← Back
Public elementary, junior or senior high
Richmond Preparatory Charter School
2245 RICHMOND AVENUE · New Springville-Willowbrook-Bulls Head-Travis · BIN 5134720
💬 Discuss this project
2000Year Built
2Stories
W1Building Class
R3-2Zoning
54,242 sfGross Floor Area
1Units
4 Open Violations ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: THE ICS FOUNDATION, INC. · 60,700 sf lot · 0.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction49p · 5 filings · 20 docs
Floor 3Under Construction2p · 2 filings · 20 docs
Floor 2Under Construction49p · 9 filings · 20 docs
Floor 1Under Construction43p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ICS FOUNDATION3809/25/2026
RICHMOND PREPARATORY CHARTER SCHOOL408/28/2026
OWNERS REP607/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.3203/21/2026
AE DESIGN SOLUTION403/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAXIMUM CONTRACTING INCGeneral Contractor2607/08/2026
RICHMOND P & H CO., INCPlumbing709/25/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor507/08/2026
FIVE BORO ASSOCIATES INCFire Protection507/08/2026
FICHERA ELECTRIC, INCElectrical303/22/2026
MASTER COOLING SERVICE COGeneral Contractor107/08/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TAMBORRA ARCHITECTURE53392207/24/2026
A TECH ENGINEERING NYC, P6738311/14/2023
Building Lifecycle
All (248)Filed (27)Permit Issued (28)Signed Off (14)Violation (56)Inspection (23)Objection (70)Special Inspection (30)
09/24/2026
Permit issued — Plumbing
S00728129-I1-PL
08/18/2026
Special inspection requirement — Sprinkler Systems
Nicholas Tamborra
07/24/2026
Filed — Alteration
Install 400 new Sprinkler System heads and branch lines that were removed under DOBNOW Permitted Application #S00669304 all within Existing 2 Story Structure Altered under Approved DOBNOW Application #S00671233.
S00728129-P2
07/23/2026
Special inspection requirement — Sprinkler Systems
Nicholas Tamborra
05/18/2026
Signed off — Alteration
Construct 8' High Construction Fence Within Existing Property Line with also (2) Two 16' gates within the property line as per submitted plan.
S00534007-I1
05/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/06/2026
Violation issued (FDNY_NOV, closed)
03/06/2026
Violation issued (FDNY_ORDER, closed)
03/06/2026
Violation issued (FDNY_ORDER, closed)
03/06/2026
Violation issued (FDNY_ORDER, closed)
03/06/2026
Violation issued (FDNY_ORDER, closed)
03/06/2026
Violation issued (FDNY_ORDER, closed)
10/17/2025
Signed off — Alteration
Install New HVAC Equipment and related Ductwork as per submitted plans
S00741106-I1
09/11/2025
Filed — Alteration
Install New HVAC Equipment and related Ductwork as per submitted plans
S00741106-P1
09/05/2025
Violation issued (FDNY_NOV, closed)
08/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/03/2025
Signed off — Alteration
Excavation and Shoring Plan for Proposed Two Story Extension off of Existing Two Story Commercial Structure for Charter School Usage.
S00767555-I1
12/05/2024
Violation issued (FDNY_NOV, closed)
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/12/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/10/2024
Permit issued — Support of Excavation
S00767555-I1-SE
08/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/22/2024
Signed off — Alteration
Remove existing 294 sprinkler heads and branch lines off of existing sprinkler main which is to remain in unoccupied commercial building. All work is part of separately filed and permitted interior partition removal application #S00626869.
S00677031-I1
07/16/2024
Permit issued — Sprinklers
S00728129-I1-PL
07/11/2024
Violation issued (FDNY_NOV, closed)
07/09/2024
Signed off — Alteration
Install new structural steel and related foundations as per submitted plans for Construction of alteration application #S00671233 and related C/O application #S00640757, Submit Revised Structural Plans.
S00756541-I1
07/09/2024
Signed off — Alteration
Install new structural steel and related foundations as per submitted plans for Construction of alteration application #S00671233 and related C/O application #S00640757, Submit Revised Structural Plans.
S00756541-S1
06/25/2024
Signed off — Alteration
INSTALLATION OF INTERIOR STORM WATER DRAIN PIPE, CONCRETE CATCH BASIN, TRENCH DRAINS WITH STEEL GRATE, DRYWELLS & MANHOLES.
S00785533-I1
05/02/2024
Permit issued — Foundation
S00756541-S1-FO
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2024
Signed off — Alteration
Construct New Interior Non-Bearing Partitions within Existing Vacant Commercial building as per submitted Plans on floors 001 and 002, Reframe existing open area on existing 2nd floor with new steel framing and install new interior decorative stair.
S00671233-I1
03/25/2024
Signed off — Alteration
S00626869-I1
02/22/2024
Signed off — Alteration
Submit Revised As-Built Drawings of all Plumbing Fixtures and Roof Drains. Submit Revised Plumbing Drawings to reflect that the Existing 2" Water Service and the Existing 2" RPZ Valve remains as per the original installation from NB Application #500395459
S00722283-I1
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2024
Filed — Alteration
Submit Revised As-Built Drawings of all Plumbing Fixtures and Roof Drains. Submit Revised Plumbing Drawings to reflect that the Existing 2" Water Service and the Existing 2" RPZ Valve remains as per the original installation from NB Application #500395459
S00722283-P4
01/25/2024
Signed off — Alteration
S00774507-I1
01/25/2024
Signed off — Alteration
S00853140-I1
01/09/2024
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/30/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/28/2023
Permit issued — Mechanical Systems
S00741106-I1-MS
11/16/2023
Permit issued — General Construction
S00640757-I1-GC
11/16/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Nicholas Tamborra
11/16/2023
Special inspection requirement — Structural Steel - High Strength Bolting
anthony santoro
11/16/2023
Special inspection requirement — Structural Steel - Welding
anthony santoro
11/16/2023
Special inspection requirement — Subgrade Inspections
Nicholas Tamborra
11/16/2023
Special inspection requirement — Preliminary
Nicholas Tamborra
11/16/2023
Special inspection requirement — Concrete - Cast-In-Place
Nicholas Tamborra
11/16/2023
Special inspection requirement — Final
anthony santoro
11/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tamborra
11/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nicholas Tamborra
11/16/2023
Special inspection requirement — Structural Cold-Formed Steel
anthony santoro
11/16/2023
Special inspection requirement — Structural Steel - Details
anthony santoro
11/14/2023
Filed — Alteration
Install new structural steel and related foundations as per submitted plans for Construction of alteration application #S00671233 and related C/O application #S00640757, Submit Revised Structural Plans.
S00756541-S1
11/14/2023
Filed — Alteration
Install new structural steel and related foundations as per submitted plans for Construction of alteration application #S00671233 and related C/O application #S00640757, Submit Revised Structural Plans.
S00756541-P1
11/06/2023
Filed — Alteration
Submit Revised As-Built Drawings of all Plumbing Fixtures and Roof Drains. Submit Revised Plumbing Drawings to reflect that the Existing 2" Water Service and the Existing 2" RPZ Valve remains as per the original installation from NB Application #500395459
S00722283-P3
11/06/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Nicholas Tamborra
11/06/2023
Special inspection requirement — Final
anthony santoro
11/06/2023
Special inspection requirement — Footing and Foundation
Nicholas Tamborra
11/06/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nicholas Tamborra
Latest 60 of 248 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedRICHMOND P & H CO., INC09/24/2026
DOB NOWSupport of ExcavationSigned-offMAXIMUM CONTRACTING INC10/10/2024
DOB NOWSprinklersPermit IssuedRICHMOND P & H CO., INC07/16/2024
DOB NOWFoundationSigned-offMAXIMUM CONTRACTING INC05/02/2024
DOB NOWMechanical SystemsSigned-offMASTER COOLING SERVICE CO11/28/2023
DOB NOWGeneral ConstructionPermit IssuedMAXIMUM CONTRACTING INC11/16/2023
DOB NOWGeneral ConstructionSigned-offMAXIMUM CONTRACTING INC09/21/2023
DOB NOWStandpipeSigned-offFIVE BORO ASSOCIATES INC08/28/2023
DOB NOWPlumbingSigned-offRICHMOND P & H CO., INC08/08/2023
DOB NOWStructuralSigned-offMAXIMUM CONTRACTING INC07/13/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/10/2023
DOB NOWPlumbingSigned-offRICHMOND P & H CO., INC06/02/2023
DOB NOWStructuralSigned-offMAXIMUM CONTRACTING INC06/01/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC04/03/2023
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC03/28/2023
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC03/23/2023
DOB NOWGeneral ConstructionSigned-offMAXIMUM CONTRACTING INC01/27/2023
DOB NOWConstruction FenceSigned-offMAXIMUM CONTRACTING INC12/08/2022
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC09/05/2022
DOB NOWPlumbingSigned-offRICHMOND P & H CO., INC08/08/2022
DOB NOWStructuralSigned-offMAXIMUM CONTRACTING INC07/16/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/15/2022
DOB NOWStructuralSigned-offMAXIMUM CONTRACTING INC06/02/2022
DOB NOWPlumbingSigned-offRICHMOND P & H CO., INC05/31/2022
DOB NOWPlumbingSigned-offRICHMOND P & H CO., INC03/31/2022
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC02/15/2022
DOB NOWGeneral ConstructionSigned-offMAXIMUM CONTRACTING INC01/07/2022
DOB NOWConstruction FenceSigned-offMAXIMUM CONTRACTING INC11/23/2021
BISOTISSUEDBERGER SIGN FABRICATION INC12/08/2000
BIS—ISSUEDBERGER SIGN FABRICATION INC12/07/2000
BIS—ISSUEDBERGER SIGN FABRICATION INC12/07/2000
BIS—ISSUEDBERGER SIGN FABRICATION INC12/07/2000
BISSPISSUEDRICHMOND PLUMBING & HEATING INC10/27/2000
BISPLISSUEDPREMIER PLBG & HTG SPECIALISTS05/30/2000
BISEQISSUEDM GORDON CONSTRUCTION CO.03/30/2000
BIS—ISSUEDM GORDON CONSTRUCTION CO.03/30/2000
1 project · most recent 01/27/2022
FiledStatusContractorScope
01/27/2022——294 heads
5 projects · most recent 09/08/2022
General Wiring
FiledStatusContractorScope
09/08/2022CompleteFICHERA ELECTRIC, INC1 meters, 1 new_meters
08/30/2022CompleteTUXEDO ELEC'L CONTR'G INC—
07/13/2022CompleteSOLAS ELECTRICAL CORP—
07/07/2022CompleteFICHERA ELECTRIC, INCGeneral Wiring
01/24/2022CompleteFICHERA ELECTRIC, INC—
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
05/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/12/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/09/2024Pass-Final Fence Non-Directive 14PassView ↗
11/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/12/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
09/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/12/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
09/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/07/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/23/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/23/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/10/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/15/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/06/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/17/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/17/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/30/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/10/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
08/18/2026Sprinkler SystemsNicholas Tamborraspecial
07/23/2026Sprinkler SystemsNicholas Tamborraspecial
11/16/2023Finalanthony santoroprogress
11/16/2023Concrete - Cast-In-PlaceNicholas Tamborraspecial
11/16/2023Structural Steel - Weldinganthony santorospecial
11/16/2023Subgrade InspectionsNicholas Tamborraspecial
11/16/2023Structural Cold-Formed Steelanthony santorospecial
11/16/2023Structural Stability – Alterations of existing buildingsNicholas Tamborraspecial
11/16/2023Subsurface Conditions – Fill Placement & In-Place DensityNicholas Tamborraspecial
11/16/2023Energy Code Compliance InspectionsNicholas Tamborraprogress
11/16/2023PreliminaryNicholas Tamborraprogress
11/16/2023Structural Steel - High Strength Boltinganthony santorospecial
11/16/2023Structural Steel - Detailsanthony santorospecial
11/06/2023Subsurface Conditions – Fill Placement & In-Place DensityNicholas Tamborraspecial
11/06/2023Finalanthony santoroprogress
11/06/2023Footing and FoundationNicholas Tamborraprogress
11/06/2023Concrete - Cast-In-PlaceNicholas Tamborraspecial
11/06/2023Structural Stability – Alterations of existing buildingsNicholas Tamborraspecial
11/06/2023Excavations - Sheeting, Shoring, and BracingNicholas Tamborraspecial
10/05/2023FinalRonald Victorioprogress
10/05/2023Sprayed fire-resistant materialsNicholas Tamborraspecial
10/05/2023Concrete - Cast-In-PlaceNicholas Tamborraspecial
10/05/2023Structural Steel - High Strength BoltingNicholas Tamborraspecial
10/05/2023Structural Steel - DetailsNicholas Tamborraspecial
10/05/2023Structural Cold-Formed SteelNicholas Tamborraspecial
Latest 25 of 62.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Interpretation Charter SchoolsEducationFloors 1, 2, Roof
Project S00756541 Alteration · LOC Issued · 06/14/2022
Project S00728129 Alteration · Permit Entire · 05/04/2022
Project S00722283 Alteration · LOC Issued · 04/20/2022
Project S00626869 Alteration · LOC Issued · 11/22/2021
Integration Charter SchoolsEducationFloors 1, 2, Roof
Project S00669304 Alteration · Filing Withdrawn · 01/27/2022
Project S00641244 Alteration · LOC Issued · 12/21/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 156 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch26
08/25/2026S00626869-I1Request digital key ↗
08/24/2026S00677031-I1Request digital key ↗
08/24/2026S00722283-P4Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/15/2026S00825520-I1Request digital key ↗
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
07/19/2023540213053Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00640757-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00640757-I1Open ↗
▸Seals & Professional Certifications68
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/25/2026S00626869-I1Open ↗
08/24/2026S00677031-I1Open ↗
08/24/2026S00722283-P4Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/01/2026S00767555-I1Open ↗
08/31/2026S00756541-S1Open ↗
08/31/2026S00756541-S1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026S00825520-I1Open ↗
08/31/2026S00756541-S1Open ↗
08/31/2026S00756541-S1Open ↗
Showing 3 of 18 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/07/2022540213053Open ↗
07/07/2022540213053Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/07/2022540213053Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00640757-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00640757-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00640757-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00640757-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00640757-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026S00671233-I1Open ↗
08/13/2026S00741106-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00741106-I1Open ↗
▸Inspections & Test Reports4
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
07/07/2022540213053Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/07/2022540213053Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00640757-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00640757-I1Open ↗
▸Approvals, Objections & Sign-offs28
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter25
08/24/2026S00756541-S1Open ↗
08/24/2026S00756541-P1Open ↗
08/24/2026S00756541-I1Open ↗
Showing 3 of 25 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
07/19/2023540213053Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
07/07/2022540213053Open ↗
▸BISPEDRAMP APPROVED LETTER1
07/19/2023540213053Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/07/2022540213053Open ↗
▸Other Documents17
▸DOB NOWPlot Diagram2
08/13/2026S00756541-S1Open ↗
08/13/2026S00640757-I1Open ↗
▸BISWAIVER OF SIDEWALK IN RICHMOND AVE.1
07/19/2023540213053Open ↗
▸BISWAIVER OF STEEL FACED CURBS FOR ALL STREET.1
07/19/2023540213053Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
07/19/2023540213053Open ↗
▸BISWAIVER OF CURB ALIGNMENT IN STEIWAY STREET.1
07/19/2023540213053Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/19/2023540213053Open ↗
▸BISPEDRAMP APPROVED PLAN1
07/19/2023540213053Open ↗
▸BISWAIVER OF CURB ALIGNMENT IN RICHIMOND AVE.1
07/19/2023540213053Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
07/07/2022540213053Open ↗
▸BISWAIVER OF SIDEWALK IN STEINWAY STREET.1
07/19/2023540213053Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/07/2022540213053Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00640757-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00767555-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026S00640757-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S00640757-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00640757-I1Open ↗