← Back
Factory, light manufacturing
2246 FULTON STREET
BROOKLYN · BIN 3042287
💬 Discuss this project
1921Year Built
1Stories
F5Building Class
M1-4/R7DZoning
15,000 sfGross Floor Area
1Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Factory, light manufacturing · Owner of record: 50 SACKMAN LLC · 15,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof149p · 6 filings · 20 docs
Bulkhead1p · 1 filing · 5 docs
Floor 72p · 1 filing · 5 docs
Floor 61p · 1 filing · 5 docs
Floor 5132p · 1 filing · 20 docs
Floor 4131p · 1 filing · 20 docs
Floor 3130p · 1 filing · 20 docs
Floor 2138p · 1 filing · 20 docs
Floor 1149p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LM DEVELOPMENTS3209/01/2026
CONSOLIDATED SCAFFOLDING INC.2407/08/2026
TOT DEVELOPERS3207/08/2026
OWNERS REP304/09/2026
KMI404/09/2026
ON STAR MANAGEMENT303/22/2026
CORE SCAFFOLD SYSTEMS103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/23/2024$11.5M—KINSELLA REALTY INC → 50 SACKMAN LLC$767/sf building
05/23/2024$11.5M—KINSELLA REALTY INC → 50 SACKMAN LLC$767/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPEEDY EXPEDITING6603/21/2026
HIERARCH-E203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ON STAR MANAGEMENT LLCGeneral Contractor1504/09/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor907/08/2026
STRUCTURELINE INCGeneral Contractor507/08/2026
BEST MECHANICAL SVCS INCPlumbing307/08/2026
RIGHTWAY PLBG AND HTG INCFire Protection307/08/2026
HEXAGON INDUSTRIES INCGeneral Contractor304/09/2026
SOLAS ELECTRICAL CORPElectrical203/22/2026
TOVIA WERZBERGERElectrical203/21/2026
POWER DIRECT ELECTRIC INC 005103General Contractor203/22/2026
KMI INCGeneral Contractor104/09/2026
S&R ELECTRICAL & MECHANICElectrical103/22/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56162303/31/2026
MJE CONSULTING ENGINEERIN8522108/27/2024
H & O ENGINEERING, DPC5595105/25/2023
BIG APPLE GROUP NY A RMA9168106/09/2022
Building Lifecycle
All (241)Filed (45)Permit Issued (34)Signed Off (24)Violation (14)Inspection (14)Objection (77)Special Inspection (30)Tax Incentive (3)
07/13/2026
Signed off — New Building
PROPOSED 9 STORY MIXED-USE BUILDING WITH A TOTAL OF 119 DWELLING UNITS, OF WHICH 24 ARE INCLUSIONARY HOUSING UNITS
B00635730-I1
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/29/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/29/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
04/29/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/29/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/29/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/29/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/31/2026
Filed — New Building
PROPOSED 9 STORY MIXED-USE BUILDING WITH A TOTAL OF 119 DWELLING UNITS, OF WHICH 24 ARE INCLUSIONARY HOUSING UNITS
B00635730-B5
03/05/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/05/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
03/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
03/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/05/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
03/05/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/05/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/05/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
11/17/2025
Filed — New Building
PROPOSED 9 STORY MIXED-USE BUILDING WITH A TOTAL OF 119 DWELLING UNITS, OF WHICH 24 ARE INCLUSIONARY HOUSING UNITS
B00635730-B4
11/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
11/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
11/17/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
11/17/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
11/17/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
11/17/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
11/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/17/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/17/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
11/04/2025
Signed off — New Building
PROPOSED 9 STORY MIXED-USE BUILDING WITH A TOTAL OF 119 DWELLING UNITS, OF WHICH 24 ARE INCLUSIONARY HOUSING UNITS
B00635730-S3
10/20/2025
Objection raised — Other
10/20/2025
Objection resolved — Addressed
10/17/2025
Filed — New Building
PROPOSED 9 STORY MIXED-USE BUILDING WITH A TOTAL OF 119 DWELLING UNITS, OF WHICH 24 ARE INCLUSIONARY HOUSING UNITS
B00635730-B3
10/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
10/06/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
10/06/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
09/09/2025
Filed — New Building
PROPOSED 9 STORY MIXED-USE BUILDING WITH A TOTAL OF 119 DWELLING UNITS, OF WHICH 24 ARE INCLUSIONARY HOUSING UNITS
B00635730-A9
06/25/2025
Filed — New Building
PROPOSED 9 STORY MIXED-USE BUILDING WITH A TOTAL OF 119 DWELLING UNITS, OF WHICH 24 ARE INCLUSIONARY HOUSING UNITS
B00635730-A8
05/23/2025
Signed off — New Building
PROPOSED 9 STORY MIXED-USE BUILDING WITH A TOTAL OF 119 DWELLING UNITS, OF WHICH 24 ARE INCLUSIONARY HOUSING UNITS
B00635730-S7
05/19/2025
Signed off — New Building
PROPOSED 9 STORY MIXED-USE BUILDING WITH A TOTAL OF 119 DWELLING UNITS, OF WHICH 24 ARE INCLUSIONARY HOUSING UNITS
B00635730-S4
05/19/2025
Signed off — New Building
PROPOSED 9 STORY MIXED-USE BUILDING WITH A TOTAL OF 119 DWELLING UNITS, OF WHICH 24 ARE INCLUSIONARY HOUSING UNITS
B00635730-S1
05/19/2025
Signed off — Alteration
Installation of temporary air pressurized standpipe system during construction per LL 64/09, in conjunction with NB # B00635730-I1
B00671616-I1
05/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/09/2025
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
05/08/2025
Signed off — New Building
PROPOSED 9 STORY MIXED-USE BUILDING WITH A TOTAL OF 119 DWELLING UNITS, OF WHICH 24 ARE INCLUSIONARY HOUSING UNITS
B00635730-S2
05/07/2025
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
05/02/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/14/2025
Permit issued — Standpipe
B00635730-S7-EW-SD
04/02/2025
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD SHALL COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33
B01126636-S2
04/02/2025
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD SHALL COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33
B01126636-I1
04/02/2025
Signed off — Alteration
INSTALLATION OF A TEMPORARY NEEDLE BEAM SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEEDLE BEAM SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01172953-S2
04/02/2025
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD SHALL COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33
B01126636-S1
04/02/2025
Signed off — Alteration
B01010445-I1
04/02/2025
Signed off — Alteration
INSTALLATION OF A TEMPORARY NEEDLE BEAM SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEEDLE BEAM SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01172953-S1
04/02/2025
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD SHALL COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33
B01126636-S3
04/02/2025
Signed off — Alteration
INSTALLATION OF A TEMPORARY NEEDLE BEAM SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEEDLE BEAM SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01172953-I1
04/02/2025
Signed off — New Building
PROPOSED 9 STORY MIXED-USE BUILDING WITH A TOTAL OF 119 DWELLING UNITS, OF WHICH 24 ARE INCLUSIONARY HOUSING UNITS
B00635730-Z5
03/31/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/31/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 241 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offRIGHTWAY PLBG AND HTG INC04/14/2025
DOB NOWCurb CutSigned-offON STAR MANAGEMENT LLC03/19/2025
DOB NOWSupport of ExcavationSigned-offON STAR MANAGEMENT LLC03/19/2025
DOB NOWMechanical SystemsSigned-offON STAR MANAGEMENT LLC02/10/2025
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING01/29/2025
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING01/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offCONSOLIDATED SCAFFOLDING01/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offCONSOLIDATED SCAFFOLDING01/29/2025
DOB NOWGeneral ConstructionPermit IssuedON STAR MANAGEMENT LLC12/20/2024
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC12/06/2024
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC11/22/2024
DOB NOWProtection and Mechanical MethodsSigned-offKMI11/21/2024
DOB NOWStandpipeSigned-offRIGHTWAY PLBG AND HTG INC11/19/2024
DOB NOWSprinklersSigned-offBEST MECHANICAL SVCS INC11/18/2024
DOB NOWFoundationSigned-offON STAR MANAGEMENT LLC11/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offCONSOLIDATED SCAFFOLDING10/29/2024
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING10/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offCONSOLIDATED SCAFFOLDING10/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offCONSOLIDATED SCAFFOLDING10/16/2024
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING10/16/2024
DOB NOWFoundationSigned-offON STAR MANAGEMENT LLC10/08/2024
DOB NOWStructuralSigned-offON STAR MANAGEMENT LLC10/08/2024
DOB NOWConstruction FenceSigned-offON STAR MANAGEMENT LLC09/26/2024
DOB NOWSupport of ExcavationSigned-offON STAR MANAGEMENT LLC09/26/2024
DOB NOWSprinklersSigned-offRIGHTWAY PLBG AND HTG INC09/24/2024
DOB NOWFull DemolitionSigned-offHEXAGON INDUSTRIES INC08/29/2024
DOB NOWProtection and Mechanical MethodsSigned-offHEXAGON INDUSTRIES INC08/29/2024
DOB NOWConstruction FenceSigned-offHEXAGON INDUSTRIES INC08/22/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC01/09/2024
DOB NOWSupport of ExcavationSigned-offSTRUCTURELINE INC06/06/2023
DOB NOWConstruction FenceSigned-offSTRUCTURELINE INC11/07/2022
DOB NOWFoundationSigned-offSTRUCTURELINE INC05/31/2022
DOB NOWConstruction FenceSigned-offSTRUCTURELINE INC05/26/2022
DOB NOWSupport of ExcavationSigned-offSTRUCTURELINE INC05/26/2022
BISEQISSUEDCONSOLIDATED SCAFFOLDING01/14/2025
BISBLISSUEDEDWARD LUIZER06/03/2003
1 project · most recent 03/31/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/31/2026Signed-offON STAR MANAGEMENT LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin RXSQ36TBVJUB 36,000 BTU · Vrf Outdoor ×121
RXSQ24TBVJUB 24,000 BTU · Heat Pump Outdoor ×1
RXYQ96AATJB 96,000 BTU · Vrf Outdoor ×1
Fraser-Johnston PUZA18NKA7 25,200 BTU · Rooftop Unit ×1
1 project · most recent 03/31/2026
Sprinkler System
FiledStatusContractorScope
03/31/2026Signed-offRIGHTWAY PLBG AND HTG INCSprinkler System
1 project · most recent 03/31/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/31/2026Signed-offBEST MECHANICAL SVCS INCGas, Storm, Water/Sanitary
10 projects · most recent 05/01/2025
General Wiring
FiledStatusContractorScope
05/01/2025CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
04/08/2025CompleteS&R ELECTRICAL & MECHANIC1 meters, 1 new_meters
12/30/2024CompletePOWER DIRECT ELECTRIC INC—
12/27/2024CompleteSOLAS ELECTRICAL CORP—
12/16/2024CompleteSOLAS ELECTRICAL CORP—
11/25/2024CompleteS&R ELECTRICAL & MECHANIC—
11/07/2024CompleteS&R ELECTRICAL & MECHANIC—
01/19/2024CompleteSOLAS ELECTRICAL CORP—
01/12/2024CompleteSOLAS ELECTRICAL CORP—
05/31/2018CompleteWILLDAN ELECTRICAL OF NY—
1 project · most recent 03/31/2026
Concrete
FiledStatusContractorScope
03/31/2026Signed-offRIGHTWAY PLBG AND HTG INCConcrete
1 project · most recent 03/31/2026
Fence
FiledStatusContractorScope
03/31/2026Signed-offRIGHTWAY PLBG AND HTG INCFence
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
05/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/09/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
05/07/2025Pass-Final SD - Fire PumpPassView ↗
05/02/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/31/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/31/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/28/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
03/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/28/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/31/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/24/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
01/24/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
11/13/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/29/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/29/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
04/29/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
04/29/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/29/2026Fenestration areasFAHAD FATEHenergy_progress
04/29/2026Fenestration air leakageFAHAD FATEHenergy_progress
04/29/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/29/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
04/29/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
03/05/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
03/05/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/05/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
03/05/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/05/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
03/05/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
03/05/2026Fenestration areasFAHAD FATEHenergy_progress
03/05/2026Fenestration air leakageFAHAD FATEHenergy_progress
03/05/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
11/17/2025Fenestration areasFAHAD FATEHenergy_progress
11/17/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
11/17/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/17/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
11/17/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
11/17/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
11/17/2025Fenestration air leakageFAHAD FATEHenergy_progress
Latest 25 of 150.
▾Documents — 314 on file (BIS + DOB NOW)
▸Plans & Drawings47
▸DOB NOWPlans/Sketch47
08/31/2026B00671616-I1Request digital key ↗
08/31/2026B00671616-P1Request digital key ↗
08/27/2026B00861833-I1Request digital key ↗
Showing 3 of 47 on file for this type
▸Applications & Permits17
▸DOB NOWHPD - Permit Notice8
08/14/2026B00635730-I1Open ↗
08/13/2026B00635730-I1Open ↗
08/13/2026B00635730-B3Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation4
12/19/2024340831595Open ↗
05/19/2023340831595Open ↗
04/13/2023340831595Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
01/08/2025340915353Open ↗
12/02/2024340831595Open ↗
11/20/2024340831595Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
01/14/2025340915353Open ↗
▸Zoning, Tax Lot & Property Records25
▸DOB NOWZD1: DOB Zoning Diagram10
08/15/2026B00635730-P8Open ↗
08/13/2026B00635730-B4Open ↗
08/13/2026B00635730-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZoning Exhibit form (1-5)10
08/15/2026B00635730-P8Open ↗
08/13/2026B00635730-A9Open ↗
08/13/2026B00635730-A5Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026B00635730-B4Open ↗
08/13/2026B00635730-B5Open ↗
08/13/2026B00635730-I1Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
07/02/2025340831595Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications84
▸DOB NOWDPL-1: Design Professional Seal & Signature47
08/31/2026B00671616-I1Open ↗
08/31/2026B00671616-P1Open ↗
08/24/2026B01010445-I1Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/02/2026B00635730-Z2Open ↗
09/02/2026B00635730-A1Open ↗
08/27/2026B00635730-Z3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/21/2026B00635730-A5Open ↗
09/02/2026B00635730-Z2Open ↗
09/01/2026B00635730-A7Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/14/2025340915353Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/08/2025340915353Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/07/2022340831595Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/08/2025340915353Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/08/2025340915353Open ↗
▸Trade Schedules & Equipment15
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)10
08/15/2026B00635730-P8Open ↗
08/13/2026B00635730-B4Open ↗
08/13/2026B00635730-A5Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWElectric Cut-Off1
08/13/2026B00861833-I1Open ↗
▸DOB NOWWater Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSewer Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/14/2026B00635730-I1—
▸DOB NOWGas Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection17
▸DOB NOWStreet Tree Checklist10
08/22/2026B00635730-A8Open ↗
08/22/2026B00635730-B4Open ↗
08/22/2026B00635730-A9Open ↗
Showing 3 of 10 on file for this type
▸BISSTREET TREE CHECKLIST3
05/19/2023340831595Open ↗
04/13/2023340831595Open ↗
02/07/2022340831595Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/19/2023340831595Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00635730-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00635730-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00635730-I1Open ↗
▸Environmental & Asbestos39
▸DOB NOWOER: Notice to Proceed22
08/15/2026B00635730-P8Open ↗
08/13/2026B00635730-S9Open ↗
08/13/2026B00635730-Z6Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWOER: Notice of Satisfaction11
08/22/2026B00635730-B5Open ↗
08/14/2026B00635730-I1Open ↗
08/13/2026B00635730-B4Open ↗
Showing 3 of 11 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
01/08/2025340915353Open ↗
04/13/2023340831595Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026B01025265-I1Open ↗
Showing 1 of 2 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
07/02/2025340831595Open ↗
▸DOB NOWRodent Control1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis2
08/14/2026B00635730-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY3
04/14/2025340915353Open ↗
04/10/2025340915353Open ↗
01/08/2025340915353Open ↗
▸DOB NOWSOIL REPORT3
08/13/2026B00635730-S8Open ↗
08/13/2026B00635730-S9Open ↗
08/13/2026B00635730-P7Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00635730-S9Open ↗
08/13/2026B00635730-S8Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026B00635730-S8Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/15/2025340915353Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION4
04/15/2025340915353Open ↗
12/19/2024340831595Open ↗
05/19/2023340831595Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/08/2025340915353Open ↗
02/07/2022340831595Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/19/2023340831595Open ↗
▸Other Documents50
▸DOB NOWProperty Ownership Certification12
08/22/2026B00635730-B4Open ↗
08/22/2026B00635730-A9Open ↗
08/22/2026B00635730-A8Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSite Survey: Initial10
08/15/2026B00635730-P8Open ↗
08/13/2026B00635730-A9Open ↗
08/13/2026B00635730-B5Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone10
08/15/2026B00635730-P8Open ↗
Showing 1 of 10 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION7
12/19/2024340831595Open ↗
12/19/2024340831595Open ↗
12/19/2024340831595Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWAdjoining Owners Notification3
08/13/2026B00635730-Z3Open ↗
08/13/2026B00635730-S9Open ↗
08/13/2026B00635730-S8Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/07/2022340831595Open ↗
▸BISPLOT DIAGRAM1
12/03/2024340831595Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B00861833-I1Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCommunity Board Notification1
08/13/2026B00861833-I1Open ↗
▸DOB NOWStructure Photographs1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHPD - Completion Notice1
08/14/2026B00635730-I1Open ↗