Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET10
05/30/2019123782781Open ↗
02/14/2019123680383Open ↗
11/14/2018123408008Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/25/2020140934050Open ↗
08/13/2020140932506Open ↗
05/09/2019140846912Open ↗
Showing 3 of 4 on file for this type
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
01/23/2026122707936Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWCalculations2
08/21/2026M01314319-P1Open ↗
08/13/2026M01314319-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/21/2026M01314319-P1Open ↗
08/13/2026M01314319-I1Open ↗
▸BISPRELIMINARY1
01/25/2024140932506Open ↗
▸BISTCO - Supporting Documents1
01/22/2024122707936Open ↗