← Back
Parsonage, rectory
225 6 AVENUE
BROOKLYN · BIN 3020356
💬 Discuss this project
1931Year Built
4Stories
M3Building Class
R6BZoning
6,500 sfGross Floor Area
1Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Parsonage, rectory · 2,313 sf lot · 2.81 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof2p · 1 filing · 5 docs
Floor 12p · 1 filing · 5 docs
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OLD MASTER CONTRACTING507/08/2026
SAINT THOMAS THE APOSTLE CATHOLIC C407/08/2026
ROCKLYN ASSET CORP503/22/2026
DESIGN TECH CONTRACTING C103/22/2026
FRANCIS XAVIER CHURCH203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANGASH ASSOCIATES INC.110/17/2024
NEW AGE ENGINEERING PLLC106/16/2023
DIPROPERZIO & MALLIA ARCHITECTS,LLP107/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OLD MASTER CONTRACTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GUARANTEED HOME IMPROVEMEGeneral Contractor303/21/2026
DESIGN TECH CONTRACTING CGeneral Contractor207/08/2026
OLD MASTER CONTRACTING COGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488110/17/2024
NEW AGE ENGINEERING PLLC7746106/16/2023
C.M. TESTING LABORATORY,1352107/14/2022
DIPROPERZIO & MALLIA, LLP7517107/14/2022
Building Lifecycle
All (17)Filed (3)Permit Issued (5)Signed Off (2)Violation (5)Special Inspection (2)
06/16/2026
Signed off — Alteration
FACADE REPAIR, GRINDING AND POINTING AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01121748-I1
05/13/2025
Permit issued — General Construction
B01121748-I1-GC
11/25/2024
Permit issued — General Construction
B01121748-I1-GC
10/17/2024
Filed — Alteration
FACADE REPAIR, GRINDING AND POINTING AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01121748-I1
10/03/2024
Special inspection requirement — Masonry
FAZAL BANGASH
10/03/2024
Special inspection requirement — Final
FAZAL BANGASH
12/28/2023
Permit issued — General Construction
B00750826-I1-GC-CX
11/08/2023
Signed off — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS.
B00888091-I1
09/25/2023
Permit issued — Mechanical Systems
B00888091-I1-MS
06/16/2023
Filed — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS.
B00888091-I1
05/06/2023
Violation issued (ECB, open)
Construction
12/20/2022
Permit issued — General Construction
B00750826-I1-GC-CX
07/14/2022
Filed — Alteration
Repair to damaged roof. Repair to 1st floor from termite damage. Replace steel lintels on exterior wall to install new taller overhead roll-down door.
B00750826-I1
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offOLD MASTER CONTRACTING CO05/13/2025
DOB NOWGeneral ConstructionSigned-offOLD MASTER CONTRACTING CO11/25/2024
DOB NOWGeneral ConstructionPermit IssuedDESIGN TECH CONTRACTING C12/28/2023
DOB NOWMechanical SystemsSigned-offGUARANTEED HOME IMPROVEME09/25/2023
DOB NOWGeneral ConstructionPermit IssuedDESIGN TECH CONTRACTING C12/20/2022
BISEQISSUEDROCKLEDGE SCAFFOLD CORP10/02/2001
BISPLISSUEDECONOMY PL CO INC08/05/1997
BISBLISSUEDECONOMY PL CO INC08/05/1997
BISPLISSUEDECONOMY PLUMBING CO.01/11/1996
BISBLISSUEDECONOMY PLUMBING CO.01/11/1996
1 project · most recent 05/01/2019
General Wiring
FiledStatusContractorScope
05/01/2019CompleteANTONIO CERIELLO ELEC INCGeneral Wiring
1 project · most recent 07/14/2022
Steel Wood
FiledStatusContractorScope
07/14/2022Permit IssuedDESIGN TECH CONTRACTING CSteel, Wood
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
10/03/2024MasonryFAZAL BANGASHspecial
10/03/2024FinalFAZAL BANGASHprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026B00750826-I1Request digital key ↗
08/27/2026B00888091-I1Request digital key ↗
08/23/2026B01121748-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026B00888091-I1Open ↗
08/23/2026B01121748-I1Open ↗
08/13/2026B00750826-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01121748-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026B01121748-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B00888091-I1Open ↗
08/23/2026B01121748-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00750826-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026B01121748-I1Open ↗
08/13/2026B00888091-I1Open ↗
08/13/2026B00750826-I1Open ↗
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00750826-I1Open ↗